Northern Connect - original plans vs. what actually happened

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

geoffk

Established Member
Joined
4 Aug 2010
Messages
3,223
When I look at the route diagram, that link still seems to be there.
 

The_Engineer

Member
Joined
24 Mar 2018
Messages
524
You're right! Two services originate at Bradford, the Manchester Airport and Nottingham services, it's not easy to see that the line colour changes at Bradford (pale green to pale blue) unless you zoom in......
 

tommy2215

Member
Joined
10 Aug 2017
Messages
341
The map is from July 2016, I think what he is alluding too is that from the list of connect services below the map, Bradford no longer shows where it says Nottingham-Sheffield-Wakefield Westgate-Leeds
 

The_Engineer

Member
Joined
24 Mar 2018
Messages
524
The map is from July 2016, I think what he is alluding too is that from the list of connect services below the map, Bradford no longer shows where it says Nottingham-Sheffield-Wakefield Westgate-Leeds
Knowing Northern, that list could well be a mistake!!
 

marcouk2

Member
Joined
24 Jan 2012
Messages
189
The oldest archived copy on the way back machine is from October 2016 and that list doesn't include Bradford for the Lincoln services so it's not a recent change if its a change at all, might just be an omission that's always been there.
 

tommy2215

Member
Joined
10 Aug 2017
Messages
341
The oldest archived copy on the way back machine is from October 2016 and that list doesn't include Bradford for the Lincoln services so it's not a recent change if its a change at all, might just be an omission that's always been there.
Eh? No Lincoln service was ever going to extend to Bradford.
 

Skymonster

Established Member
Joined
7 Feb 2012
Messages
1,726
Bradford - NOttingham still seems to be a Northern franchise commitment according to the DFT website. I can't see Northern being allowed to get out of it that easily.
 

js1000

Member
Joined
14 Jun 2014
Messages
1,011
Bradford's promised direct link to Sheffield (and beyond to Nottingham) seems to have been quietly dropped from the Northern Connect network.

https://www.northernrailway.co.uk/travel/northern-connect

When did this happen? It seems strange that plans for through services between two of Yorkshire's largest cities should be abandoned.
It's still there from what I can see. The turquoise line at the bottom of Bradford which links to Sheffield.
 

geoffk

Established Member
Joined
4 Aug 2010
Messages
3,223
Interesting to look back at what was planned at the beginning of the Arriva franchise. Their website said that "Northern Connect will be a new network of 12 long distance routes. To be introduced in 2019, it will provide faster connections across Northern England to Leeds, Liverpool, Manchester, Newcastle and Sheffield, including brand new services from Bradford to Manchester Airport and Lincoln to Leeds."

So what's happened?

1. Manchester Airport to Barrow (new build dmu) - in operation
2. Manchester Airport to Blackpool/Windermere (new build emu) - in operation but Windermere is new build DMU
3. Manchester Airport to Liverpool via Warrington Central (new build dmu) - in operation
4. Chester to Leeds via Warrington BQ, MCV, Calder Valley and Bradford (new build dmu) - in operation
5. Liverpool to Leeds via MCV, Calder Valley and Bradford (new build dmu) - not happened
6. Manchester Airport to Leeds via Calder Valley and Bradford (new build dmu) - not happened, runs from Victoria only
7. Leeds to Lincoln via Barnsley and Sheffield (new build dmu) - in operation
8. Sheffield to Scarborough via Doncaster and Hull (new build dmu) - in operation but using class 170 units
9. Middlesbrough to Newcastle (refurb. 158) - not happened, this was to have been a service via Durham and Stockton, not the coast line
10. Newcastle to Carlisle (refurbished 158) - in operation (actually from Morpeth)
11. York to Blackpool via Leeds and Calder Valley (new build dmu) - in operation
12. Bradford to Nottingham via Leeds, Wakefield Westgate and Sheffield (new build dmu) - in operation, but not from Bradford, and via Barnsley

Route 3 is a part replacement for TPE, which will no longer use the CLC route
Route 4 ditto between Warrington and Leeds - BUT route 4 is an all-stations "stopper" between Leeds and Todmorden!

