313121 made its first run onto thameslink metals today with a test run from Willesden to London Blackfriars and back.

http://www.realtimetrains.co.uk/train/O10803/2015/07/13/advanced

This is the first of many planned, so keep your eyes peeled.
https://mobile.twitter.com/lambrettaRT255/status/620550059600543744 picture from twitter.
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
29,178
Prelim run. Not going through the core just yet.

It is testing the ETCS kit (not ATO), all the balises are in and the Radio Block Centre is up and ready to run.
 

Yabbadabba

Member
Joined
23 May 2014
Messages
385
ATO testing needs the 700s. But then they are not very far away...

Departing on 21st and arriving on the 29th as long as GTR accepts the depot from the contractors by then. All signalling complete and commissioned as of 04:00Hrs 13/07/15 (although no ones got a clue how to work it yet but that's another story).
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
28,050
Location
UK
Surely the new signalling system just needs to be plugged in and switched on, once some silly sod removes his iPhone charger that he thinks he has a human right to use?!
 

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
Prelim run. Not going through the core just yet.

It is testing the ETCS kit (not ATO), all the balises are in and the Radio Block Centre is up and ready to run.

Booked to run in the Core this morning with bi di working.

Departing on 21st and arriving on the 29th as long as GTR accepts the depot from the contractors by then. All signalling complete and commissioned as of 04:00Hrs 13/07/15 (although no ones got a clue how to work it yet but that's another story).

Indeed. Tho dates are in stone just yet.
 