I presume they are testing the mechanical interface between the pantograph and overhead line without drawing any current. This allows the separation of mechanical and electrical compatibility tests, giving more flexibility in testing as they don’t need to worry about electromagnetic interference to the signalling.I notice during some of those testing videos that both the pantograph is up and the engines are operating. I wonder what the significance of that is?