Geezertronic
Established Member
Clearly the correct thing to have done was disembark the passenger at Rugby for onward travel via rail or road.
In this instance, maybe as the passengers destination was originally Euston but the service was terminated at MKC due to the lineside issues, that decision to terminate may not have been made in time for either the service to stop at Rugby, or if it did stop at Rugby then the lineside issues were not as advanced to make a determination that a termination at MKC was required