• Our booking engine at tickets.railforums.co.uk (powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. A

    Future services for Liverpool Lime Street?

    Possibly some extensions to the Crewe - Euston TV stopper
  2. A

    Liverpool Lime Street - Brighton journey options

    Thanks everyone. I will look into all of the options. It seems that no advance fares are available on the Sunday from Brighton to any Virgin Trains destinations (I looked at Lime St, New St and Manchester) but there are advance fares from Euston.
  3. A

    Liverpool Lime Street - Brighton journey options

    Thank you horizonflame, I had not thought of the Chiltern option (agreed on the greater comfort). Cheers, no fares are showing for via Kensington Olympia option. All I can see is a £33.20 Off Peak Day Single when I select the "Valid only on Southern and London Midland services" option.
  4. A

    Liverpool Lime Street - Brighton journey options

    Ah thanks for that - I didn't realise that the franchise was changing in December.
  5. A

    Liverpool Lime Street - Brighton journey options

    Hi, I'm looking at travelling from Liverpool Lime Street [LIV] - Brighton [BTN] with a 16-25 railcard on 1st December, travelling back on 3rd December. I am flexible with times. Ideally I would travel with Virgin Trains but the Liverpool - London route seems to always be expensive nowadays...
  6. A

    Liverpool Lime St remodelling

    Any idea what the main reason for the extending these platforms is? The current platform 2 is just over 160m so is tight for 2 x 319. I remember reading that the extensions were for 390s diverted over Chat Moss but this seems unlikely if only 9 car variants fit.
  7. A

    Liverpool Lime St remodelling

    According to @NetworkRailLIV on Twitter, it’s on time. They have mentioned that one new platform opens after Christmas and the other after the Summer 2018 works. Platform 1 will close permanently next Summer.
  8. A

    Liverpool Lime St remodelling

    Works on Chrome/Safari for me but Gensheet states the following: “Unfortunately these file links can break due to stray capital letters in relative links and directory names, so sometimes the pdf structure stops working. This can also seem to happen due to reactions between Adobe Acrobat plugins...
  9. A

    Liverpool Lime St remodelling

    I have found the following information on Gensheet. Perhaps this is what will happen in the future unless the plan has changed. The following platform closures are listed on the Engineering Access Statement (all numbers are the old numbers): Platform 8 - 23/10/17 to 24/12/17 (this is listed...
  10. A

    Bus strikes could hit Merseyside, Greater Manchster and Cheshire

    As it stands, no Arriva services whatsoever. https://www.arrivabus.co.uk/north-west/Latest/planned-industrial-action-by-arriva-drivers-in-the-north-west/
  11. A

    Liverpool Lime St remodelling

    Trains now starting to run as planned.
  12. A

    Low Speed derailment | West Allerton Junction

    The first arrival was 1F26 from London Euston at 2123 so the lines did not reopen earlier.
  13. A

    Liverpool Lime St remodelling

    Will the new platforms be used after Phase 1 or after Phase 2 in 2018?
  14. A

    Liverpool Lime St remodelling

    I've seen this before but without the New TPE train. Presumably this would normally use the other side of the station for the Chat Moss. Still seems strange to remove platform 1 for occasional Pendolinos.
  15. A

    23:38 Liverpool to Manchester: journey from hell?

    This tweet suggests it was a 2 car 150 originally, although based on previous comments I presume another unit arrived and coupled up to this as it departed late. https://twitter.com/kevpeel/status/868234534621523968
  16. A

    Liverpool Lime St remodelling

    Virgin Trains are now using Platform 9 at Lime Street. The end of platform 7 has been closed off to passengers/staff and the ATMs near platform 7 are now unavailable.
  17. A

    Manchester - Liverpool Electrification

    2 x 156 on 2F54 1632 Liverpool Lime Street to Wigan North Western
  18. A

    Liverpool "Sergeant Pepper" line proposal

    There is a Facebook page called Liverpool Underground which contains these fantasies (and has even appeared as a sponsored ad). https://www.facebook.com/liverpoolunderground/
  19. A

    Liverpool Disruption 28 Feb 2017 - RAIB report released 30/11/17

    I was thinking that. It's still there but maybe it is only there to allow turnbacks from the city direction (such as the Preston service).
  20. A

    Liverpool Disruption 28 Feb 2017 - RAIB report released 30/11/17

    Curious how the turnaround works at South Parkway as all arrivals on platform 4 seem to have departed from platform 3, likewise all arrivals from platform 2 departed from platform 1. I presume a shunt is involved but I am surprised there is capacity.

Top