DLR B23 Stock (CAF Inneo)

Snow1964

Established Member
Joined
7 Oct 2019
Messages
6,021
Location
West Wiltshire
They're basically the same, the key difference is when they were ordered and entered service. ie the B90/B92/B2K stock are all the same design but ordered at different times, and the B07 is the newer design for capacity increases.

The B2K batch only dates from about 2001, and it appears standardisation is removing it from service, not its age. (So there will be 2 classes of trains, not a relatively small older 3rd batch)

It is unclear if this newer B2K batch will go for scrap, or be sold off to somewhere else as secondhand.

There are also some growth options in current order, although now that TfL are skint I do wonder if they will consider keeping these for shuttles rather than incurring extra capital costs buying extra new trains, probably not as they seem to be able to get CIL (community infrastructure levy) funding from builders in docklands area
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Dstock7080

Established Member
Joined
17 Feb 2010
Messages
2,741
Location
West London
Report to staff today:
Three of the five cars that make up the first new B2023 train are on the finishing line at CAF's Design and Manufacturing facility in Beasain, Northern Spain
 

rebmcr

Established Member
Joined
15 Nov 2011
Messages
3,845
Location
St Neots
Report to staff today:
Three of the five cars that make up the first new B2023 train are on the finishing line at CAF's Design and Manufacturing facility in Beasain, Northern Spain
Interesting designation — I thought the B in the existing names stood for Bombardier.

Upon research I find it means Beckton. Does the lack of P-prefixed stock mean that Poplar is no longer being used for heavy maintenance?
 

southern442

Established Member
Joined
20 May 2013
Messages
2,186
Location
Surrey
It is unclear if this newer B2K batch will go for scrap, or be sold off to somewhere else as secondhand.
Without wanting to open any particularly large cans of worms, There is pretty much nowhere for them to go, unless Essen fancies more ex-DLR stock!
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
24,792
Location
Nottingham
I think if a DLR vehicle could run in Essen it could also run on one of several other high floor segregated German light rail networks that share common technical standards.

However, the original DLR units were sold off with plenty of life remaining, because if they recall correctly they didn't meet the fire standards to operate on the underground extensions to Bank and under the Thames. There's no such restriction on use for the B2K stock, they'll be over 20 years old by the time they are replaced, and I suspect the DLR is quite an unforgiving environment for its rolling stock. So I'd guess it's not worth any other operator paying for pantographs and any other adaptions, and they will be for the scrap line.
 

Taunton

Established Member
Joined
1 Aug 2013
Messages
10,017
As a local inhabitant and regular user I find the descriptions of the DLR stock as "life expired" to be somewhat overstated. The vehicles seem to be in perfect mechanical order, I've never experienced a breakdown of one (more than I can say for their Oyster card readers), and I really can't see what the replacement issue is. Too late now, they are building the replacements, but it does seem somewhat profligate - possibly I can say in best TfL style. I understand that the pleasant transverse seating cannot be changed to the sideways style the B07 cars were rearranged to, because of the layout of some of the underseat equipment; TfL doesn't like transverse seating because they can't stuff so many standees in, which I suspect has something to do with it.
 

hacman

Member
Joined
22 Jul 2011
Messages
332
As a local inhabitant and regular user I find the descriptions of the DLR stock as "life expired" to be somewhat overstated. The vehicles seem to be in perfect mechanical order, I've never experienced a breakdown of one (more than I can say for their Oyster card readers), and I really can't see what the replacement issue is. Too late now, they are building the replacements, but it does seem somewhat profligate - possibly I can say in best TfL style.
That said, be careful what you wish for.

If the rolling stock reaches the point of being unreliable before the process to replace it is started, you end up with... well what we currently have on the TW Metro and to an extent Merseyrail.

Metro, in particular, has been riddled with issues for well over 5 years now due to the age and condition of its fleet (which reached life expiry in ~2010 - perhaps earlier in reality due to the intensity with which it has been used), and it has had a substantial impact on peoples willingness to use the system.

The lack of transverse seating isn't just a TfL thing either sadly - Nexus have specified our entire fleet up here to be the same, much to the dismay of many passengers.
 

londonteacher

Member
Joined
10 Aug 2018
Messages
662
With all services on the DLR being under 30 minutes is there really a need for transverse seating? The answer is no.
 

Mikey C

Established Member
Joined
11 Feb 2013
Messages
6,830
With all services on the DLR being under 30 minutes is there really a need for transverse seating? The answer is no.
Is there a need for any seating (other than a couple reserved for the elderly etc? Or air conditioning?

Yes capacity issues are extremely important, but so is the passenger experience. And the DLR being largely outside and elevated has some cracking views out
 

southern442

Established Member
Joined
20 May 2013
Messages
2,186
Location
Surrey
Is there a need for any seating (other than a couple reserved for the elderly etc? Or air conditioning?

Yes capacity issues are extremely important, but so is the passenger experience. And the DLR being largely outside and elevated has some cracking views out
Exactly. If the issue is trying to get lots of standees in then you could quite easily come up with a 2+1 seating layout with some gaps that has almost as much standing room as a longitudinal seating layout, with far far superior comfort and passenger experience. Longitudinal seating takes all the charm out of the railway journey and whilst there's no monetary value for that I believe it to be a very important thing.
 

