Search results

  1. J

    Discussion of signalling headways

    Mod Note: Split from https://www.railforums.co.uk/threads/the-decline-of-gwr.163329/ It is crazy for Network Rail to reduce the headway without actually increasing capacity. The 0-5 performance in the peaks is already less than 50% on many long distance services. 80 seconds sounds like...

Top