• Our booking engine at tickets.railforums.co.uk (powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Northern franchise to end 1 March 2020 with Operator of Last Resort to take over

Status
Not open for further replies.

Mathew S

Established Member
Joined
7 Aug 2017
Messages
2,167
Because re-using the same "name" multiple times is pretty amateurish IMO.
See, the thing is, I don't think anyone in the real world actually cares. Steam engines have names; the 0723 to Manchester, not so much.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

NoMorePacers

Established Member
Joined
18 Feb 2016
Messages
1,392
Location
Humberside
I'm assuming we will all get new coats if not full new uniform rollout as they have 'by arriva' under the logo too.

We're well overdue more uniform anyway.
The Northern uniform is terrible. I pity those who have to wear the bloody things.
 

Llama

Established Member
Joined
29 Apr 2014
Messages
1,955
The old Northern uniform with the pinkish shirts, waistcoats and dark blue Harrington jackets was much better, distinctive and a bit smarter.
 

Llama

Established Member
Joined
29 Apr 2014
Messages
1,955
One of those horrible foam softshell things but without the logos?
 

HH

Established Member
Joined
31 Jul 2009
Messages
4,505
Location
Essex
An interesting article: http://www.passengertransport.co.uk/2020/02/could-you-have-done-a-better-job-at-northern/

Grant Shapps has stripped Arriva of the Northern franchise, blaming the management. But I think that responsibility for its problems lies elsewhere – writes Alex Warner
Grant Shapps got what he wanted, so too did Andy Burnham, the trade unions and the media – because Arriva being stripped of the Northern franchise and suffering ignominy made good headlines. Those in the industry probably also enjoyed it – there’s nothing like tittle-tattling about the demise of someone or other.

Spare a thought, then for Chris Burchell and David Brown, CEOs at Arriva’s Rail Division and Northern respectively. I’ve only really known Burchell in the past two years, but he is someone I’ve admired from a distance for much longer. Chris has long been the blue-eyed boy of rail, scouted by former Go-Ahead boss Keith Ludeman – an ace spotter and developer of bright young talent; Alex Hynes and Charles Horton were also snaffled and fast-tracked by Ludo to the top.

At 32, Burchell was the UK’s youngest ever TOC MD when he took charge of Southern – a network that has perennially struggled for years both before and since his departure. He presided over its most successful period before getting the top job in Arriva Rail. He then secured the Northern and London Overground franchises as well as uplifts in NRPS and performance across all of Arriva’s companies. In 2017 he became chairman of the Rail Delivery Group.

However, it was not the decent KPIs, franchise wins, big jobs or accolades from his direct reports that defined Burchell’s career. In an industry that is often cliquey and riven with professional jealousy and back-biting, he was a grounded person who cared only for the good of the railway, its customers and people. He always acted with the utmost integrity, decency and upheld, at all times, the virtue of collaboration, calm-headedness and responsiveness, when dealing with stakeholders, at every level.

David Brown is another fine man of decent principles, someone who before being tainted by the challenges in Northern, was probably the most revered manager of stakeholders in the North of England and most knowledgeable of anyone as to the issues affecting the communities served in the region by rail. A polished, measured, calm communicator and deep thinker who always did the best for customers and his people – he was a much-respected leader amongst his team and always very focused on their personal development. Brown never sought the headlines for personal exposure – but I suspect he was worn down by the imperfect, impossible structure that he inherited. When he was appointed Northern CEO, it was seen as a massive coup.

It’s worth reflecting on the fact that when industry professionals chide Northern or make throwaway comments about how useless we might believe them to be, actually, there is a case of “there but for the grace of God”. It’s also worth reflecting on the pedigrees of the likes of Burchell and Brown – because if they couldn’t solve Northern’s problems, then could anyone else? Think about that before slagging off the Arriva Rail North leadership on social media or sniping from the sidelines in pubs or at rail industry forums and consider instead the complexity of what Arriva had to grapple with.

This is far more about politics than it is about railways. The alignment of stars that got us to the point at which Arriva lost the franchise is really incredible – everything from Labour policy, the elections – general, mayoral, RMT general secretary – and union positioning behind Labour policy to a strong new government in debt to the North and seeing a ‘quick win’. The personalities in both Arriva and Northern are bright, workaholics rooted in the community. People like people and strategy director Richard Allan and the commercial brain that is wily old fox Mark Powles and the most solid, hardcore operator in the form of Alan Chaplin, no one would have worked harder.

