• Our booking engine at tickets.railforums.co.uk (powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. B

    Why isn't the Elizabeth Line Core Driverless? (Ditto HS2)

    The Elizabeth Line already has diagrammed driver changeovers at Maidenhead, Paddington Low Level and Gidea Park
  2. B

    GWML / Elizabeth line disruption due to OLE down near Paddington

    No. Also, drivers are not allowed out in Westbourne Park without being escorted.
  3. B

    GWML / Elizabeth line disruption due to OLE down near Paddington

    The OHLE was switched off from Pad to Maidenhead neutral section.
  4. B

    Elizabeth Line now has most cancellations

    The BBC is reporting that the Elizabeth Line now has the highest % of cancelled trains. As many of the problems are not their making how can they get back to of the most reliable railways? https://www.bbc.co.uk/news/uk-england-london-66754481
  5. B

    Elizabeth line reliability issues

    It's not the driver stopping it. The PIS stops itself and pauses before announcing the next station.
  6. B

    Elizabeth line reliability issues

    There seems to be a train fail at Paddington every day at the moment after completing an AR move. With 100+ moves a day they need to make it significantly more reliable.
  7. B

    Elizabeth line reliability issues

    There is also EE WiFi in core stations as well.
  8. B

    London’s newest train line is now also its busiest - The Economist, UK

    I think an equally significant question to ask would be: Is there capacity to stable the trains? As OOC, Shenfield, Gidea and Maidenhead are only built for 9 cars.
  9. B

    Elizabeth line: Commuters say service 'not what was promised'

    It also states 1 in 6 national rail journeys in the UK are on the Elizabeth Line, which I think is pretty phenomenal. https://www.standard.co.uk/news/transport/passengers-elizabeth-line-soar-41-per-cent-tfl-overcrowding-b1067730.html The £20bn line, which opened through central London last...
  10. B

    Elizabeth line: Commuters say service 'not what was promised'

    1676042159 Sorry, failing miserably to reply correctly. Not to stop orders can also be given by the signaller or control via the GSM-R as it's a recorded line.
  11. B

    Crossrail - Through Running confirmed for November

    They have 2 plans for each day, in case the strikes are cancelled so can revert to normal running.
  12. B

    Crossrail - Through Running confirmed for November

    RMT have cancelled the strikes so should be normal running now.
  13. B

    Crossrail - operating discussion and opening day 24th May

    After today the next closure in the Abbey Wood to Paddington section is Christmas day. https://tfl.gov.uk/status-updates/planned-track-closures
  14. B

    Crossrail - operating discussion and opening day 24th May

    Max line speed through platforms is 42mph. The train drives to arrive at the right time, so it only goes as fast as it needs to in order to pass Bond Street at the booked time, then speeds up to arrive at Paddington or Tottenham Court Road at the right time. When Bond Street opens it will speed...
  15. B

    Crossrail - Through Running confirmed for November

    Yes, all the core stations were designed to allow the trains to be extended to 11 car in the future. There are plain glass panels at one end or the other.
  16. B

    Crossrail - Through Running confirmed for November

    Thanks. I posted it all as this was the first time I've seen that 4 services will come from the east and start advertised services at Whitechapel.
  17. B

    Crossrail - Through Running confirmed for November

    From Monday 5 September test trains that operate in the COS in the early morning will become advertised trains. The first trains (now advertised) Westbound will be the 0534 from Abbey Wood to Paddington and Eastbound, the 0544 Paddington to Abbey Wood. Four services will run empty from the East...
  18. B

    Crossrail - Through Running confirmed for November

    They currently cover the semi fast reading services into the shorter platform 14. Once everything else goes to to the low level it will free up platforms for them to become full length units.
  19. B

    Crossrail - operating discussion and opening day 24th May

    It probably helps test everything, such as all the platform PIS screens. It's all interlinked they might not be able to run it them without being 'in passenger service'
  20. B

    Crossrail Project’s new cab view video

    The light indicates the PEDs are closed

Top