• Our booking engine at tickets.railforums.co.uk (powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. BS56

    Signal upgrade set to modernise Cornwall’s railway

    Any idea what days and times empty clay trains would make this move.
  2. BS56

    Signal upgrade set to modernise Cornwall’s railway

    Surely a position light shunt signal would suffice for that task.
  3. BS56

    Signal upgrade set to modernise Cornwall’s railway

    Just noticed two signals on signal maps for which their purpose needs to be explained. The first is at St Austall and numbered CL5855 and is on the up side of the line but is intended for down trains and has no other signal in rear of it. The second is CL5790 near black queen tunnel and is on...
  4. BS56

    Hertford East Branch Platform Extension Updates

    Do not forget there was a centre run round loop at Hertford at one time so the kink is needed to maintain the six foot at the London end .
  5. BS56

    Hertford East Branch Platform Extension Updates

    They could have removed the kink in Ware platform but they chose not to.
  6. BS56

    Hertford East Branch Platform Extension Updates

    The platform surface is some form of concrete slab about the same size as the polystyrene blocks each one is craned into place I saw this being done at Hertford earlier this week they come prepainted with white edges as well.
  7. BS56

    Hertford East Branch Platform Extension Updates

    Visited both sites today. At Hertford all new track and pointwork is in place as is most of the ballast. The up platform (2 ) is nearly complete .A small section of the down platform ( 1 ) has been started see photo can anybody tell me what the various parts of the platforms are made of ...
  8. BS56

    Hertford East Branch Platform Extension Updates

    During August work will get underway on replacing the road over bridge at Broxbourne station. But only two spans are being renewed so I understand the third over the mill stream is to stay for now . As this is just as old as the others it will need to be renewed in the near future . Perhaps...
  9. BS56

    Trivia: Shortest-lived name a station has had

    I seem to remember that Harlow town was called Burnt mill to start with but after a few weeks or less it was correctly given it's new name.
  10. BS56

    Hertford East Branch Platform Extension Updates

    Lots going on at Hertford East this week line closed until next Tuesday so they must be renewing track I will try and get down there and take some photo's.
  11. BS56

    Ponders End loop

    There is already a disused up loop between Enfield Lock and Brimsdown could any use be made of that ?
  12. BS56

    Hertford East Branch Platform Extension Updates

    They have got to renew the track and relocate the trailing crossover first before they start work on the platforms at Hertford East I was told this Easter has anyone heard anything ?
  13. BS56

    Frinton on sea platform 2

    I have seen a signalling plan for 1950 which shows that the down loop and signal box could be switched out and down trains using the up platform if need be thus the signal box could change to a gate cabin ie non block post. As the line was already at that time worked by acceptance switches ( no...
  14. BS56

    Andover - Ludgershall branch

    While we are talking about this branch line is the up fixed distant semaphore signal still there approaching red post junction ?
  15. BS56

    Why do Network Rail still use some imperial measurements?

    There is another measurement nobody has mentioned that is the decimal imperial. Britain started to look into this some time back when everybody else was converting to metric. I have a metre long steel rule with all three measurements shown on it. If you have never heard of this well I can tell...
  16. BS56

    Hertford East blockade in October

    Work started yesterday . I went there today and work is well under way. I got talking to the workmen It seems I was wrong about the way it will be dismantled in fact there will be no cranes because it will be dismantled bit by bit each part will be colour coded and numbered including the lever...
  17. BS56

    Hertford East blockade in October

    It will be interesting to see how they do this . Access to the site is a bit restricted there are trees and undergrowth behind the box that my need to be cleared first so that a lorry mounted crane can get near enough to lift the lever frame out along with the heavy timbers on to a flat back...
  18. BS56

    Angerstein branch line foot crossing in Charlton to close - now to stay open!

    I must go visit this crossing next time I am that area.
  19. BS56

    The Railway children. How many versions are there ?

    Yes you are right. So there might be only three BBC versions. Not sure but there might also be a Australian film version as well . Also I have found the one you just mentioned on Ebay new for less then a fiver !
  20. BS56

    The Railway children. How many versions are there ?

    It seems the first one is now lost for good including the remake a short while later. As for the second version made in 1957 it fails to mention if it survives in the BBC archives it would be nice if it did although I doubt it a lot of black and white stuff was trashed in the late sixties and...

Top