Bletchleyite
Veteran Member
I've noticed a couple of things of note at Bletchley of late.
One is that the section of the footbridge with the steps down to the entrance/exit looks much newer concrete than the rest of it. Has that bit been added more recently, perhaps with the original having steps down like the other platforms?
The other is that when P4/5 were extended the OHLE which formerly supplied the line from the sidings to P4 is still present, and so there's live OHLE directly above the platform. I've never seen this elsewhere and was a bit surprised by it - surely this poses a greater risk of someone coming too close and so it should be removed?
One is that the section of the footbridge with the steps down to the entrance/exit looks much newer concrete than the rest of it. Has that bit been added more recently, perhaps with the original having steps down like the other platforms?
The other is that when P4/5 were extended the OHLE which formerly supplied the line from the sidings to P4 is still present, and so there's live OHLE directly above the platform. I've never seen this elsewhere and was a bit surprised by it - surely this poses a greater risk of someone coming too close and so it should be removed?