Search results

  1. N

    Article - Train leasing companies’ profits investigated by regulator. But should the government “buy out” the ROSCO’s?

    The pseudo DfT contracts for IEPs and the Thameslink fleet are far more lucrative than the ROSCOs and have decades to run. Most of the rosco leases are now co terminus with the end of the operating contract so going to be interesting to see what DfT does with those as they move the under GBR...
  2. N

    2023 Israel - Hamas / Hezbollah war

    Trumps Nobel Peace prize is looking in severe doubt!
  3. N

    Class 701 'Aventra' trains for South Western Railway: progress updates

    At least some public declaration of what has been common knowledge on here for months
  4. N

    Service recovery (or lack of) on GTR Great Northern

    Indeed AI is totally predicated on the ability to process vast amounts of data in microseconds so its totally possible to run 100's of permutations to come up with the best recovery plan in seconds. What it needs though is training to filter out sensible solutions that are deliverable. Still...
  5. N

    Formula 1

    Albon had been placed fourth due to a time penalty on Antonelli but that was reversed on appeal but none the less a good result for Williams. Lets hope the wild ride continues and plenty of drivers remain in the mix.
  6. N

    Southeastern metro fleet replacement/improvement

    There a standard Electrostar bodyshell to which all other variants have a toilet but agree you would have to forgo space and rehash the interior but its not the first train class thats had that done to it.
  7. N

    Southeastern metro fleet replacement/improvement

    Bizarre SE seem fit to retrofit toilets to 707's but not these at the refurbishment - missed opportunity. Are they specced for the replacements?
  8. N

    Formula 1

    Position 1&2 hold good after race 1 rest of the running order a jumble but a long way to go!
  9. N

    HS2 Six Monthly Report Dec 24

    Labour have just largely supported what Torys had already decided so no real reason for the delay but its somewhat irrelevant what its says now as the project is too far gone to change anything.
  10. N

    New DfT rail usage figures, big increase

    Is there the drive to comply with it now like there was pre covid? On my route people regularly stand for more than 20mins but for many thats a choice rather than squash in between two people so of course it would never be classified as PIXC.
  11. N

    Transpennine Route Upgrade and Electrification updates

    Perhaps there are possessions on the diversionary routes?
  12. N

    Transpennine Route Upgrade and Electrification updates

    Thanks for posting update. I like the comment that demolition of the box was expected to be two days! If that was from TRU no wonder the project is going to take so long.
  13. N

    North Downs Line upgarde works - some questions

    Closed again on the 27th April with separate buses to Redhill and Gatwick Airport. Positively looks like we have a weekend service all May!
  14. N

    Class 810 for East Midlands Railway Construction/Introduction Updates

    They need to dial up a bit of investigative journalism rather than waiting for EMR or Hitachi to break cover
  15. N

    Progress on Avanti West Coast's 805/807s Hitachi AT300 sets

    So when the MU speeds are finally implemented will the timings on 805/807 worked services be tightened up?
  16. N

    Thoughts on the Trump presidency

    Currently UK hasn't decided whether its sticking with Trump or going all in with the EU so we are sitting on the fence. In the short term without US there is no way Europe can protect Ukraine so its right that we keep on trying to get the US back onside.
  17. N

    Class 701 SWR introduction delays: what should happen now?

    DfT are on the rack with Treasury to get opex costs down so you would have thought not paying for two fleets would be low hanging fruit! Leaving them at Marchwood i would suggest isn't the best location. That in itself is disgraceful they've had years to get the lighting sorted. We banged...
  18. N

    Class 810 for East Midlands Railway Construction/Introduction Updates

    Were these the first bodyshells assembled at Newton Aycliffe?
  19. N

    Class 810 for East Midlands Railway Construction/Introduction Updates

    The 745s had there problems initially and have only just departed Roger Fords reliability tracker.
  20. N

    MML Electrification: progress updates

    Of course by the time the 810's are ready to use it NR will probably want it retested