Revised date for tracklaying. Put back from late June to October possibly due to availability of Dutch tracklaying machine.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

fgwrich

Established Member
Joined
15 Apr 2009
Messages
9,250
Location
Between Edinburgh and Exeter
Revised date for tracklaying. Put back from late June to October possibly due to availability of Dutch tracklaying machine.

Sounds like BAM are doing things their way then - the A-B was done pretty quickly with Balfours doing the contract and utilising their Harsco NTC Machine (New Track Construction)! Pity they're not making use of the NTC this time around then!
 

92002

Member
Joined
27 Mar 2014
Messages
1,124
Location
Clydebank
Sounds like BAM are doing things their way then - the A-B was done pretty quickly with Balfours doing the contract and utilising their Harsco NTC Machine (New Track Construction)! Pity they're not making use of the NTC this time around then!

So why would they hire in a machine from the opposition when they own a perfectly good one themselves.
 

fgwrich

Established Member
Joined
15 Apr 2009
Messages
9,250
Location
Between Edinburgh and Exeter
So why would they hire in a machine from the opposition when they own a perfectly good one themselves.

Because Balfours is possibly ready to use and may not require a waiting time of October until their own piece of kit arrives, is set up and possibly requiring crews to be trained up on it unless they bring their own across (which is fairly common these days within construction!)?
 

92002

Member
Joined
27 Mar 2014
Messages
1,124
Location
Clydebank
Because Balfours is possibly ready to use and may not require a waiting time of October until their own piece of kit arrives, is set up and possibly requiring crews to be trained up on it unless they bring their own across (which is fairly common these days within construction!)?

That doesn't sound like a good commercial reason to hire in the opposition to me. So long as they complete the contract to time and costs everyone will be happy.

I know of many other capable contractors who could complete the job now, but that may not be a commercially sensible idea or within the BAM budget.
 

fegguk

Member
Joined
11 Sep 2012
Messages
173
Location
Hawick
It says on there web site that the structures on the line will be completed to enable track laying in October. Judging by progress at various sites this looks realistic. I don't suppose they could start lay track before then. If it is safe to assume that they will want to start at Newcraighall and keep going until the reach Tweedbank then everything needs be ready near enough at once.

The time from when they started laying track on the Airdrie-Bathgate to completion of the line was about 9 months which is a similar timescale to this project. Although the Borders line is about twice as long most of it is single track compared to the double track A-B.
 

DunsBus

Established Member
Joined
12 Jan 2013
Messages
1,404
Location
Duns
Had a look at Heriot today, work is now under way to turn the former B709 through the village into a cul-de-sac. A tunnel is being dug under the railway and this will form the pedestrian link between Heriot and the A7. The junction of the B709, the C11 and what is now the access road into Heriot is in the process of being tied-in. Signposts are starting to go up and trunking for street lighting is being laid - it looks as if the A7 junction and the B709 as far as the C11 and former B709 will be lit.

Stone surfacing is also starting to appear on the trackbed.
 

deltic08

On Moderation
Joined
26 Aug 2013
Messages
2,499
Location
Ripon
Had a look at Heriot today, work is now under way to turn the former B709 through the village into a cul-de-sac. A tunnel is being dug under the railway and this will form the pedestrian link between Heriot and the A7. The junction of the B709, the C11 and what is now the access road into Heriot is in the process of being tied-in. Signposts are starting to go up and trunking for street lighting is being laid - it looks as if the A7 junction and the B709 as far as the C11 and former B709 will be lit.

Stone surfacing is also starting to appear on the trackbed.

I looked at Shawfair today. Trackbed here appears to be concrete with ballast size aggregate. Still much to do near the Cockatoo restaurant with the closed A6106 road needing digging out.

Packs of sleepers positioned along the route. I was told they would be recycled sleepers but the ones being unloaded today are brand new.
 

PaxVobiscum

Established Member
Joined
4 Feb 2012
Messages
2,395
Location
Glasgow
Latest episode of Borders Railway - From Start To Finish now online. Some interesting bits - though it is targeted at a fairly wide audience.

We hear more from the Scotland First Minister Alex Salmond,
(EDIT: That's not one of them!)
authors David Spaven and Dennis Lovett, we look at the work done on the iconic Hardengreen Bridge which is almost complete and we drop in at Langlee School in Galashiels to find out what the kids are learning about health and safety on the Railway. Stuart MacKay from BAM tells us all about ballast, sleepers and drains.
 
Last edited:

PaxVobiscum

Established Member
Joined
4 Feb 2012
Messages
2,395
Location
Glasgow
Link doesn't work properly for me. Did he say where? Hard to think of any worthwhile populations missed.
That link works fine for me, as with the one I posted.
He has said this before without indicating where the (stations) would be. Let's hope it's Melrose and Hawick he has in mind.
 