As Burchell very publicly admitted, their plan became undeliverable and he needed to work in partnership to deliver a new one.It doesn’t seem obvious whether or not anyone was willing to do that. Imagine him trying to explain to Arriva’s German owners what was going on in the dysfunctional environment that is UK rail. I suspect Burchell’s was the loneliest of jobs, however supportive his paymasters might have been.

Arriva Rail North’s demise was the “perfect storm”, the delayed electrification schemes paralysing driver and stock availability, coupled with the “role of the guard” strikes that Arriva were, like their counterparts, fighting for the good of the future industry, and a network that experienced a legacy of chronic underinvestment. Yes, they made mistakes, but name me an owning group that has got an unblemished record and would have done any better within these most challenging of circumstances?

That Arriva’s other franchises, Chiltern, Cross Country, Grand Central and London Overground (Arriva Rail London) have had a better track record than most others’ in the industry tells a more accurate tale of its stewardship of railway business. As it is within its bus division, Arriva shows some innovation but more importantly process-orientated, strong corporate governance, with a big emphasis on integrity and impeccable ethics. Hang round HQ reception and the coffee table reading matter is the most comprehensive guide to their business standards – messages that come through loud and clear in meetings with them. Some may say Arriva can be boring, but they are never accused of being a ruthless, misleading, manipulative money-grabbing group and their people are renowned – unlike others – for not having political or personal agendas.

Shapps told The Yorkshire Post last week that the issue was ‘management’ and not having enough drivers and trains. Well Arriva Rail North (contrary to popular belief) always had more drivers than the establishment required – but delivering 12,000 training days on top of running the day-to-day service – often in disruption – mean they were always going to be stretched. They agreed a bespoke training deal with ASLEF to help but it’s too easy with hindsight to say ‘not enough drivers’. The reality is that the issues ran deeper.

Fleets are controlled by the Department for Transport, of course, and cannot be unilaterally increased by operators. Arriva proposed a number of ideas to increase the fleet when electrification damaged the fleet plan. It will also be interesting to see whether the new Northern operator, the DfT’s Operator of Last Resort, are forced to take on Driver Controlled Operation – or will they be let off this government policy to avoid embarrassment?

I will never condone poor customer service and I accept that I’ve never had a perfect journey on Northern. However, what rests uncomfortably with me is that it is always the train operating company that is the social pariah when things go wrong. As the public face of the industry to customers and commentators, including those working elsewhere in the sector, it’s fair game to take pot shots. But the government, Network Rail, policy-makers, suppliers, trade unions and previous operators, right back to BR, are all part of the problem.

It is a collective responsibility, and everyone connected with past and present should look at themselves, rather than at Burchell, Brown and the current team.

We should be more respectful of industry colleagues. Don’t suggest that I’m part of the snowflake generation, worrying about the feelings of well remunerated transport professionals, but it’s incongruous that in this era when we purport to be focused on mental health in the industry, that we don’t reflect on the well-being of those in train companies that are suffering their darkest hours. We talk about “Northern” or “SWR” as though they are humanless, entities, without actually acknowledging that they represent real people.

Everywhere they go, MDs keep spirits high amongst their teams realising the uncertainty they are going through and their social shame because they’re conscious their friends and neighbours are all whispering about how they work for that useless local train company. Don’t tell me TOC MDs are paid a king’s ransom for all this – trust me, I know the facts and many of them aren’t.

So, what for the future of Northern? The OLR team proved supportive on LNER and with Northern, we’ll see high impact customer service improvements and innovation, because it has to be that way. The DfT will be rightly determined to ensure that customers notice the difference – as they have with LNER, which has retained the high performing leadership team.

It will be a good place to be too – LNER folk are happy and so too were people at South Eastern post-Connex – the emphasis was on injecting a feel-good factor, come what may. The OLR will probably operate within a more supportive stakeholder landscape, with a more flexible contract, greater purse-strings and the benefit of the new fleet coming on track. Arriva, as a competent operator, will wonder what they could have done within these circumstances.

