  1. R

    Blackpool - Manchester Electrification

    Overnight runs have appeared in timetable for 23rd and 24th Jan,between Preston/Buckshaw parkway and Manchester Victoria.
  2. R

    Blackpool - Manchester Electrification

    Bolton-ATF cable now in the troughing in the immediate vicinity of Bolton station,altough this is not a continuous run back to Lostock.The work on increasing the height of the tiled wall opposite platform 1 has been completed.Secure fencing is being installed alongside platform 1.Couple of...
  3. R

    Blackpool - Manchester Electrification

    From the Bolton end it looks like they are ready for a pull through of the ATF cable, with all covers removed from the troughing for some considerable distance towards Lostock.Lever street footbridge has had additional wire mesh and signage installed making it look like the worlds biggest...
  4. R

    Blackpool - Manchester Electrification

    Bolton- as far as I could see all OHL temporary fixings now replaced looking south from the station (towards Manchester),to the north there are still a dozen or so in the Bolton west/Bullfield area to be replaced.Work on the ATF troughing in this same area is all but finished.
  5. R

    Blackpool - Manchester Electrification

    Bolton-seems to be an all out effort to complete the ATF troughing to the nw of Bolton station (Bolton west/Bullfield area).2 teams working this morning to join up the gaps.Photo to follow
  6. R

    Blackpool - Manchester Electrification

    Engineers train on ballast duties ,currently parked up at Bolton station.The old ballast from platform 5 drainage works was loaded this morning, new ballast also on board as the work continues.
  7. R

    Blackpool - Manchester Electrification

    Bolton-plenty of activity this morning, mainly to do with the ongoing drainage work on platform 5 track.Some (but not all)temporary fixtures on the wiring runs have now been replaced with permanent fittings.Incidentally,the timetable for the early hours of November 1st and 2nd makes interesting...
  8. R

    Blackpool - Manchester Electrification

    Bolton-platform 5 now has contact and catenary ,starting at a Tensorex drum in Bullfield (just past Morrisons footbridge) through to Orlando St. bridge.Temporary fixings again used in some places.
  9. R

    Blackpool - Manchester Electrification

    Bolton platform 5-a single wire now runs between Newport St/Orlando St bridges, mainly on temporary fittings.Photo later.
  10. R

    Blackpool - Manchester Electrification

    Bolton-a new mast has been fitted to the tiled wall on platform 1,both platform 5 & 1 look good to go for the wiring team with cantilever arms now swung into postion over the tracks.Photos to follow.
  11. R

    Blackpool - Manchester Electrification

    Bolton- apart from platform 1 having a severe deveg and continued work on ATF troughing on platform 5 nothing has changed.Platforms 1 & 5 remain unwired, all temporary fixtures and fittings remain in place on the wires that are up within the station area.In short, no progress.
  12. R

    Blackpool - Manchester Electrification

    Bolton-platform 3 run off towards Bradshawgate tunnel now wired.Platform 5 wiring has started and further work noted in the Bullfield area.Photos to follow
  13. R

    Blackpool - Manchester Electrification

    Not yet, hope to do full Bolton tour tomorrow.
  14. R

    Blackpool - Manchester Electrification

    Bolton- platform 3 now wired, some temporary fixings being used.
  15. R

    Blackpool - Manchester Electrification

    Bolton-platform 4 wired from Weston St through Bolton station and onwards to Deane Clough area.Pics to follow.
  16. R

    Blackpool - Manchester Electrification

    Bolton-the twin boom mast adjacent to Morrisons footbridge has been reinstated overnight.
  17. R

    Blackpool - Manchester Electrification

    Bolton-no time lost in utilising the new anchor point on platform 2,wires up from the station to at least Weston St bridge.Temporary fixings at present.Will forward pic.
  18. R

    Blackpool - Manchester Electrification

    Bolton-platform 5 now wired(contact and catenary)from the points at Weston St to Orlando St bridge.Pics to follow.
  19. R

    Blackpool - Manchester Electrification

    Bolton-stovepipes fixed to Trinity Street(station) road bridge,pic later.
  20. R

    Blackpool - Manchester Electrification

    Bolton-C&C wires up as far as Lever St footbridge, up line only.will forward pic

Top