Last edited:

fegguk

Member
Joined
11 Sep 2012
Messages
173
Location
Hawick
That link works fine for me, as with the one I posted.
He has said this before without indicating where the (stations) would be. Let's hope it's Melrose and Hawick he has in mind.

More likely Portobello and Abbeyhill Capital Rail Action Group (CRAG) have been campaigning for these. Reopening the junction to Abbeyhill from Waverley has been proposed as part of EGIP as a siding for terminating trains. So why not build a station there and link it to the south via Peirshill. Though I don't think these would enhance services to the Borders slowing them further.

Heriot and Fountain I imagine would be non starters.

http://www.edinburghnews.scotsman.c...-re-open-portobello-railway-station-1-3448630
 

clc

Established Member
Joined
31 Oct 2011
Messages
1,301
More likely Portobello and Abbeyhill Capital Rail Action Group (CRAG) have been campaigning for these. Reopening the junction to Abbeyhill from Waverley has been proposed as part of EGIP as a siding for terminating trains. So why not build a station there and link it to the south via Peirshill. Though I don't think these would enhance services to the Borders slowing them further.

Heriot and Fountain I imagine would be non starters.

http://www.edinburghnews.scotsman.c...-re-open-portobello-railway-station-1-3448630

Salmond's comments were made in the context of government investment in the Borders so I would have thought he was referring to new stations in that region.
 

fegguk

Member
Joined
11 Sep 2012
Messages
173
Location
Hawick
Salmond's comments were made in the context of government investment in the Borders so I would have thought he was referring to new stations in that region.

He says "...seven stations just now we are going to be looking at another two..." This doesn't indicate to me they will necessarily be in the Borders. if the were then where? If he were looking at extending the line I think he would have referred to building more railway not just stations. If he is not talking about extending the railway where would you like him put 2 more station in the Borders.

Who knows it fun to speculate. I'll ask him the next time I see him

Over the next month I am sure we will get plenty of carefully worded promises
 

clc

Established Member
Joined
31 Oct 2011
Messages
1,301
He says "...seven stations just now we are going to be looking at another two..." This doesn't indicate to me they will necessarily be in the Borders. if the were then where? If he were looking at extending the line I think he would have referred to building more railway not just stations. If he is not talking about extending the railway where would you like him put 2 more station in the Borders.

Who knows it fun to speculate. I'll ask him the next time I see him

Over the next month I am sure we will get plenty of carefully worded promises

On reflection, he might have been referring to Reston and East Linton.
 

fegguk

Member
Joined
11 Sep 2012
Messages
173
Location
Hawick
On reflection, he might have been referring to Reston and East Linton.

You could be right most Scottish politician have a limited knowledge of the geography of the Scottish Borders. When assisting at an election a few years ago the party HQ (no names pack drill etc) offered to send leaflets to Hawick by train. I waited in the Station Hotel until shutting time.
 

railjock

Member
Joined
30 Jun 2012
Messages
373
Track down in Bowshank tunnel.
 

Attachments

  • track in bowshank.jpg
    track in bowshank.jpg
    26.6 KB · Views: 122

railjock

Member
Joined
30 Jun 2012
Messages
373
http://www.globalrailnews.com/2014/08/06/borders-railway-gets-its-first-track/


The first section of track of the new 30-mile Borders Railway has been laid in Bowshank tunnel.

Although the Borders line is a single track railway, the 200-metre tunnel has double track which is part of a 6.4-kilometre dynamic passing loop. In the tunnel clearances are tight due to the requirement for passive provision for electrification. Hence the tunnel has slab track.

On a visit to the tunnel on August 5, Global Rail News was advised that it had taken the contractor, BAM Nuttall, two weeks to install the slab track on the down loop and saw that work had just started on the up loop.

On August 9, the project’s first switch and crossing is to be installed at Tynehead, 2.5-kilometre north of the line’s summit at Falahill.

Track laying will commence in October at the northern end of the line and is planned for completion by the end of the year.

BAM Nuttall will call on BAM Rail from Holland to lay track using the technique employed on the HSL-Zuid, the Dutch high-speed line which is expected to lay track at the rate of one kilometre per day.
 

fgwrich

Established Member
Joined
15 Apr 2009
Messages
9,250
Location
Between Edinburgh and Exeter
http://www.globalrailnews.com/2014/08/06/borders-railway-gets-its-first-track/


The first section of track of the new 30-mile Borders Railway has been laid in Bowshank tunnel.

Although the Borders line is a single track railway, the 200-metre tunnel has double track which is part of a 6.4-kilometre dynamic passing loop. In the tunnel clearances are tight due to the requirement for passive provision for electrification. Hence the tunnel has slab track.