Whatever transpires, the key for the sanity of those at Arriva and Northern is to be phlegmatic. For those such as Burchell and Brown, with a career that has been nothing but well-deserved, glory and ascendancy, it would be easy to take all this personally. Let’s hope for all our sake that they don’t jack it in, because right now we need them both. Charles Horton got dog’s abuse for the troubles at GTR and turned his back on the industry – he is now a trainee geography teacher. I hope the current fall guys realise that the railway is like sport – fortunes are all cyclical, sometimes for no other reason than being in the wrong place at the worst possible time.

Similarly, those running the new Northern or any other TOC that might come under public sector ownership, might just as easily have been on the receiving end themselves in different circumstances; if the OLR was looking for leaders to take over a failing train company, they’d probably have Chris Burchell or David Brown high up on their list. Who is not to say, of course, that Brown won’t stay at Northern?

In my time as a “head-hunter” in rail, I’ve realised that the stock of individuals rises and falls depending on the circumstances they find themselves in, ones that are more often than not out of their control. I was at my lowest ebb, jobless and useless after National Express lost the Midland Mainline franchise, having as customer services director presided over then record
NRPS scores.

What I do know, is that there was some genuinely exceptional talent in David Brown and Chris Burchell and others in the Arriva set-up who worked with Northern, as well as the franchise team itself. “Form is temporary, class is permanent” as the old adage goes, and this truism will define other stellar industry professionals who might feel downtrodden following the decision on Northern or the fate that might befall other TOCs in these uncertain months ahead.

VERDICT

Sacking a TOC might make sexy headlines, but the problems on Northern are deep-seated and hugely complex. Let’s hope that whoever is running this train set gets the wider industry and political support that Burchell, Brown and co deserved.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
19,651
Location
Mold, Clwyd
So if Northern is to be managed at the top level by the same management team that runs LNER, can we expect any synergy between the operations?
LNER certainly knows a bit about change management and the introduction of new train fleets (though the hardest part will have been done for them by GWR).
At first sight there's little commonality between the TOCs, but there is some geographic overlap.

If the Operator of Last Resort means anything at all, it's to deliver the DfT's policy of TOC operation - whatever that is.
So it will be interesting if there is any movement of LNER staff/resources to "help" Northern in its hour of need and reconstruction.
Without the strictures of the commercial "firewalls" between franchises, there should be some scope for joint working.
Just as LNER has been able to pilot DfT's new off-peak single fares policy, Northern might present an opportunity for regional/local fares experimentation.

I suppose it will depend on how tightly the new Northern spec is drawn by DfT.
Ideally it should also point the way to the Williams changes coming down the track (ie probably involving Network Rail).
 
Last edited:

Llama

Established Member
Joined
29 Apr 2014
Messages
1,955
Sone of the stuff in that article is utter nonsense. Delayed electrification paralysing driver and stock availability? The delay actually helped - can you imagine how much worse say May 2018 would have been if there was a significant amount more electric traction training thrown in for drivers?

Northern came up with workable diagrams for both units and crew for every timetable change, whether it was as a result of delayed infrastructure or not. The fact that they had, and still to an extent have, not enough units and crew is down to the fact that Newton Heath TMD is the railway equivalent of a dodgy backstreet garage and only 20-30% of drivers at some depots can do their full day's rostered work due to the monumental training backlog which has never been meaningfully addressed.
 

HH

Established Member
Joined
31 Jul 2009
Messages
4,505
Location
Essex
Northern came up with workable diagrams for both units and crew for every timetable change, whether it was as a result of delayed infrastructure or not. The fact that they had, and still to an extent have, not enough units and crew is down to the fact that Newton Heath TMD is the railway equivalent of a dodgy backstreet garage and only 20-30% of drivers at some depots can do their full day's rostered work due to the monumental training backlog which has never been meaningfully addressed.
Training for new trains is a major issue and most TOCs seem to struggle with it. From what I've seen there are two big issues that they mostly fail to deal with:
1. You need extra drivers unless you are already staffed high enough to minimise RDW. Most TOCs rely on RDW, so they will struggle if they suddenly need a lot more. Hence a backlog; and one that only gets worse.
2. The most efficient way to deliver trained drivers for the new trains is to complete whole links at a time, but it's a lot harder to organise training that way, so it doesn't get done. The result is a constant battle each week to match driver to trains.
Put the two together and you have chaos for many, many months until you finally catch up.
 

