Prior to the Kent Coast Electrification (1959) they were operated by 2HALs and then 2 HAPs. After Strood only called at Gravesend, Dartford, Woolwich Arsenal, London Bridge, Waterloo East and Charing Cross. Rochester to Charing Cross was 60 minutes. Picked up and dropped of a Maidstone West...