Thanks! Is there any information on when the first completed unit is expected back?
The first two AC traction package units were due back from Derby in February.
Another unit is having handrails recoated, wheelchair spaces, LED lighting, new passenger information displays fitted and another unit has the data transmission cables replaced at Acton.
All of these modifications are to be fitted to the rest of the fleet at a new workshop being constructed in Acton Works; which should be completed this summer.
The Waterloo & City trains are to have the same wheelchair spaces, passenger information displays and handrails recoated; one at a time, possibly at Waterloo depot when the Line resumes service from June.