Anyone know whats on this?

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

richieb1971

Established Member
Joined
28 Jan 2013
Messages
1,935
Whenever I've seen a 715 tonne train on RTT its usually a track machine.

Its a strange working to say the least. There are no sidings at Lidlington so likely a track machine.
 

Deltic1

Member
Joined
23 Feb 2012
Messages
144
Thanks, thought it might be a track machine but the trailing load made me think otherwise!
 

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
29,182
Location
Fenny Stratford

TheEdge

Established Member
Joined
29 Nov 2012
Messages
4,489
Location
Norwich
yes - that is just the timing load for the timetabling system

I see these and wonder why? Can the timetabling system not understand it being timed as a simple OTM or does 715 tonnes have some significance?
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
15,838
It is because it is the timing load with the most populated SRTs, nothing more nothing less. There are specific OTM timing loads but I dont know if these feed down to RealtimeTrains in the same way. Some timing loads dont such as Chiltern 168s showing as 158s.
 

Tom

Member
Joined
19 Jan 2008
Messages
550
Location
35,000ft
There are specific OTM timing loads but I dont know if these feed down to RealtimeTrains in the same way.

In the CIF there is literally only a power type and timing load field. The speed is also derived from these. There is a translation mapping between the ITPS versions of these and the CIF version, but for quite a few they are so numerous that it's not worth even trying to decode it. (A future version of RTT does have a decode table for some.)
 