• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. N

    New Shipley Train Maintenance Facility

    Sorry you obviously know how the depot is going to work. I’ll just ask my colleague to scrap all of their 3 years of planning and pass it on to the forum experts shall I? I shall say no more on this depot or indeed any other plans for Northern’s future (and it is pretty exciting stuff moving at...
  2. N

    New Shipley Train Maintenance Facility

    The plan we’ve got is a bit more detailed than the one shown in the diagram. For a start it doesn’t show the headshunt which is able to stable a 6 car set.
  3. N

    New Shipley Train Maintenance Facility

    The people doing the unit planning are working off NwR plans with proper schematic planning processes as I hope you would expect.
  4. N

    New Shipley Train Maintenance Facility

    Well that’s the official unit plan for when it opens. I trust the person implicitly who has done the detailed work on this (since the start of the planning for this around 3 years ago). They will go there for the wheel lathe but it isn’t in the LTP plan as you don’t need a unit up there every...
  5. N

    New Shipley Train Maintenance Facility

    Sorry I misread that one as I was thinking of the stabling road lengths at the time. I’ve just been looking at the plans on our system and the plan is for 12 units to stable overnight at Shipley TCC (6x3 car, 6x4 car). There is room for more if required but it’s unnecessary the vast majority of...
  6. N

    HST

    Yes one of the original 253001, 43003 is with Scotrail so should achieve it.
  7. N

    New Shipley Train Maintenance Facility

    Plus the stabling sidings across both sides of the site. A depot is more than just the shed building.
  8. N

    How could Lumo expand/develop/improve?

    But are you Lumo’s target market? The whole idea of it is choice. You choose which suits you best. If you want first class with at seat meal service you choose LNER. If you want a low price and don’t care about a buffet or meal then you choose Lumo.
  9. N

    E. COLI IN TANKING WATER AT SKIPTON - 46 Northern units found with traces

    I wish they’d get their facts right. It wasn’t anywhere near that many units. They’ve stated 25 electric units for a start which is the size of the full east fleet. 333004 hasn’t been anywhere near Skipton in over a month as it’s under repair at NL!
  10. N

    New Shipley Train Maintenance Facility

    More than 8 will be able to be stabled there. Bear in mind the 331’s will be 3 car units (for instance 2 x 331’s will fit on a shed road). The BDQ units will almost certainly stable on the depot whilst the Ilkley units could, although if they remain stabled at Ilkley for operational reasons...
  11. N

    New Shipley Train Maintenance Facility

    It’s not just being built to remove that train though. East Leeds is congested all day and especially so at the start and the end of the day when there are multiple moves on and off depot mixed in with passenger services. By building a dedicated EMU depot in the centre of the routes that these...
  12. N

    New Shipley Train Maintenance Facility

    Scheduled maintenance is still regularly required as well as stabling, CET emptying, external washing, interior cleaning, unscheduled repairs etc…. Shipley needs to be built due to the Neville Hill TRU works closure and an EMU depot costs far more than stabling sidings for DMU’s. As Shipley is...
  13. N

    June 2024 reopening of the line between Clitheroe and Hellifield for passenger trains

    Any change in formation would be STP’d in the units each week which are planned weeks in advance. Ad hoc on the day weather forecast plays no role in this whatsoever and hasn’t in the last 36 years I’ve been on the railway. There is less 4 car working off season now to save fuel/unit miles as...
  14. N

    Azuma seating

    It swings both ways though. This theory is equally applied when people complain about something just because they ‘aren’t’ ok with it.
  15. N

    Baildon landslip

    Yes all re-opened. NR are monitoring the site to make sure all is ok now trains are rumbling past again.
  16. N

    June 2024 reopening of the line between Clitheroe and Hellifield for passenger trains

    We can’t base a timetable around what the weather might be like.
  17. N

    Juniper and Turbostar Mock-Up, c.2000

    Yes 170399 (one vehicle of) was done as a demonstrator for more local services so didn’t have things like luggage racks or tables. The Chapman seats had the basic cushion as seen on the sprinters rather than the more substantial one fitted to the 170’s. Nothing came of it although many years...
  18. N

    Baildon landslip

    Yes still on schedule for reopening Sunday.
  19. N

    Could Bradford Interchange to Leeds be Metroised?

    If it has then the promoters of this are even more naive than I thought. There is space for the existing Halifax terminator from Hull to extend westwards. Are you saying it would cost less to rebuild Skipton - Colne than to extend a few platforms (HBD is already long enough for 5 car trains...
  20. N

    Northern Class 331 East:West unit swap

    30th June is the plan.

Top