• Our booking engine at tickets.railforums.co.uk (powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. W

    Why did Eurostar go with Siemens Velaro rather than the Alstom AGV?

    Is anybody going to answer the question; was it technical, political, greased palms, downright bloody mindless, or pro siemens or anti Alstom clic within SNCF (you can forget any E* board input was minimal as usual)?
  2. W

    Velaro UK construction progress (New Eurostar rolling stock)

    If ES and partners should be successful with the East Coast franchise they may be able to supplement the current fleet with Nols, which incedently have not retained their channel tunnel running status.
  3. W

    New route added to London Overground concession from May 2015

    Forget Orient Way, the lease to GA will soon be up and mostly likely to become additional HS1 sidings
  4. W

    Refurbished Eurostar?

    The contractor (CEIT) for the interiors has gone into liquidation and all the components being manufactured by them or sub contactors have been seized by the liquidators. Consequently the only completed units are the two powercars 3015/6. All the trailers are still "work in progress". There...
  5. W

    Eurostar Class 373/374?

    Running under own power within TMI only, being used for engineering training. Not allowed out to play on the HS1 until signalling upgrades have been made, but still no dates.
  6. W

    Eurostar Class 373/374?

    The company (CEIT) who were contracted to supply the majority of the interior components has gone bust, without anywhere near being able to supply all the components required so that has put 3015/16 trailers into the long grass, for the foreseeable future Another set has gone to Hellemes, but...
  7. W

    Would class 395 be able to operate to France?

    Originally the 373 had been intended to split into two half sets. if a tunnel failure occurred. The passengers in the dead set would moved in the other set, the train would then split from the dead set and driven out of the tunnel. Although practiced years ago, it has never happened in realtime...
  8. W

    UK Government Eurostar sale

    Yes I'll go along with SNCF, but using one of their private companies Keolis, who are a the bid partner of the eurostar bid for the ECML.
  9. W

    Eurostar Velaro UK still in Belgium for test

    She's been "tagged" down both sides at Forest Depot, during last weekend. So off for a respray next move?
  10. W

    New Stations

    Lea Bridge Rd between Stratford and Tottenham Hale. some prelimary work has already been done. But no reopening date as yet (should be during 2014)
  11. W

    What stock "should" operate Liverpool-Norwich services?

    In October according to public accounts (that tax pays money) HS2 spent £200,000 on PR and £250,000 on PR "advice" from KPMG. This is from the public purse that pays for everything from normal railway funding to school dinners subsidy.
  12. W

    What stock "should" operate Liverpool-Norwich services?

    I travel a couple of times a month on this service between Grantham and Norwich. Lots of nice ideas on these posts regarding rolling stock. but the infrastructure at the eastern end will still cause problems for years to come. Ely: All the money is now to be spent on ungrading the King...
  13. W

    Refurbished Eurostar?

    Got it wrong. My be confused as Le Landy do carry out in service heavy maintenance for ES from time to time.
  14. W

    Refurbished Eurostar?

    Trialling completed, but none of the 3015/16 R1-R18 completed at Hellemmes
  15. W

    Refurbished Eurostar?

    Latest estimates is April/May 2014 The budget is not unlimited. The funding for the 373 refurb is part of original financial deal negotiated for the purchase of 374 sets (total cost £700m, refurbs £200m) --- old post above --- --- new post below --- If you travel by temple mills on the...
  16. W

    UK Storms

    Lots of very valid points from the posts in this thread. My own conclusion is that of the many routes that I have travelled during the last couple of summers, have the appearance of a railway passing through an enchanted forest which is very nice for summer leisure trips, but fatal for winter...
  17. W

    "Eurostar bids for East Coast Main Line franchise"

    if they did they would have to be called grubby white rose to match their TMST cousins current condition. Looks like a play off between the frogs and Gerry's to me (SNCF & DB)
  18. W

    Refurbished Eurostar?

    373's were designed for a working life of 30 years, and in common with SNCF TGV's of the same era a mid life rebuild at approximately 15 years. If this scheme had been adhered to then the whole fleet would have been rebuilt during the period 2007 to 2009. Ballast damaged at 186 mph can be...
  19. W

    Refurbished Eurostar?

    Some TMST sets had been provisionally withdraw from service. But I have heard that the continuing delays (nothing now scheduled in 2013) to Velaro deliveries and the 373 set being refurbed at Hellemmes have thrown a spanner into the works. Last time I saw a NOL in service it was diagrammed...
  20. W

    Refurbished Eurostar?

    Still at Hellemme in pieces and costing millions for stuff not budgeted for.

Top