• Our booking engine at tickets.railforums.co.uk (powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. T

    Bristol Temple Meads Station - would a new path from Bath Road bridge to the new eastern entrance be a good idea?

    It would still be a much more direct and shorter route for everyone heading to the station from the Bath Rd or Totterdown area. Also possibly more pleasant, since it bypasses the need to navigate that horrible half-footpath-half-cyclepath concoction on Bath Bridge roundabout which is unpleasant...
  2. T

    Bristol Temple Meads works

    There's also the former Kwik Fit site, which IIRC will feature a new MSCP and another entrance to the station via a bridge next to the tracks towards platform 4 ('Southern Gateway')
  3. T

    Portishead approved

    There will also be new stations on the Henbury spur line, North Filton (YTL arena) and Henbury, which are now scheduled to open in 2026 at the earliest, also with one service per hour for starters (thread), so maybe those could/will be operated together somehow? Another thing to keep in mind...
  4. T

    Temple Meads Quarter & Bristol TM redevelopment.

    I think a new MSCP (and also cycle parking) is planned as part of the "Southern Gateway" scheme (with direct access to the station via a pedestrian bridge alongside the tracks). The MSCP would be on the current Kwik Fit site on Bath Road / A4. I don't know if this will include short term parking...
  5. T

    Great Western Electrification Progress

    But they have already completed the expensive/intrusive bits like lowering the track in the Box tunnel, right?
  6. T

    Arup wins £60m Bristol rail link design new Portishead station

    For what it's worth, on the MetroWest website it says:
  7. T

    Arup wins £60m Bristol rail link design new Portishead station

    See WoE Joint Transport Board - 17 June 2016 Agenda and Papers (zip) - PDF document Item 8 - Major Transport Projects 17 Jun 2016, Appendix 3 "MetroBus Programme Exception Report" for more details: I believe cost impact mentioned elsewhere was £1-2m, but I do not have a source for that at hand.
  8. T

    Great Western Electrification Progress

    Presumably that's "just" Bristol Parkway though? Did they mention anything about Temple Meads?
  9. T

    Arup wins £60m Bristol rail link design new Portishead station

    From the Agenda and Papers for the 29 Jan 2016 meeting of the Joint Transport Board presumably.
  10. T

    Great Western Electrification Progress

    Does the demolition of the signal box at TM depend on the resignalling work being completed? If yes, does that basically mean it won't be demolished until much later, and the Digby-Wyatt shed won't see new platforms/tracks until much later?
  11. T

    Great Western Electrification Progress

    Is my reading of the report right that the actual redevelopment of Bristol TM will only happen in CP6 now? It says that in CP5 only "passenger circulation works" (whatever those may be) will be delivered, while the "reinstatement of platforms within the Midland Shed capable of accommodating a...
  12. T

    Great Western Electrification Progress

    I find it hard to believe that Bristol TM to Parkway along Filton Bank won't be electrified in the first wave, but then I also don't quite see how they're going to finish the Bristol Temple Meads redevelopment in time, seeing that the masterplan is still outstanding. Perhaps the two are not...
  13. T

    Great Western Electrification Progress

    Do you happen to know what the rationale was for this? Cost reduction? Maintaining the parts of the building currently in use for other purposes (shorter trains presumably need shorter platforms)? Minimise distance between local services to facilitate inter-modal exchange (MetroBus and...

Top