Eight of the 12 services are therefore operating as planned, two of them not with the intended type of unit (one because of cancelled electrification). One other is running in a modified form while three have not been implemented, two because of capacity problems through Manchester.
 

js1000

Member
Joined
14 Jun 2014
Messages
1,011
Interesting to look back at what was planned at the beginning of the Arriva franchise. Their website said that "Northern Connect will be a new network of 12 long distance routes. To be introduced in 2019, it will provide faster connections across Northern England to Leeds, Liverpool, Manchester, Newcastle and Sheffield, including brand new services from Bradford to Manchester Airport and Lincoln to Leeds."

So what's happened?

1. Manchester Airport to Barrow (new build dmu) - in operation
2. Manchester Airport to Blackpool/Windermere (new build emu) - in operation but Windermere is new build DMU
3. Manchester Airport to Liverpool via Warrington Central (new build dmu) - in operation
4. Chester to Leeds via Warrington BQ, MCV, Calder Valley and Bradford (new build dmu) - in operation
5. Liverpool to Leeds via MCV, Calder Valley and Bradford (new build dmu) - not happened
6. Manchester Airport to Leeds via Calder Valley and Bradford (new build dmu) - not happened, runs from Victoria only
7. Leeds to Lincoln via Barnsley and Sheffield (new build dmu) - in operation
8. Sheffield to Scarborough via Doncaster and Hull (new build dmu) - in operation but using class 170 units
9. Middlesbrough to Newcastle (refurb. 158) - not happened, this was to have been a service via Durham and Stockton, not the coast line
10. Newcastle to Carlisle (refurbished 158) - in operation (actually from Morpeth)
11. York to Blackpool via Leeds and Calder Valley (new build dmu) - in operation
12. Bradford to Nottingham via Leeds, Wakefield Westgate and Sheffield (new build dmu) - in operation, but not from Bradford, and via Barnsley

Route 3 is a part replacement for TPE, which will no longer use the CLC route
Route 4 ditto between Warrington and Leeds - BUT route 4 is an all-stations "stopper" between Leeds and Todmorden!

Eight of the 12 services are therefore operating as planned, two of them not with the intended type of unit (one because of cancelled electrification). One other is running in a modified form while three have not been implemented, two because of capacity problems through Manchester.
One of many reasons Arriva believed the franchise agreement agreed in 2015 was essentially invalid and keen to give the franchise back to the government.
 

Wharfe106

Member
Joined
25 Aug 2019
Messages
50
Location
Wharfedale
Interesting to look back at what was planned at the beginning of the Arriva franchise. Their website said that "Northern Connect will be a new network of 12 long distance routes. To be introduced in 2019, it will provide faster connections across Northern England to Leeds, Liverpool, Manchester, Newcastle and Sheffield, including brand new services from Bradford to Manchester Airport and Lincoln to Leeds."

So what's happened?

1. Manchester Airport to Barrow (new build dmu) - in operation
2. Manchester Airport to Blackpool/Windermere (new build emu) - in operation but Windermere is new build DMU
3. Manchester Airport to Liverpool via Warrington Central (new build dmu) - in operation
4. Chester to Leeds via Warrington BQ, MCV, Calder Valley and Bradford (new build dmu) - in operation
5. Liverpool to Leeds via MCV, Calder Valley and Bradford (new build dmu) - not happened
6. Manchester Airport to Leeds via Calder Valley and Bradford (new build dmu) - not happened, runs from Victoria only
7. Leeds to Lincoln via Barnsley and Sheffield (new build dmu) - in operation
8. Sheffield to Scarborough via Doncaster and Hull (new build dmu) - in operation but using class 170 units
9. Middlesbrough to Newcastle (refurb. 158) - not happened, this was to have been a service via Durham and Stockton, not the coast line
10. Newcastle to Carlisle (refurbished 158) - in operation (actually from Morpeth)
11. York to Blackpool via Leeds and Calder Valley (new build dmu) - in operation
12. Bradford to Nottingham via Leeds, Wakefield Westgate and Sheffield (new build dmu) - in operation, but not from Bradford, and via Barnsley

Route 3 is a part replacement for TPE, which will no longer use the CLC route
Route 4 ditto between Warrington and Leeds - BUT route 4 is an all-stations "stopper" between Leeds and Todmorden!

Eight of the 12 services are therefore operating as planned, two of them not with the intended type of unit (one because of cancelled electrification). One other is running in a modified form while three have not been implemented, two because of capacity problems through Manchester.


So not a bad record for a franchise which has been so lambasted. and the third route not implemented, Bradford-Nottingham, that's because there are no paths for that thru Sheffield etc., just because it's in the franchise doesn't mean that Network Rail is bound to provide for it.

