Thanks to Wrinkley for spotting Bullfield tunnel stalactites. Here's the worry list updated accordingly:
1. Missing bases Salford Crescent Platform 2
2. Missing bases Pendleton Old to Cockrobin Bridge
3. Missing bases North of Agecroft Road bridge
4. Structure to be installed between Agecroft Road bridge and Clifton station? Work has started on this next to Bridge MVE1/16 off Lumns Lane.
5. Power lines oversailing between M60 and Kearsley?
6. Foot crossings either side of M60 Work has started on diverting the footpaths to meet at a new footbridge on which work has also started, steelwork expected to be lowered on by rail crane April 2018.
7. Sorted
8. Missing bases Farnworth station to Squeeze Belly Entry footbridge
9. Lever Street footbridge, demolish, replace, leave as is? New electric wires warning signs suggest the bridge is expected to survive past electrification.
10. Missing base Bolton Platform 5
11. Stalactites in Bullfield Tunnel? Reported as visible at both ends, can anyone confirm the middle?
12. Missing base(s) between Bullfield Tunnel and Newport Street, Bolton?
13. Big electric kit at Lostock Junction Latest intelligence says work will get cracking in March 2018
14. Incomplete footbridge Anderton Hall Lane Bridge complete but not signed off by NR, therefore not yet open.
15. Red Moss foot crossing between Horwich and M61 Work has started on a replacement footbridge
16. Missing bases on Yarrow viaduct south of Chorley? Work has started on fixings ("bases") on the outside of the structure
17. Stalactites in Chorley Tunnel?
18. Major problem base south of Lever Street footbridge?