• Our booking engine at tickets.railforums.co.uk (powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. M

    Wixams (Bedfordshire) station should be built with 4 platforms

    The problem with the existing station design is the island platform. It is currently planned to be located between the up slow and the down slow. This is the wrong location. It should be located between the up fast and down slow, similar to other MML stations. It would then be future proofed to...
  2. M

    Wixams (Bedfordshire) station should be built with 4 platforms

    2 track railway on the MML so some Sundays only the fasts are in use. Not possible to call at Wixams. No Sunday service on the Marston Vale, therefore no service at Kempston Hardwick. We should really be questioning why has it become so expensive to build a fairly basic station in this country...
  3. M

    Wixams (Bedfordshire) station should be built with 4 platforms

    Imagine being a resident on the Wixams housing estate. You might be able to walk or cycle to the new train station, but your estate roads will be clogged full of parked vehicles from customers driving from the surrounding area and either choosing free Street parking as opposed to paying the...
  4. M

    New station: Wixams, Bedfordshire. Planning approved

    Plan of station from Bedford Borough Council website. The following link confirms they plan to close the station after 10pm. Although they don't appear to be aware of weekend closures or unplanned events such as a line defect or train breakdown on the slow line which would prevent trains...
  5. M

    Wixams (Bedfordshire) station should be built with 4 platforms

    The existing plans have a platform on the up slow with the main station building and car park on the east side. A second platform between the up slow and down slow, with a bridge and presumably lifts connecting both. If the second platform was instead correctly positioned between the down slow...
  6. M

    Wixams (Bedfordshire) station should be built with 4 platforms

    No I'm proposing that Wixams should be built with 4 platforms. There is a good reason why Leagrave, Harlington and Flitwick all operate with 4 platforms. The majority of services only use the platforms on the slow lines, but operational flexibility and resilience requires platforms on the fast...
  7. M

    Wixams (Bedfordshire) station should be built with 4 platforms

    The Midland mainline has the fasts on the west side and the Slows on the east side. The current flawed design has a single platform with station building on the up slow furthest east and a second island platform between the up and down slow lines. It is this island platform which as it currently...
  8. M

    Wixams (Bedfordshire) station should be built with 4 platforms

    Wixams needs to be a 4 platform station from the outset. The MML operates as a 2 track railway during periods of regular maintenance, and delivering a station only on the slow lines will mean either frequent costly rail replacement or no service at weekends and overnight. The Universal Studios...
  9. M

    Why are XC allowed to continue?

    The question which really needs to be asked is why aren't XC generating enough revenue to fund investment in longer and more frequent trains? The trains I have seen across a number of different routes always well loaded, indeed excessively so in some cases which often deters repeat business. But...
  10. M

    Make rail travel free

    It really can't be free. It can be free at the point of use, and paid for by the taxpayer, but then we need to know how much each taxpayer would be spending extra each year to fund it, bearing in mind they already partially subsidise the railways. Some taxpayers will be paying extra for a...
  11. M

    Overcrowding on Chiltern Line: How can this be resolved?

    Could they use class 67s and increase the length of the coaching stock ? So quieter loco and more capacity with more seats for Birmingham and Oxford. Or are the platforms not long enough?
  12. M

    Potential up to 2,000 job losses at Alstom Derby

    A follow on order to increase the length of Class 345 Aventra units from 9-car to 11-car would provide some immediate support for Derby. The additional 140 coaches would help to reduce overcrowding on the Elizabeth line. Similarly increasing the length of Azumas from 9-car to 10-car would...
  13. M

    Potential future uses for class 68 & Mk5 sets?

    There have been many comments that 68 plus Mk5 sets are expensive to operate, but is this simply a consequence of operating them in 5-car formations? Would it be possible to find a route where this stock could operate in longer formations? The cost per seat would surely reduce if operated as a 7...
  14. M

    EMR Class 360's

    Today 3 out of the 6 diagrams are now operating as 4-car units yet again. The services are full and standing, absolutely rammed solid. 9 serviceable units out of a fleet of 21 is an appalling level of performance. Is it time for EMR to abandon all hope of using these units as intended? Are the...
  15. M

    EMR Class 360's

    4-car unit on the 20.15 from London St Pancras to Corby this evening. Completely full and standing with not a free seat until Bedford. Carpets are filthy but the disgrace is they can't keep at least 12 serviceable units from a fleet of 21. Shocking maintenance standards.
  16. M

    Future of Class 379

    Someone needs to design a system which detects the application of graffiti on the toilet walls and triggers a locking mechanism on the toilet door to trap the little scrote inside. Preferably for days or weeks.
  17. M

    Marston Vale line suspension over - FULL services start running 19/02/24

    And let us not forget, this is merely the return of a Class 150 fleet to the line. They first operated these services in 1999. But the new coat of paint obviously makes all the difference.
  18. M

    EMR Class 360's

    There was an apology from the train manager on 360120 this morning on its first journey to London regarding the short formation due to failure of the other unit. But then EMR haven't rectified the issue and it's remained short formed for the rest of the day. 11 in service from a fleet of 21, so...
  19. M

    Marston Vale line suspension over - FULL services start running 19/02/24

    Is there a reason why the drivers of the class 150s used on the Marston Vale have to be part of the larger mainline pool of drivers? I had always imagined incorrectly as it turns out that LNR had a dedicated team who spent all day and every day on the branch line. Surely if this was the case at...
  20. M

    EMR Class 360's

    If all 6 diagrams per day are 8-car that requires 12 out of the 21 units in service. Where are the other 9 units for 7 days per week? They can't all be in maintenance surely? I mean it's not as if they've been taken out of use for overhaul and refurbishment. Can someone identify whether some of...

Top