• Our booking engine at tickets.railforums.co.uk (powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. W

    16 Coach EMU?

    At East Croydon recently, I saw a train advertised on the indicators going to London Victoria, and stating it had 16 coaches! (It even said 'Front 12 coaches only for Clapham Junction') I took a picture of the indicator so I know I wasn't dreaming it. Is this a real thing or just some sort...
  2. W

    TPE franchise awarded to First

    This is assuming all the trains are the same specification and number of carriages. The order could be a mix of formation lengths, 4, 5, 6 or more carriages, who knows?
  3. W

    Crewe station - overall plan

    I don't know, but I suppose it will depend on HS2 and whatever work is needed for that when (if) it is built?
  4. W

    Beggars!

    People give them money on the trains because passengers feel intimidated and trapped in a confined space, and some of the beggars look seriously threatening. It's akin to a form of mugging in my opinion. Used to see them regularly between East Croydon and Clapham Junction, they would work a...
  5. W

    Optimum number of platforms

    Ok make it timetable based, yes there would be sufficient S&C, trains arriving every 2-3 minutes, as stated in the first post (I'm assuming a high frequency commuter type service). The concept I'm trying to get at is how many platforms in a terminus would be ideal to accommodate the service as...
  6. W

    Optimum number of platforms

    I'm just trying to work something out in my head... if a terminus station was receiving a pretty frequent service of electric multiple unit trains, say one arriving every 2-3 minutes, what would be the ideal number of platforms to accommodate such a service, without trains having to wait for a...
  7. W

    Use of non-English languages on the rail network

    I remember hearing automated announcements early one Sunday morning at East Croydon a few months back offering advice about Gatwick airport, I think in French and German (couldn't say what the announcements were, but 'Gatwick' is the same in all languages!). Must have been a test as they kept...
  8. W

    What next for LU? At full capacity...

    I think there should be thought given for diverting all freight and other through services away from London to free up other capacity, that is why I was glad they decided not to go ahead with the HS1-HS2 link in central London, the idea that you would drive a train along the congested rail...
  9. W

    Bridge Strikes

    Surely with modern satnav technology, some kind of alert system could be fitted inside double decker buses that gives an audible warning if the driver is approaching a low bridge? Could be fitted to HGV's too, I'm sure the insurance companies would love it Dragon's Den, here I come!
  10. W

    Very old rail

    It was actually stamped on the rail, I only noticed it because the sun was right above, shining down into the gap between the train and the platform
  11. W

    Very old rail

    At Newbury today I happened to notice that some of the rail in the bay platform is stamped 'GWR 1927' I'm sure there's older rail kicking around in old disused sidings and preserved railways and the like but this is a regularly used passenger track (admittedly very straight and low speed so...
  12. W

    Balloons near overhead wires

    Yesterday I was at a major station on the WCML and there was a a parent and child there towing a large foil balloon on a very long string (long enough for the balloon to be bouncing along on the ceiling as they walked). They were queueing for tickets so I assume they were on the point of going...
  13. W

    Geographically inaccurate NRE page

    It's also set up wrongly - click the link for 'Caledonian Sleeper' on that page and it goes to a list of railcards and rover tickets
  14. W

    New road bridge across railway

    There's a bridge similar to what you describe currently nearing completion on the line between Bognor Regis and Barnham stations in Sussex. If it is a publicly funded structure then I'm sure whichever local authority it falls under would probably have had to publish details of the cost...
  15. W

    Thameslink/ Class 700 Progress

    Am I the only one still terrified of the design of these trains? 12 coaches long with interconnecting carriages so no apparent fire doors or safe havens in the event of smoke, fire, whatever, in the tight Victorian tunnels under London where there is practically no way to detrain in an emergency...
  16. W

    East Croydon chaotic and dangerous

    Rebuilding platform 1 and 2 to increase the height, whilst a good idea due to the gap, seems wasteful when there are already plans in place to build a new platform, which would require the existing platform 1 and 2 to be realigned. But everything about the works at East Croydon seems unplanned...
  17. W

    Whats going to happen to the 24 hour suburban rail services when crossrail launches

    Thameslink at present doesn't run overnight on Saturday nights, also it seems to have fairly regular full weekend closures through the core section, trains often starting/finishing at Farringdon or Blackfriars
  18. W

    Skelmersdale Station

    There's a good typo in that report on page 2 of the introduction (page 8 of the pdf) "In addition, the study is required to assess the alternative of providing two trains per house to Manchester – a Rail North aspiration." two trains per house! That is a very frequent service :)
  19. W

    Discussion on electrification and the Marlow branch

    Seeing as we are talking about the Marlow branch, does anyone know if the original Crossrail plan of building a new platform at Maidenhead for the branch is going ahead? I know in the original plans it was necessary due to the number of proposed terminating services at Maidenhead, but that was...
  20. W

    Do Network Rail need to give notice of overnight track repairs

    I live next to the railway line from West Croydon to Sutton, and have done so for more than 15 years. I think in all that time I've received maybe 2 notices of work, and one of those didn't happen! However major works such as the redesign of tracks leading up to West Croydon all took place...

Top