• Our booking engine at tickets.railforums.co.uk (powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. T

    Right to Left hand controls

    Bit of a unusual question but wonder if someone can help my curiosity. A lot of older units and locos have their power controller on the right hand side of the desk and the brake handles on the left and thus would normally be controlled with respective hands. With the move to combined...
  2. T

    Loco-hauled for Crosscountry?

    Can't remember where it was but I think it was found that a DMU over 5/6 carriages becomes extremely inefficient in both track access charges and fuel consumption. Not a huge penalty for some peak hour combinations and empty coaching stock moves but running all day up and down the country is a...
  3. T

    Class 345 progress

    It's mainly for platform restrictions at Paddington. Outer curved platforms (8,10,12) are not cleared for Class 345 passenger use without SDO in operation. It helps with the ARS software to know not to route a "9" into certain platforms.
  4. T

    Operational Planning Specialist for Network Rail

    It's basically as you mention a more senior position compared to the Operational Planner (or Train Planner as it should be but I digress...) Whilst never one myself it is (or certainly was ) a "planning" team leader/lead point of contact for the appropriate team. They usually represent the teams...
  5. T

    Fantasy: Given no limits, how would you modernise your line?

    Who doesn't love a bit of dreaming.... So London - Aylesbury and others concerned... - Electrified throughout - Met line cut back to Rickmansworth, new 4 track station built next to the car park and Waitrose - New link from Paddington/Old Oak to become the Chiltern branch of Crossrail - All...
  6. T

    Class 315 Withdrawals

    Yes, I believe they are driven by Tfl drivers and route conducted by GBRF.
  7. T

    TFL Rail Weekend Works

    Full line closures should be coming to an end soon. Bar one at August Bank Holiday weekend. Next significant tfl rail closures will be several weekends of no running Liverpool Street - Stratford on Saturdays due to Pudding Mill (Eastern Portal) works. GA should be unaffected and Sundays...
  8. T

    Is this modelled on a real shunter?

    Ah yes, the Aldwych with 3 different ticket entrances, escalators and 4 platforms, live running lines and an abandoned sleet loco lookalike... Pedantics aside they recreated the atmosphere of the tube brilliantly on that level, everything from switch rooms, store rooms, the looks...
  9. T

    Cardiff City Deal Releases £734m for South Wales Metro

    Hopefully that's a sign that Hirwaun station will finally be re-opened.
  10. T

    Pair of 90s on the ECML?

    There were discussions about it in several cases a few years back when planning these. Certainly using 90's and 92's on HOBC/MOBC/Tracklayer was discussed when on Northern ECML and Southern WCML (how serious though I'm not sure). Engineering trains probably have had the single most variety...
  11. T

    Network Rail: Operational Planner

    Those of us that stayed (I was lucky enough to be living between London and MK) were up against it to put it mildly, some of us coming from haulage/test train/OTM backgrounds switching (being forced) to passenger with that around the corner wasn't very helpful. Introducing a new system while a...
  12. T

    APT 30 years on article: You'd think the BBC would get it right?

    Slightly OT but that traction package was meant to go under a Class 180 esque body as Alstom's bid for the IEP project wasn't it?
  13. T

    East Anglia Franchise ITT published: Norwich in 90*

    Got it in one ;) and that's just part of the east side of the project... Shame about Chadwell Heath to Goodmayes being dropped, could be very useful in the future so hopefully it doesn't get built over etc.
  14. T

    East Anglia Franchise ITT published: Norwich in 90*

    Not heard anything about Chadwell Heath but would be useful come Ilford and Gidea "blockades" as well as Shenfield. The space and overgrown infrastructure still exists so could also provide a useful freight loop and extra platform through the station. If it's merged into the Crossrail budget...
  15. T

    Lord Adonis to return to Rail & Infrastructure with new Goverment Body.

    Erm that requires EVERY train into the aforementioned stations to be exactly the same spec, every platform to be capable of holding 12 coaches, the running lines approaching the station to be the same speed, the station throat to have access to every platform and every platform to be on short...
  16. T

    Creation of class 230 DEMUs from ex-LU D78s by Vivarail

    And we'll have a forum thread in years asking if the 230's saved branches from closure... :twisted:
  17. T

    Is Crossrail too fast?

    Would still love that to happen from a personal point of view! Just wish it'd gone ahead as per the 90's proposal... I can think of a good number of sensible reasons why it'd be useful as well. Not enough to justify it though... Sadly I think the costs and logistics of rebuilding...
  18. T

    Why so long to develop East - West Rail?

    Oh certainly, just thinking of the possible prospects for projects like this while we're on the subject of time taken... :wink:
  19. T

    Why so long to develop East - West Rail?

    18. contractor discovers issues, blames NR 19. NR unable to meet promised timescales, blames contractor 20. public get wind of issues, blames dft 21. Government pauses project on "spending review" 22. contractor replaced, NR/dft issue statement saying everything's back on track 23...
  20. T

    Aldersbrook carriage sidings

    They're coming back into use for Class 315's an interim period at least. Re-modelling work at Ilford, Gidea Park Carriage Sidings and Shenfield will require trains that are normally stabled at those locations to be re-located. The works are to bring them back up to spec and fit driver...

Top