joy54.gen
Member
- Joined
- 6 Jun 2005
- Messages
- 613
Over the weekends of February 11th/12th and 18th/19th next year
engineering works will take place betwen Bridge of Orchy and Tulloch
so the Beds 1Y11 get diverted into Oban vice the Fort on the
Saturday morning of each weekend and stable for the weekend with
1B01 departing Oban on the Sunday night. Im led to believe though
that there is only one Oban driver who signs 37s now and he is
currently off long term sick.
I have been wanting to do Oban loco-hauled for ages and ages, but have always been unlucky usually by missing the railtour. Anyway as both these weekends are at the start and end of the School Half Term, I can feel a meet coming on.
engineering works will take place betwen Bridge of Orchy and Tulloch
so the Beds 1Y11 get diverted into Oban vice the Fort on the
Saturday morning of each weekend and stable for the weekend with
1B01 departing Oban on the Sunday night. Im led to believe though
that there is only one Oban driver who signs 37s now and he is
currently off long term sick.
I have been wanting to do Oban loco-hauled for ages and ages, but have always been unlucky usually by missing the railtour. Anyway as both these weekends are at the start and end of the School Half Term, I can feel a meet coming on.