• Our booking engine at tickets.railforums.co.uk (powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. R

    Blackpool - Manchester Electrification

    From what I could see around the evening peak it was a full electric service between Euxton and Lostock Junction. The northbound TPE became delayed as it was stuck behind the Man Vic - Preston stopper. I was a little surprised it didn't make use of the new platform at Bolton to overtake...
  2. R

    Blackpool - Manchester Electrification

    Provisional TPE timings Oxford Rd to Preston are typically 32 minutes after the May timetable change. This one shows 31 minutes: http://www.realtimetrains.co.uk/train/Y00586/2019/06/19/advanced My understanding was that 185s are not permitted to run at MU speeds.
  3. R

    Blackpool - Manchester Electrification

    Finally!! Great to see an electric train running through Buckshaw. I have added a (dreadful quality, sorry) video to go alongside the first electric runs on the Blackpool line. https://www.flickr.com/photos/147506051@N02/sets/72157679909475566/
  4. R

    Blackpool - Manchester Electrification

    I nearly gave up as well, but I thought it must be a 319 given the real time data on RTT between Oxford Road and Preston.
  5. R

    Blackpool - Manchester Electrification

    I have now uploaded vids of what I'm pretty sure are the first electric passenger services to and from Blackpool. 1U90 0843 Blackpool N to Airport. 1N42 1043 Airport to Blackpool N. Also 1F05 1132 Blackpool N to Liverpool LS. https://www.flickr.com/photos/147506051@N02/sets/72157679909475566/
  6. R

    Blackpool - Manchester Electrification

    1U90 0843 Blackpool to Airport was 319. Vid to follow.
  7. R

    Blackpool - Manchester Electrification

    Disappointingly just a sprinter
  8. R

    Blackpool - Manchester Electrification

    Absolutely! I certainly wasn't expecting 5N19 to show up when it did.
  9. R

    Blackpool - Manchester Electrification

    Some vids of 319s to Blackpool, alongside Tom Benson Way. 5N19 running about 1 hour early, followed by 5F85. https://www.flickr.com/photos/147506051@N02/sets/72157679909475566/
  10. R

    Blackpool - Manchester Electrification

    I have added a couple of videos of the pendolino test runs. One shows the first test run accelerating away from Fylde Junction, and the second the return journey through Salwick. https://www.flickr.com/photos/147506051@N02/albums/72157679909475566
  11. R

    Blackpool - Manchester Electrification

    Also the May timetable shows 50 minute off peak journey times Preston to Lime Street, which is a significant improvement. Unfortunately, peak morning services will be stoppers though. http://www.realtimetrains.co.uk/train/Y23223/2018/05/21/advanced
  12. R

    Blackpool - Manchester Electrification

    I took a few shots around the Kirkham Tip area today, including some DMU driver training runs. The footbridge on the Blackpool side has not been opened yet, but otherwise the work is looking complete. https://www.flickr.com/photos/147506051@N02/albums/72157679909475566
  13. R

    Blackpool - Manchester Electrification

    Great photos and pleasing progress. It also looks like both lines are fully wired along Tom Benson Way now.
  14. R

    Blackpool - Manchester Electrification

    I took a few shots this evening between Salwick and Preston. Still no wire on the Down line alongside Tom Benson Way. Did not see any sign of a gap on the Up but couldn't say for sure if it was completely plugged. https://www.flickr.com/photos/147506051@N02/sets/72157679909475566
  15. R

    Blackpool - Manchester Electrification

    Apologies, I have edited my post to clarify that I am referring to Manchester-Preston.
  16. R

    Blackpool - Manchester Electrification

    https://www.networkrailmediacentre.co.uk/news/customers-reminded-to-check-before-they-travel-before-and-during-easter-as-work-continues-on-great-north-rail-project They are no longer promising 'faster' journeys for Manchester-Preston from December 2018. It looks like this has been revised to...
  17. R

    Blackpool - Manchester Electrification

    I managed to get a few shots of the work going on today around Chorley tunnel and the flying arches. https://www.flickr.com/photos/147506051@N02/sets/72157679909475566/
  18. R

    Manchester - Stalybridge Electrification

    Thanks, I was referring to the hourly Preston 319 once the wires to Bolton are complete, but I hadn't spotted the 0600.
  19. R

    Manchester - Stalybridge Electrification

    Or, as previously mentioned in this thread, that in the provisional May timetable only 1 out of 25 departures per hour are electric services...... http://www.realtimetrains.co.uk/search/advanced/MCV/2018/05/31/0000-2359?stp=WVS&show=all&order=wtt
  20. R

    Blackpool - Manchester Electrification

    Thanks very much for the explanation

Top