  1. F

    Stevenage platform 5

    Yes.
  2. F

    Stevenage platform 5

    The service is already in place. The Watton terminators already have enough time to extend to Stevenage, terminate there and get back to Watton. There's no real alteration south of Watton (perhaps a minute here or there). There'll be 2tph 7 days per week.
  3. F

    Stevenage platform 5

    The project is ten weeks behind schedule.
  4. F

    Stevenage platform 5

    I've heard that the engineers are downing tools soon due to the virus outbreak.
  5. F

    Stevenage platform 5

    How was what supposed to take 5 years? The turnback project certainly wasn't.
  6. F

    Stevenage platform 5

    No, I'm GTR staff. Heard from management team.
  7. F

    Stevenage platform 5

    First 717 test is booked for 11 March.
  8. F

    Kings Cross ‘uncrossed’ Layout/Remodelling - Information and Updates

    Does anyone know when control of Kings Cross area signalling transfers to York ROC?
  9. F

    Stevenage platform 5

    As far as I'm aware it was supposed to be finished in time for the May 2018 TT. Buses between Stevenage and Hertford were never the plan.
  10. F

    Stevenage platform 5

    Lift shaft is being fitted, and alterations to the bridge. OHLE connected during February blockade.
  11. F

    May 2020 timetable changes

    They've also retimed two of the four Moorgate - Welwyn trains, off-peak. The xx20, xx50 are now xx17, xx47. It might not sound a lot, but it means the Welwyn trains are more evenly spaced. The last job of the off-peak is to move the other two Welwyn's two minutes later - xx02, xx32 instead of...
  12. F

    Stevenage platform 5

    Yes..
  13. F

    Stevenage platform 5

    The bus is Monday - Friday only. Trains run Stevenage - Moorgate on Saturday (1tph) and Sunday (2tph). This Sunday there is engineering work on the loop so the whole line is closed. Buses Stevenage - Alexandra Palace.
  14. F

    GN Class 717

    Ah okay. Thanks for that.
  15. F

    GN Class 717

    Do you know how 18tph was achieved? As a layman looking at OpenTrainTimes, it seems there are 18 sections on the NCL. Are these the same sections that were in place when 18tph was active? Would it be possible to increase from the current maximum of 12tph without signalling changes - say 14tph?
  16. F

    Stevenage platform 5

    Could they be reloaded onto a waggon and taken by train towards Watton, across the points and back down to the worksite?
  17. F

    GN Class 717

    Quite, but at some point they're going to have enough drivers.
  18. F

    GN Class 717

    There's supposed to be 8tph (4 x WGC, 4 x HFN/SVG) on Saturdays, and 6tph (4 x WGC, 2 x SVG) on Sundays. That was 'implemented' in May last year. I think it ran okay first couple of weeks and then there were constant cancellations as drivers were moved to mainline services to try and even the...
  19. F

    Trivia: Large towns in UK with no railway station

    Canvey Island. Population circa 40 000. Closest it came was a horse drawn tram.