On a visit to the tunnel on August 5, Global Rail News was advised that it had taken the contractor, BAM Nuttall, two weeks to install the slab track on the down loop and saw that work had just started on the up loop.

On August 9, the project’s first switch and crossing is to be installed at Tynehead, 2.5-kilometre north of the line’s summit at Falahill.

Track laying will commence in October at the northern end of the line and is planned for completion by the end of the year.

BAM Nuttall will call on BAM Rail from Holland to lay track using the technique employed on the HSL-Zuid, the Dutch high-speed line which is expected to lay track at the rate of one kilometre per day.

Good to see the first major signs of progress on the line. However, and not fully related to this story I do still find it disappointing that the majority of the line is being designed and built as a single track line - not that I expect large parts of it to be doubled in the very near future, but having looked through a fair amount of the photos of the construction progress recently, there does seem to be a slight overuse of Gabion Baskets to shore up cuttings cutting out over the second track - Gorebridge for example, new bridge structures further down the line near to Herriot appear to be single as is the new bridges in Gala, with the bridge over the Gala Water appearing to be central with the old double track spans. I know it's a line that won't be doubled any time soon, but in some areas there does appear to be a little bit of a lack of foresight into the lines potential future. Almost slightly reminiscent of some of BR's actions during the 80s on many former double track routes, of slewing the track into a central position making redoubling difficult.
 

NotATrainspott

Established Member
Joined
2 Feb 2013
Messages
3,223
Good to see the first major signs of progress on the line. However, and not fully related to this story I do still find it disappointing that the majority of the line is being designed and built as a single track line - not that I expect large parts of it to be doubled in the very near future, but having looked through a fair amount of the photos of the construction progress recently, there does seem to be a slight overuse of Gabion Baskets to shore up cuttings cutting out over the second track - Gorebridge for example, new bridge structures further down the line near to Herriot appear to be single as is the new bridges in Gala, with the bridge over the Gala Water appearing to be central with the old double track spans. I know it's a line that won't be doubled any time soon, but in some areas there does appear to be a little bit of a lack of foresight into the lines potential future. Almost slightly reminiscent of some of BR's actions during the 80s on many former double track routes, of slewing the track into a central position making redoubling difficult.

Your points have been a matter of contention for many advocates of the scheme but these are a result of cost increases elsewhere that have pushed the need for economies to be made. The Act of the Scottish Parliament that authorised the line demanded that it be built all the way to Tweedbank or not at all so as to stop the temptation to end at Gorebridge, where the line's business case switches from Edinburgh Suburban Commuter to regional connectivity and investment. It would have been nice to have more funding that would have allowed more money to be spent on preserving the full double-track alignment, but it was not to be. The line has been designed however with passive provision for 4tph to Gorebridge for future commuter demand. 2tph beyond here is predicted to be more than ample for a line of this type, especially when each service can be extended to 6 carriages if the need arises. The line will never have a primary role in cross-border rail traffic even if it were extended to Carlisle as the same timeframe would see the HS2 route extended to Scotland and the G&SW line electrified, so there is not much point in providing for future through traffic that will never come. In future, 4tph to Gorebridge, 2tph to Tweedbank and/or Hawick and then 1tph all the way to Carlisle would be more than sufficient for all purposes. From a reliability perspective most trains will stay on the eastern side of Waverley and will run for only a few miles on tracks shared with other services before reaching the new railway, so there's not as much chance of delays causing problems as there would be on other shorter reopenings such as Alloa or Larkhall.
 

clc

Established Member
Joined
31 Oct 2011
Messages
1,301
I guess if they hadn't value engineered it to such an extent it wouldn't have got built given the cuts in public spending and bearing in mind the business case isn't great.
 

PaxVobiscum

Established Member
Joined
4 Feb 2012
Messages
2,395
Location
Glasgow
Does anyone have photos of the new track?
Does that mean signals can be errected

There a single picture of the new track at Bowshank tunnel in the link given in post #652 above. If it's a picture of the "first switch and crossing at Tynehead" which according to the link was due to be installed yesterday, then I would keep an eye on RailScot over the next couple of days (not that I have inside information).
 

onyxcrowle

Member
Joined
29 Jul 2013
Messages
35
There a single picture of the new track at Bowshank tunnel in the link given in post #652 above. If it's a picture of the "first switch and crossing at Tynehead" which according to the link was due to be installed yesterday, then I would keep an eye on RailScot over the next couple of days (not that I have inside information).


Ok thank you
 

railjock

Member
Joined
30 Jun 2012
Messages
373
There a single picture of the new track at Bowshank tunnel in the link given in post #652 above. If it's a picture of the "first switch and crossing at Tynehead" which according to the link was due to be installed yesterday, then I would keep an eye on RailScot over the next couple of days (not that I have inside information).