158756

Established Member
Joined
12 Aug 2014
Messages
1,441
The fact that they had, and still to an extent have, not enough units and crew is down to the fact that Newton Heath TMD is the railway equivalent of a dodgy backstreet garage

What is meant by this - surely all trains are being maintained to the very highest standards? I mean, Northern have never been known for the reliability of their trains, or cleanliness, or any control of which stock goes out on which diagrams... but there should be no difference between the work that gets done at Newton Heath and that done anywhere else.
 

Llama

Established Member
Joined
29 Apr 2014
Messages
1,955
Training for new trains is a major issue and most TOCs seem to struggle with it. From what I've seen there are two big issues that they mostly fail to deal with:
1. You need extra drivers unless you are already staffed high enough to minimise RDW. Most TOCs rely on RDW, so they will struggle if they suddenly need a lot more. Hence a backlog; and one that only gets worse.
2. The most efficient way to deliver trained drivers for the new trains is to complete whole links at a time, but it's a lot harder to organise training that way, so it doesn't get done. The result is a constant battle each week to match driver to trains.
Put the two together and you have chaos for many, many months until you finally catch up.
Imagine trying to do that and starting from a position where you are already fire-fighting every single day on trying to just cover old trains and routes...
 

Llama

Established Member
Joined
29 Apr 2014
Messages
1,955
What is meant by this - surely all trains are being maintained to the very highest standards? I mean, Northern have never been known for the reliability of their trains, or cleanliness, or any control of which stock goes out on which diagrams... but there should be no difference between the work that gets done at Newton Heath and that done anywhere else.
Put it this way, if your car was maintained by them you wouldn't go back. It's a long standing and often heard comment on Newton Heath that 142s are brilliant - in that they've single-handedly put a lot of the fitters' kids through university.
 

Robertj21a

On Moderation
Joined
22 Sep 2013
Messages
7,518
Put it this way, if your car was maintained by them you wouldn't go back. It's a long standing and often heard comment on Newton Heath that 142s are brilliant - in that they've single-handedly put a lot of the fitters' kids through university.

You seem very 'anti' on so many issues. Any reason ?
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
19,651
Location
Mold, Clwyd
Nobody ever mentions the lack of a simulator for training on the new trains.
Class 175 (procured by one of Arriva Northern's predecessors) had one at Chester, which I assume is still in use for TfW crews.
Pendolinos have one at Crewe, with allegedly superb route graphics.
How come a substantial new fleet with a large driver population like the Civitys didn't have one?
Also wouldn't you do things like send drivers to test tracks and manufacturing sites to get ahead of the training curve before the fleet is delivered?
Isn't that how airlines do their training?
 

Greybeard33

Established Member
Joined
18 Feb 2012
Messages
4,266
Location
Greater Manchester
Nobody ever mentions the lack of a simulator for training on the new trains.
Class 175 (procured by one of Arriva Northern's predecessors) had one at Chester, which I assume is still in use for TfW crews.
Pendolinos have one at Crewe, with allegedly superb route graphics.
How come a substantial new fleet with a large driver population like the Civitys didn't have one?
Also wouldn't you do things like send drivers to test tracks and manufacturing sites to get ahead of the training curve before the fleet is delivered?
Isn't that how airlines do their training?
It was reported on another thread that Northern drivers were not even provided with operating manuals for the new trains, despite the complexity of the software systems.
 

Djgr

Established Member
Joined
30 Jul 2018
Messages
1,653
In general it might be expected that the incumbent franchisee would have more accurate knowledge of the capabilities of its people to manage change than would the rival bidders - which will not necessarily be to the incumbent's advantage in the competition, if it prices that knowledge into its bid!

But in the case of Northern, after all those years of "no growth" and little change, Arriva should surely have realised that change management would be a challenge. Right at the start of the franchise in April 2016, the new senior management team should have come in with a plan to shake up the company and make it more change oriented. This might have included, for example, organisational changes, bringing in management consultants, and appraisals/retraining/recruitment of middle managers.

This all needed to be in place well before the (originally planned) December 2017 timetable change and the arrival of the new trains.

Some very sensible, perceptive and believable comments here, which refuses to take the "everyone to blame but Northern" stance
 

Djgr

Established Member
Joined
30 Jul 2018
Messages
1,653
See, the thing is, I don't think anyone in the real world actually cares. Steam engines have names; the 0723 to Manchester, not so much.

Thing is, in the real world, nobody ever wants to see the word "Northern" again.
 

