I travelled from Kearsley to Vic today. It is worrying that there is still no sign of National Grid preparing to raise or bury any of the transmission lines that hang low over the railway. Does anyone know how long this work is likely to take once they get started?

I guess the pile driver cannot safely work under the live HV wires.
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
7,879
Location
Dalton GA USA & Preston Lancs
Well I did the run from the airport to Preston station and then got a taxi home so I also went down Tom Benson Way with the camera at ready. I have sent about 8 shots to Dave. Long story short there are not just masts on TB Way but they mainly have cantilevers too. Definite progress. Massive progress MAN to PRE. Huge amount of new track sleepers etc at Bolton and orangemen everywhere. Many many new bases and piles since my last trip July 1st. They really are cracking on. Many masts have cantilevers and some large insulators at the top so definitely auto transformer. To me the eye opener was Euxton - there is wire up. It is loosely pinned to the gantries but I would say half a mile of wire. I also noticed on the WCML a new base and mast presumably where they tie the two schemes together on the crossover. Great news
 

1978NWUK

Member
Joined
13 Dec 2011
Messages
37
Well I did the run from the airport to Preston station and then got a taxi home so I also went down Tom Benson Way with the camera at ready. I have sent about 8 shots to Dave. Long story short there are not just masts on TB Way but they mainly have cantilevers too. Definite progress. Massive progress MAN to PRE. Huge amount of new track sleepers etc at Bolton and orangemen everywhere. Many many new bases and piles since my last trip July 1st. They really are cracking on. Many masts have cantilevers and some large insulators at the top so definitely auto transformer. To me the eye opener was Euxton - there is wire up. It is loosely pinned to the gantries but I would say half a mile of wire. I also noticed on the WCML a new base and mast presumably where they tie the two schemes together on the crossover. Great news

Correct, and progress indeed!
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
7,879
Location
Dalton GA USA & Preston Lancs
So could not resist and managed to get away for 1 hour. There are masts with cantilevers on Tom Benson Way. There are masts with some cantilevered at Darkinson Lane. The real news is all and I mean all the piles/bases are in place at Salwick station . Great progress. I have sent photos to Dave so after his family weekend you may see them as soon as Monday.
 

Jamesrob637

Established Member
Joined
12 Aug 2016
Messages
5,236
Well I did the run from the airport to Preston station and then got a taxi home so I also went down Tom Benson Way with the camera at ready. I have sent about 8 shots to Dave. Long story short there are not just masts on TB Way but they mainly have cantilevers too. Definite progress. Massive progress MAN to PRE. Huge amount of new track sleepers etc at Bolton and orangemen everywhere. Many many new bases and piles since my last trip July 1st. They really are cracking on. Many masts have cantilevers and some large insulators at the top so definitely auto transformer. To me the eye opener was Euxton - there is wire up. It is loosely pinned to the gantries but I would say half a mile of wire. I also noticed on the WCML a new base and mast presumably where they tie the two schemes together on the crossover. Great news

Great news indeed. Dec '17 may still be on at that rate :) I'll probably take a trip along the line the Tuesday or Wednesday after the Bank Holiday weekend when it'll be reopen just before my GM Traincard expires
 

LDECRexile

Established Member
Joined
30 Jan 2014
Messages
2,149
Location
Southport, UK

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,215
RE: Bolton August blockade.

Is the whole new layout commissioned by the end of the blockade? I'm booked to pass through on 30th August and hoping to give the new Platform 5 a test ride...

(Have searched the thread for an answer to the above, but can't find it...)
 

thealexweb

Member
Joined
5 Jan 2014
Messages
957
Does anyone know why the new footbridge only crosses the track of Platform 5? Are there any plans for it to go over to Platforms 1-3?
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
24,905
Location
Nottingham
Does anyone know why the new footbridge only crosses the track of Platform 5? Are there any plans for it to go over to Platforms 1-3?

This was discussed way back, probably on this thread somewhere. With Platform 5 being new it has to be risk-assessed and the conclusion must have been that it needed an emergency exit. Platforms 1-3, despite probably being busier, are still in their previous condition so benefit from "grandfather rights". I think it follows that the new footbridge won't be useable except in emergency.
 

Joseph_Locke

Established Member
Joined
14 Apr 2012
Messages
1,878
Location
Within earshot of trains passing the one and half
This was discussed way back, probably on this thread somewhere. With Platform 5 being new it has to be risk-assessed and the conclusion must have been that it needed an emergency exit. Platforms 1-3, despite probably being busier, are still in their previous condition so benefit from "grandfather rights". I think it follows that the new footbridge won't be useable except in emergency.

Cunningly, it is all positioned so that it can extended over to P1/2/3 later, should the need arise, but you answer is correct in all other respects.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
24,905
Location
Nottingham
Cunningly, it is all positioned so that it can extended over to P1/2/3 later, should the need arise, but you answer is correct in all other respects.

I seem to remember you were either uncertain or deliberately cagey on that point when it was discussed before, but I'm glad to hear that provision has been made for extension if needed.
 

driver9000

Established Member
Joined
13 Jan 2008
Messages
4,246
RE: Bolton August blockade.

Is the whole new layout commissioned by the end of the blockade? I'm booked to pass through on 30th August and hoping to give the new Platform 5 a test ride...

(Have searched the thread for an answer to the above, but can't find it...)

From the briefing we have been given on the new layout it all opens on 27 August. Whether anything will be using 5 with any degree of certainty remains to be be seen.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
7,729
Location
Leeds
The fourth platform at Manchester Airport remained unused for many months after it was apparently finished.
 

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,215
From the briefing we have been given on the new layout it all opens on 27 August. Whether anything will be using 5 with any degree of certainty remains to be be seen.

Thanks - I'll refrain from raising hopes too highly!
 

LDECRexile

Established Member
Joined
30 Jan 2014
Messages
2,149
Location
Southport, UK
Reg has kindly sent four more shots from yesterday's excitement at Bolton.

I've woven them in as 7880n, 7876z2, 7874z and 7874y2.

I'm now on with today's material.

Thank you Reg
 

LDECRexile

Established Member
Joined
30 Jan 2014
Messages
2,149
Location
Southport, UK

snowball

Established Member
Joined
4 Mar 2013
Messages
7,729
Location
Leeds
Surprised to see the apparent use of headspans in 7912i-k. I thought they were out of favour except for special locations such as Rainhill. And on mere double track too, where it's not obvious why pairs of single track cantilevers couldn't have been used.
 