kennythelad

Member
Joined
25 Apr 2011
Messages
157
Does anyone have any info on the status of Azuma 801228, please?.
I check daily and it doesn’t appear to have worked a train for a couple of months at least. I saw a picture of it in a magazine with various wires and cables on it, re. ongoing tests on the recent issues.
I was thinking is it on static testing at Doncaster?.
Any info welcomed,
Thanks.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

800001

Established Member
Joined
24 Oct 2015
Messages
3,558
Does anyone have any info on the status of Azuma 801228, please?.
I check daily and it doesn’t appear to have worked a train for a couple of months at least. I saw a picture of it in a magazine with various wires and cables on it, re. ongoing tests on the recent issues.
I was thinking is it on static testing at Doncaster?.
Any info welcomed,
Thanks.
It has been out most days the last several weeks, however it is operating as a test train for Hitachi, crewed by GBRF, and has not operated a passenger service for many weeks.
It is fitted with sensors to measure pressure and forces being applied to the train across the East Coast Route.
If you see any 5Q paths orginating from Doncaster IEP depot to Prestonpans loop, or to Kings Cross, then a good bet is for it to be 801228.
 

kennythelad

Member
Joined
25 Apr 2011
Messages
157
It has been out most days the last several weeks, however it is operating as a test train for Hitachi, crewed by GBRF, and has not operated a passenger service for many weeks.
It is fitted with sensors to measure pressure and forces being applied to the train across the East Coast Route.
If you see any 5Q paths orginating from Doncaster IEP depot to Prestonpans loop, or to Kings Cross, then a good bet is for it to be 801228.
Thanks for the info and quick reply, 800001. Much appreciated.
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
7,554
Location
London
It has been out most days the last several weeks, however it is operating as a test train for Hitachi, crewed by GBRF, and has not operated a passenger service for many weeks.
It is fitted with sensors to measure pressure and forces being applied to the train across the East Coast Route.
If you see any 5Q paths orginating from Doncaster IEP depot to Prestonpans loop, or to Kings Cross, then a good bet is for it to be 801228.

I assume this for the 80x cracking issues to test the infrastructure?
 

800001

Established Member
Joined
24 Oct 2015
Messages
3,558
801228 is currently having its monitoring equipment removed at Doncaster and will them be prepared for service with LNER. Eta for release to traffic is 27/09/21.

That will leave 801203 (level crossing crash), and 801205 (stored at Tyne Yard with cracks) as the only 2 units with lner not in traffic.
 

Wyrleybart

Established Member
Joined
29 Mar 2020
Messages
1,640
Location
South Staffordshire
801228 is currently having its monitoring equipment removed at Doncaster and will them be prepared for service with LNER. Eta for release to traffic is 27/09/21.

That will leave 801203 (level crossing crash), and 801205 (stored at Tyne Yard with cracks) as the only 2 units with lner not in traffic.
Thanks for that news.
Clearly the cracking is not so much an issue on the LNER fleet then.
 

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
27,646
Location
Redcar
Clearly the cracking is not so much an issue on the LNER fleet then.
Well it is a lower mileage to be fair. GWRs first sets entered service in October 2017 whilst they didn't finally enter service with VTEC until May 2019. That's a lot of extra miles the GWR fleet will have covered compared to the LNER fleet!
 

kennythelad

Member
Joined
25 Apr 2011
Messages
157
801228 is currently having its monitoring equipment removed at Doncaster and will them be prepared for service with LNER. Eta for release to traffic is 27/09/21.

That will leave 801203 (level crossing crash), and 801205 (stored at Tyne Yard with cracks) as the only 2 units with lner not in traffic.
Thanks for that update, 800001. Much appreciated.
 

Dave91131

Member
Joined
13 Jun 2018
Messages
671
Just a quick note to probably finish off this thread - 801205 and 801228 now both in normal passenger service with LNER, I've travelled on both of them within the last week.
 

DanNCL

Established Member
Joined
17 Jul 2017
Messages
4,267
Location
County Durham
Just a quick note to probably finish off this thread - 801205 and 801228 now both in normal passenger service with LNER, I've travelled on both of them within the last week.
801228 has been back for a few weeks now. 801205 is a more recent returnee, having now received the same temporary welds as seen on some of the GWR 80xs.
 