With the franchise ending at the end of this month of course all bets are off, and nothing is likely to advance until stability returns and a new subsidy/investment profile is agreed, but with Boris's 'pledge' to boost the North, who knows what will happen for the sake of political gain?
 

YorksDMU

Member
Joined
5 Jul 2019
Messages
216
Location
Beverley
I see, on that map, it was originally Sheffield to Hull only, with no extension to Scarborough. I recall much local opposition to that plan, and it being, eventually, altered to how it is today. People do not like having to change trains.
 

Peter Bonner

Member
Joined
7 Nov 2019
Messages
170
Location
BEVERLEY
I see, on that map, it was originally Sheffield to Hull only, with no extension to Scarborough. I recall much local opposition to that plan, and it being, eventually, altered to how it is today. People do not like having to change trains.

Yes there was a local campaign in Bev to stop the nonsense of losing through train to Doncaster and Sheffield. And it won its case!
Northern envisaged Hull to Sheffield shuttle with new stock under Northern Connect brand.

A through Bridlington to Leeds service was planned but in reality replaced by a Brid to York service in Dec 2019. Not sure if the Leeds service was ever associated with the Northern Connect brand though. Great to have new seevice to York but Leeds wd be more popular.
 

Glenn1969

Established Member
Joined
22 Jan 2019
Messages
1,983
Location
Halifax, Yorks
I think the Brid- Leeds service plan is what became Hull- Halifax

From Calder Valley point of view we are still missing an Airport and a Liverpool service. My thought is that will have to wait until after Transpennine Route Upgrade or NPR creates more paths
 

Peter Bonner

Member
Joined
7 Nov 2019
Messages
170
Location
BEVERLEY
I think the Brid- Leeds service plan is what became Hull- Halifax

From Calder Valley point of view we are still missing an Airport and a Liverpool service. My thought is that will have to wait until after Transpennine Route Upgrade or NPR creates more paths

Yes you are right that the Brid to Leeds plan became Hull to Halifax. A good service in itself but early and late connections onto the Brid line are poor. West Yorks direct wd be far better than York.
 

YorksDMU

Member
Joined
5 Jul 2019
Messages
216
Location
Beverley
For myself, Brid to York is a good service, I no longer have to change trains at Hull. I also agree that a through service to Leeds would be most welcome too. But, as stated, pathing would be quite a problem with things as they stand.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
17,882
Location
Reston City Centre
No bad thing that some of these services aren't happening - they seemed to sum up a lot of the problems with the Northern franchise - the requirement for all of these hourly direct services (which leave a complicated mess of a service pattern, lots of running DMUs under the wires, lots of combining bottlenecks).

The worst example being the plan to run Nottingham - Bradford as part of the same diagrams as Bradford - Manchester Airport - so from Nottingham to Manchester Airport and back - must be best part of ten hours round trip (tagging in the bottlenecks at Sheffield, the need to reverse at Leeds, the Ordeal Chord/ Castlefield and the same in reverse on the return to Nottingham... I'm sure it looked nice on the conceptual drawing board but a nightmare operationally, just for the sake of being seen to create new links.

And don't start me on the nonsense of using DMUs on Nottingham - Leeds with fewer seats than the 158s that have run that route for years - the north really needs fewer complicated long distance services, fewer short trains, fewer trains passing through bottlenecks... if that means we lose the "flagship" Northern Connect services and focus more on unremarkable shorter services then I'm okay with that - a price worth paying.

I see, on that map, it was originally Sheffield to Hull only, with no extension to Scarborough

My memory was that the Hull service was meant to run through to Chesterfield too, but I can't find evidence of that now (was this descaled, or has my memory failed?)
 

ag51ruk

Member
Joined
29 Oct 2014
Messages
629
Northern Connect wasn't just about the trains- 36 stations were supposed to be upgraded as well (longer staffing hours and catering, from memory).

The page mentioned in the first post still exists on the Northern website, promising Northern Connect to be complete from December 2019, with "differentiated marketing and customer service"...
 

Bantamzen

Established Member
Joined
4 Dec 2013
Messages
9,674
Location
Baildon, West Yorkshire
I think its a fair bet that 'Connect' will be dropped under the OLR. Many of the routes, or at least parts of have already been provided and if I'm being honest Bradford losing Liverpool/Sheffield/Nottingham connections isn't that much of a blow. The airport service maybe a bit more, but given all the problems in Manchester is probably best left on the shelf. Better connectivity via Huddersfield might be desirable, at various times during the day there are no advertised connections from Bradford Interchange to Huddersfield, and then directly onto the Manchester Airport services. Usually planners will show changing at Manchester Victoria, or at Huddersfield and Manchester Piccadilly. An advertised change at Huddersfield straight onto an airport service where it is considerably quieter than Victoria or Piccadilly, would at least soften the blow a little.
 

