• Our booking engine at tickets.railforums.co.uk (powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. Supercoss

    Help with translation.

    On diagram Left to right direction = facing , diverging right to left direction = - trailing, converging
  2. Supercoss

    Problem 11/02/24 - Midland ML - 1Y27 failure?

    Transformer fault , empty to Kettering depot
  3. Supercoss

    UIC 568 cable

    East Coast Main Line , where the Mark 4 push pull stock operated.
  4. Supercoss

    Work site markers boards! Do you need a swp to place them out?

    Simple answer is Yes bottom of page 8 refers https://shannonrail.com/wp-content/uploads/flip/kpc/kpc_NR9925_coss.pdf pts + iwa + ps
  5. Supercoss

    St Pancras Thameslink rail noise

    Have you noticed the dirty cab sides on units where the on board lubricators on leading wheel set are not aligned properly adding to 'flange squeal ?
  6. Supercoss

    Bedford to Bletchley midland (BBM)

    Main section controlled by MV Marston Vale (Ridgmont) fringes at Bletchley to TK ( Tring to Keynes) from Rugby SCC and at Bedford to WH West Hampstead, Bedford workstation was resignalled back in September 2004 (6th)
  7. Supercoss

    Class 810 for East Midlands Railway Construction/Introduction Updates

    810s will run on overhead power from St Pancras to just North of Cricklewood station the run on Diesel power to Bedford in down direction , into London Up , pan down at Bedford until just North of Cricklewood , 5miles 30ch to be exact where line speed changes from 95 to 110 mph with a 100...
  8. Supercoss

    Ishihara Test Failure Medical

    For signalling grades, specific to staff moving from mechanical boxes or "NX" boxes onto computer based vdu systems the following test is widely used https://www.colorlitelens.com/lantern-test gives you a result at the end also related to original post -...
  9. Supercoss

    New Brent Cross West (Thameslink) station

    Curiously on opening day , the slow lines are closed until 09:30 so the first trains will use platform 3 & 4. official ceremony expected mid Morning rather than 1st train time 06:47
  10. Supercoss

    New Brent Cross West (Thameslink) station

    (Internal publication) weekly operation notice shows entry into service from start of service Sunday 10th so From 06:30 onwards.
  11. Supercoss

    Rail Adhesion Train (RAT) on the District line

    Usually heads back to Neasden and can be viewed at Wembley Park at 10:05 most mornings , two similar 5 car sets active and a 3 car ' double ended' set in reserve for spares. platform 6 at Wembley Park
  12. Supercoss

    New Brent Cross West (Thameslink) station

    Will be from start of service Sunday Dec 10th so about 06:45 into town and 07:00 out of town official opening being published operationally from 06:30 rather than Saturday night into Sunday last trains before maintenance gap
  13. Supercoss

    MML: urgent repairs to the track taking place at Braybrooke

    Tamping tonight ( TUE ) then daytime tomorrow Expect Something a little heavier ( with a nose) booked to make several passes to consolidate ballast and formation, stone drop and further tamping Wednesday night then detailed inspection by engineers on ' top'.
  14. Supercoss

    TC remains occupied after train passed

    Without getting too technical in competences framework S&T can operate points for maintenance fault finding but can not operate points to set a route unless they have points operator competence which is different to signal maintenance handbook functions.
  15. Supercoss

    TC remains occupied after train passed

    Phone route control anything On adjacent line that can have a look across ? mobile manager requested , points operated manually to route required S&T techs / fault team to site after interrogating data logger and intelligent infrastructure if fitted obstruction in open switch removed /...
  16. Supercoss

    Thameslink Core pantograph strike

    signage exists at Farringdon and city Thameslink ( pictured) on both platforms , the ' end of wire' is at far end where daylight is you could install APC magnets here at south end of city Thameslink platform but that would just cut power not cause pan to lower APCo Balise now these are...
  17. Supercoss

    Thameslink Core pantograph strike

    The dual voltage section from Farringdon platform to City Thameslink has Southbound trains arrive with pans raised and pick up shoes in contact with conductor rail , Northbound a train arrives at City Thameslink with shoes in contact with conductor rail , the pan is then raised but as the...
  18. Supercoss

    New Brent Cross West (Thameslink) station

    December 10th ( timetable change day) has been advised as entry into service day for the new station , the previously advised date in October will not be met.
  19. Supercoss

    Train Length Reminder

    319 cab with train length set to " 4" above speedo
  20. Supercoss

    Are HSTs considered 'unsafe'?

    If you scroll down this recently published report from Australia (ATSB) which involves an XPT overturning and sliding for some considerable distance, interesting notes on XPT/HST comparison especially side cab doors https://www.atsb.gov.au/publications/investigation_reports/2020/rair/ro-2020-002

Top