    MML Electrification: progress updates

    Perhaps that would explain why there was orange earthing clamps on the slow line at Wymington this morning.
  2. W

    MML Electrification: progress updates

    According to this Network Rail press release, the fourth line and platform 4 at Wellingborough are now in use. Press Release
  3. W

    MML Electrification: progress updates

    I have just posted a video of a Class 360 being moved from Cricklewood to Kettering over on the EMR 360 thread. A couple of pictures of it here too.
  4. W

    EMR Class 360's

    Quick video here showing the Class 360 running on the slow lines through Wymington, Bedfordshire. Looks like the middle train's pantograph was not raised.
  5. W

    EMR Class 360's

    12 coach class 360 running under electric traction, no diesel locos. Will post pic and video soon.
  6. W

    MML Electrification: progress updates

    Press release from Network Rail about completion of new railway sidings in Kettering. First trains to arrive and driver training expected to start later this month.
  7. W

    MML Electrification: progress updates

    Hopes rekindled of full Midland Main Line electrification... according to Rail Magazine.
  8. W

    MML Electrification: progress updates

    I noticed this morning that one of the isolator towers on the slow line at Wymington appears to be open. Presumably that would suggest the line isn't powered up.
  9. W

    MML Electrification: progress updates

    Had a wander up to the Irchester substation (in Wymington, North Bedfordshire) and noticed two of the isolators are now connected which presumably confirms the power is running up to Irchester as previously mentioned by others. The ground is too wet for me to wander to the isolators on the...
  10. W

    Stevenage platform 5

    Platform 5 has made the local press https://www.thecomet.net/news/east-coast-mainline-upgrade-new-platform-stevenage-1-6774596
  11. W

    MML Electrification: progress updates

    Thanks for sharing. The Twitter link confirms it has been energised to Irchester.
  12. W

    MML Electrification: progress updates

    There was a notification of the power being switched on at the Irchester TSC (which is located in Wymington) when I went past it the others day. Sadly I could not make out the details from the picture I took (attached).
  13. W

    Trivia: Journeys between stations that are quicker to walk

    Hertford North to Hertford East whilst isn't a short walk, is quite a journey by train.
  14. W

    MML Electrification: progress updates

    Announcement from NR about weekend closures. Looks like there's a photo of the Kettering sidings too.
  15. W

    MML Electrification: progress updates

    The fourth line between Wellingborough and Sharnbrook junction is no longer showing as out of use on Open Train Times. Will keep an eye out for any use of it.
  16. W

    MML Electrification: progress updates

    This is the most recent photo I have of the substation at Wymington (October 2019).
  17. W

    MML Electrification: progress updates

    If you mean the extra line between Kettering and Sharnbrook junction, no it is not. Was supposed to be used next Monday by this service but it has been changed today from using platform 4 at Wellingborough to now using platform 3.
  18. W

    MML Electrification: progress updates

    Firstly thank you to @59CosG95 for your excellent summaries and knowledge on the forum. So I had a wander today along the new path between Wymington Meadow and Sharnbrook Summit. It would seem Network Rail have had enough of walkers breaking the fencing that used to block the connection and...
  19. W

    MML Electrification: progress updates

    Had a quick look at the lines near Wymington this evening. The over heads have these blue wires attached to them which I assume mean the power is not live. Separately I saw this strange structure on the fast line where the wires from each line go to some sort of isolation lever. Any ideas what...
  20. W

    MML Electrification: progress updates

    Oooh, shame it is so late otherwise I'd go and have a look. Will the line be powered up for the test?