Not a terminus but Bradford Interchange platforms 3 & 4 can only accommodate 5x 195 vehicles, and Asdo should work fine there.
Last year on a Sunday I travelled as a passenger on a 6-car rake from Manchester Victoria to Leeds but the guard and driver decided to lock out of use the back 3-car unit before leaving Manchester, and kept it locked out of use after changing ends at Bradford. They made a right pig's ear of it, as then at New Pudsey and Bramley they had to draw the leading unit a couple of car lengths past the end of the platforms to accommodate the rear unit, the Asdo knew where it was and would only allow the doors on the front vehicle of the rear unit to be released.