• Our booking engine at tickets.railforums.co.uk (powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. S

    Guards on London Underground trains.

    Jubilee line went opo with 72mk2 and 83 stocks. The mk 2s were opo converted by then.
  2. S

    Class 159 Maintenance at Exeter

    Saw a SWR Class 159 running to Exeter St David’s TMD Monday this week about 11:45. Is this a usual thing? In quite a few days/hours spent at EXD I’ve never known SWR/SWT 159/158 to run to the Westerns depot. Certainly not since SWT stopped running to Plymouth & Penzance. It was being driven...
  3. S

    Jubilee Line Charing Cross Branch

    When I was a driver on the Jubilee line many many years ago stabling in CX sdgs was quite commonplace. The two sidings were very long and after stabling a train in there a key-switch was operated by the driver which prevented the platform you were walking out to from being used. Once you were...
  4. S

    Will the Waterloo & City line ever reopen? (Update: now open!)

    Expect to see all day operations recommence sometime before the end of 2021 possibly including Saturdays. The line will be needed when the Bank blockade starts next January. When it does restart all day it will only be with a 4 train service as one train is being refurbished as part of the...
  5. S

    Youtube links and Video sites

    The Stour Valley Line.
  6. S

    Will the Waterloo & City line ever reopen? (Update: now open!)

    There are currently a number of drivers “in training” which will boost the staff availability and allow the W&C to run longer hours. As things stand at present there are no plans to re-introduce a Saturday service (which wasn’t fantastically patronised anyway) but factors such as the Bank...
  7. S

    Will the Waterloo & City line ever reopen? (Update: now open!)

    No change to what currently being offered in terms of service. when it finally opens longer hours it will be Monday-Friday only. only 4 trains will be available due to the ongoing refurb project that sees one train being worked on at a time. There simply isn’t the footfall to justify returning...
  8. S

    Will the Waterloo & City line ever reopen? (Update: now open!)

    Old news I’m afraid. Decision has been taken to keep the existing peak hour only services in place until November.
  9. S

    Ashford-Minster

    Thanks again for the reply, Not sure why I had it in my mind that Minster box had closed-maybe I read something about "when" NR wants it to close by. I haven't heard anything about any plans to move the line into Ashford (or Gillingham) IECC so I guess the current arrangements will continue...
  10. S

    Ashford-Minster

    Thanks all for the replies. I did find the 2017 FARSAP video but wondered if anything had changed since then. The Canterbury Wye area “hut” is still in situ near the main box and I believe still interfaces with a couple of local crossings. The Signalbox at Minster seems to be closed so who is...
  11. S

    Ashford-Minster

    Afternoon all, I'm doing some research into the Ashford-Minster section of the former SR and have a few queries. There's plenty of historical material around about the line already out there but what I want to know is what is the current situation regarding the signalling on the line. Ashford...
  12. S

    Will the Waterloo & City line ever reopen? (Update: now open!)

    Soft re-opening for this evenings peak time service ahead of Official re-opening on Monday next week. Dust issues sorted at least for the time being. Todays damp weather has helped with the humidity down there, higher humidity = less dust.
  13. S

    Will the Waterloo & City line ever reopen? (Update: now open!)

    The dust is circulated and blown about by moving trains. Something that have been in short supply since last March!
  14. S

    Will the Waterloo & City line ever reopen? (Update: now open!)

    Trial ops cancelled this afternoon due to build up of dust in tunnels. Tunnels being cleaned today for possible restart of trial ops tomorrow.
  15. S

    Will the Waterloo & City line ever reopen? (Update: now open!)

    Empty trains to “shakedown” the infrastructure and rolling stock start next Tuesday. If all goes well and it is an “if” expect a peak hours only service to be introduced within days.
  16. S

    Crossrail opening delayed (opening date not yet known)

    They'd better get a move on or the person it's named after might not be around to open it!
  17. S

    Remaining GWR HST Diagrams

    Perhaps this should become a disposal thread. We’ve charted the run down to withdrawal now we list disposal (or reuse) dates etc.
  18. S

    Remaining GWR HST Diagrams

    Looks like the last GWR full length HST to & from Paignton tomorrow. 1A15 09:18 off Paignton.
  19. S

    Railcam Diagrams

    Thanks for the information. That’s very interesting and useful too. Rick

Top