• Our booking engine at tickets.railforums.co.uk (powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. M

    The Douro meter gauge lines in Portugal

    I don't understand the bit about a museum at Tua, the only original buildings are open-sided transit sheds. There is an modern open sided covered secure compound in which some metre-gauge items of rolling stock have been stored, which until recently included mallet E166, the last one to work on...
  2. M

    The Douro meter gauge lines in Portugal

    Just returned from a visit to the Linha de Tua. Most of the southern section through the gorge now submerged under water from the Chinese built dam at Foz-Tua. (Line closure by immersion - only been tried successfully once before, Ashover railway). On 28th July official decree removed the Linha...
  3. M

    The 10 greatest railway fails in Portugal from the last 10 years

    I thoroughly agree, it is the most inept railway mamagement i have ever had the misfortune to work with. It did not stop CP from buying a fleet of new mercedes-benz saloon cars for the directors though. --- old post above --- --- new post below --- And add to this:- 1) Sending historic...
  4. M

    Pullman destroyed by fire

    There were 2 almost identical vehicles on that site, one worse than the other that came from Bradford. Hope now they will put the other one in under cover.
  5. M

    GCR steam gala

    Don't know who was driving the Standard 2 on Sunday - never seen such a poor effort. Trying to drag four coaches out of Loughborough Station with the brakes on, then coming to a halt blocking the cross-over and delaying an incoming train. Could have been some idiot photographer who thought it...
  6. M

    portugal railways

    Thanks Guigiaro, will be in the north of Portugal myself in 3 weeks time, so will try Oporto-Pocinho & back before it is closed and stripped. Pity I can't do the last 28Km (20mls) into Barca D'Alva. 600,000 euros made available to CP/CGFT in 2008, and by the time they had paid all the...
  7. M

    Drayton Manor Theme Park loco

    Which railway are you researching? Ian Allan 'abc Miniature Railways' published pre-decimalization (2/6d) gives original as 10.25" gauge line 600yds long. One locomotive, Bo-Bo Petrol (Lanchester 10hp engine with fluid flywheel). American single ended diesel outline. Built by Dove of...
  8. M

    portugal railways

    The line to Guimaraes has been widened to iberian gauge, the line to Braga now electrified and re-aligned for pendolino operation. The rest of the former metre-gauge suburban system is now a standard gauge metro system. The Vouga system is a must - go there 3-4 times a year and still find...
  9. M

    Attempted sale of the historic portuguese train raises scandal and boycott in Europe

    Thats about what we have come to expect from CP. When it comes to running a railway, CP commercial havn't got a clue, they make Railtrack look like a bunch of successful professionals. They run their railway with the same aplomb as the Italians drive boats - better to look good at what you are...

Top