Djgr

Established Member
Joined
30 Jul 2018
Messages
1,639
Northern Connect wasn't just about the trains- 36 stations were supposed to be upgraded as well (longer staffing hours and catering, from memory).

The page mentioned in the first post still exists on the Northern website, promising Northern Connect to be complete from December 2019, with "differentiated marketing and customer service"...

I'm wondering whether the word 'from' is a replacement for 'by'! But yes the actual train service was only a part of the Northern Connect promise and, to my knowledge, precious little else has appeared and nobody has told us what is happening.
 
Last edited:

Peter Bonner

Member
Joined
7 Nov 2019
Messages
170
Location
BEVERLEY
I think its a fair bet that 'Connect' will be dropped under the OLR. Many of the routes, or at least parts of have already been provided and if I'm being honest Bradford losing Liverpool/Sheffield/Nottingham connections isn't that much of a blow. The airport service maybe a bit more, but given all the problems in Manchester is probably best left on the shelf. Better connectivity via Huddersfield might be desirable, at various times during the day there are no advertised connections from Bradford Interchange to Huddersfield, and then directly onto the Manchester Airport services. Usually planners will show changing at Manchester Victoria, or at Huddersfield and Manchester Piccadilly. An advertised change at Huddersfield straight onto an airport service where it is considerably quieter than Victoria or Piccadilly, would at least soften the blow a little.
Excellent suggestion to really promote Northern Bradford to Huddersfield services to connec with Man Airport services. They are TPE though. Connectivity between franchises is an issue and needs to be improved-or just have one operator in the north. In other words a joined up railway.
 

transmanche

Established Member
Joined
27 Feb 2011
Messages
6,018
9. Middlesbrough to Newcastle (refurb. 158) - not happened, this was to have been a service via Durham and Stockton, not the coast line
10. Newcastle to Carlisle (refurbished 158) - in operation (actually from Morpeth)
You've listed these as two separate services, but (as the map shows) it was planned to be one through service: Middlesbrough to Carlisle via Durham & Newcastle. Northern have simply combined the Morpeth to Metrocentre service with a Newcastle to Carlisle service and removed the Newcastle-Metrocentre shuttle.
 

Staffordian

Member
Joined
11 Jul 2019
Messages
113
You've listed these as two separate services, but (as the map shows) it was planned to be one through service: Middlesbrough to Carlisle via Durham & Newcastle. Northern have simply combined the Morpeth to Metrocentre service with a Newcastle to Carlisle service and removed the Newcastle-Metrocentre shuttle.
But it was an additional, faster, Newcastle-Carlisle service, doubling the frequency between the cities. Perhaps one of the most significant service improvements Northern have made.
 

transmanche

Established Member
Joined
27 Feb 2011
Messages
6,018
But it was an additional, faster, Newcastle-Carlisle service, doubling the frequency between the cities. Perhaps one of the most significant service improvements Northern have made.
Indeed, although I did see it mooted on this site that this wasn't a long-term increase and that the current 3tph as far as Hexham would revert back to 2tph in the long term.

As an aside, you now have a situation where the 2Nxx trains generally provide the fast Newcastle-Carlisle service. With the 1Nxx services also stopping at the minor stations, such as Haydon Bridge.

(I assume this happens because the 2Nxx services run along the ECML.)
 

northernchris

Established Member
Joined
24 Jul 2011
Messages
1,509
In which case a total waste of resources. OK suppose it might be argued that it is an alternative to TPE but surely greater priorities.

On the other hand, it's good to see Northern focussing on areas outside of Manchester and Leeds. East and North Yorkshire have long been neglected
 

Peter Bonner

Member
Joined
7 Nov 2019
Messages
170
Location
BEVERLEY
On the other hand, it's good to see Northern focussing on areas outside of Manchester and Leeds. East and North Yorkshire have long been neglected

True but I just want Hull to Scarboro line to be reliable. Wehave been lucky in recent times but over the last week since renationalisation of Northern thete have been too many cancellstions. At least 6 today.
 