Robertj21a

On Moderation
Joined
22 Sep 2013
Messages
7,518
@Llama is a Northern driver and so has first hand knowledge of the issues "at the coalface", unlike many other contributors to this thread.

Thank you. I quite appreciate first hand, factual, knowledge. It just comes over as rather heavily slanted at times.
 

Mogster

Member
Joined
25 Sep 2018
Messages
905
When my service arrives on time at Salford Crescent, or Piccadilly approach, then loses 10 minutes negotiating central Manchester I don’t view that as Northern’s fault. At peak times hardly anything runs on time travelling accross central Manchester and the Castlefield route is the worst. I’m far from being a Northern apologist but I blame my delay on successive governments of both colours and the DfT.
 

mandub

Member
Joined
4 Mar 2013
Messages
181
Put it this way, if your car was maintained by them you wouldn't go back. It's a long standing and often heard comment on Newton Heath that 142s are brilliant - in that they've single-handedly put a lot of the fitters' kids through university.

Losing Longsight maintenance contract for 323's hasn't helped at Picc either. They all have to be rotated to Allerton now and so we seem to be running around with more faults than we used to.
E.g.running with half traction motors not working for 2 days at a time which never happened when Longsight maintained them.
And when something serious happens no one at Picc signs the route to take them to Allerton for repair so more delay & inefficiency.
 

matt_world2004

Established Member
Joined
5 Nov 2014
Messages
4,504
People defending Northerns performance over the course of the franchise, claiming that delayed infrastructure changes resulted into the poor performance.

Seem to be forgetting that Northern accepted the terms of the franchise in accordance with their bid.if their bid was dependent on network rail infrastructure and third party rolling stock changes. Their bid team should have made it clear that their bid was dependent on those changes and that they would not be able to deliver on all their promises if those changes were not delivered. Or that they would be targeting a lower level of performance without those changes being implemented
 

Mathew S

Established Member
Joined
7 Aug 2017
Messages
2,167
Thing is, in the real world, nobody ever wants to see the word "Northern" again.
Well then they're going to be disappointed, aren't they. Not that the name of the franchise is remotely the point I was addressing.
 

Mathew S

Established Member
Joined
7 Aug 2017
Messages
2,167
When my service arrives on time at Salford Crescent, or Piccadilly approach, then loses 10 minutes negotiating central Manchester I don’t view that as Northern’s fault. At peak times hardly anything runs on time travelling accross central Manchester and the Castlefield route is the worst. I’m far from being a Northern apologist but I blame my delay on successive governments of both colours and the DfT.
Yep, agreed. Arriva/Northern are to blame for lots of things, but it's not (usually) them who are responsible for my journeys being delayed.
 

Roast Veg

Established Member
Joined
28 Oct 2016
Messages
2,200
Nobody ever mentions the lack of a simulator for training on the new trains.
Class 175 (procured by one of Arriva Northern's predecessors) had one at Chester, which I assume is still in use for TfW crews.
Pendolinos have one at Crewe, with allegedly superb route graphics.
How come a substantial new fleet with a large driver population like the Civitys didn't have one?
Also wouldn't you do things like send drivers to test tracks and manufacturing sites to get ahead of the training curve before the fleet is delivered?
Isn't that how airlines do their training?
Simulators are horrendously expensive (sometimes well into seven figures), and take tremendous coordination between manufacturer, TOC, and simulator builder. If the simulator isn't in very regular use, it's cheaper to use the alternatives. Having said that, a combo 195/331 simulator based centrally would have earned its keep I would have thought.
 

Djgr

Established Member
Joined
30 Jul 2018
Messages
1,653
Well then they're going to be disappointed, aren't they. Not that the name of the franchise is remotely the point I was addressing.

Perhaps a charity auction could be held to paint over it? That should raise a good sum.
 

Llama

Established Member
Joined
29 Apr 2014
Messages
1,955
Simulators are horrendously expensive (sometimes well into seven figures), and take tremendous coordination between manufacturer, TOC, and simulator builder. If the simulator isn't in very regular use, it's cheaper to use the alternatives. Having said that, a combo 195/331 simulator based centrally would have earned its keep I would have thought.
Absolutely it would, and it would also carry on darling its keep as an ongoing competency management aid which is desperately needed at Northern.
 
Status
Not open for further replies.

Top