Taunton

Established Member
Joined
1 Aug 2013
Messages
10,017
That said, be careful what you wish for.

If the rolling stock reaches the point of being unreliable before the process to replace it is started, you end up with... Merseyrail.
Merseyrail is an unfortunate example with me, because we were living on the line at West Kirby in 1979-ish when they last replaced the trains there. The previous generation stock, built 1938, like the current DLR fleet, performed faultlessly in my experience to the end, and indeed, even looked perfectly presentable when they were being broken up for scrap behind Birkenhead North depot. The replacing 507/508 fleet meanwhile was plagued with initial faults which led to delays and cancellations like had never been experienced before, and which took years to resolve. I don't think this fleet ever got to the fault-free level of their predecessors.
 

southern442

Established Member
Joined
20 May 2013
Messages
2,186
Location
Surrey
If you've grown up around fleets that seemed fairly new or modern when you were younger, it's hard to say exactly when things start to look 'dated'. For example I have always seen the B90/92 as quite a modern hi-tech train, even though they are coming up to 30 years old now. By contrast, when I was growing up was when the slammers were just being replaced with 377s and 450s, so by comparison the 455s that I often travelled on have always seemed like the 'old trains' (and that's always been how I refer to them when talking to people who aren't railway nerds). However if you take a closer look, you can see that the design of the oldest DLR trains is actually starting to show it's age a little, especially with the opening hopper windows and door design.

Another good example is the T&W stock, I think because light rail is a fairly new concept and because they have plug doors, when it was first announced that they were getting replaced my first instinct was 'really?', forgetting that one or two of the units are actually older than the class 313's!
 

Chris M

Member
Joined
4 Feb 2012
Messages
1,057
Location
London E14
Regarding the seating, the DLR is first and foremost a mass transit system whose purpose is moving large volumes of people from A to B, so it is right that the trains be designed for capacity. Views are nothing more than a nice-to-have, but there will be 1 or 2 rows of transverse seats at each end of the new trains..

The current DLR units are indeed showing their age and while failures that completely disable a unit are uncommon, lesser failures that still necessitate removal from service are increasingly common. Mudchute is my local station and so I use it frequently (in normal times), platform 3 (the bay platform) is a favoured place to put a unit out of the way if it's failed on the Lewisham branch, which is happening more than it used to. I suspect the train I saw in Crossharbour siding last week was also being removed from service. On multiple occasions I've had to report door buttons not working or other minor issues. I remember one of the publicity documents from earlier in the process stating that the couplers were also suffering from significant wear and were becoming life expired.
I recall being told shortly before the Olympics by someone who worked for DLR at the time that the fleet reliability was generally poor - and that was (frighteningly) almost 10 years ago now.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
6,021
Location
West Wiltshire
Some new info on the DLR replacement trains is in the TfL Board programmes and Investment committee papers (page 34)

43 trains (33 replacement, 10 enhancement)
14 extra approved Dec2020 (housing infrastructure fund)

The aim of the programme is to manufacture and supply 43 new DLR trains, 33 to replace the life-expired fleet and 10 to increase capacity. It will also include an expanded depot to stable and service the new fleet and signalling modifications to the Thales Automatic Train Operation system to support the new trains. In addition, telecoms system modifications will provide enhanced customer-facing information and traction power capacity works.

Rolling stock manufacturing is under way with Construcciones y Auxiliar de Ferrocarriles. The first three new bodyshells have been completed, with remote first article inspections successfully finished in lieu of visits to the manufacturer’s facilities. The first trains are due for delivery for testing on the DLR network in 2023.

The Beckton depot enabling works package is complete in line with programme. The Beckton depot northern sidings works have started on site to deliver the expanded stabling of the new fleet and are the first major works within the Beckton depot footprint. These works are scheduled for completion in early 2022.

Thales signalling software development for the route signalling modifications required for the introduction of the replacement trains has started. Power upgrade works have also begun on site and are expected to be completed in 2022.

Authority to enter into the grant agreement for the Housing Infrastructure Fund (HIF) works to deliver 14 additional trains and stabling capacity was approved in December 2020 and the grant agreement has now been signed.


.
 

Taunton

Established Member
Joined
1 Aug 2013
Messages
10,017
I do wonder which new housing is intended to be served by whatever additional service is to be provided by the trains funded by the Housing Infrastructure Fund, as the trains are about to arrive, no additional track infrastructure has even been authorised, and key stretches are fully occupied. It does look like it was just a handy government fund to raid.

The DLR is surely about to lose a good proportion of its traffic once Crossrail opens - passengers from Woolwich to Canary Wharf; from the Beckton line now changing at Custom House; Canary Wharf to the City, and other flows.

One also presumes that the new fully articulated trains will need the facility in the depot to lift the whole train at once. As up on the Other Railway at present this practice is under intense scrutiny following the cracking of jacking points in the new type 800 trains, is this really a wise development?
 

TRAX

Established Member
Joined
2 Dec 2015
Messages
1,648
Location
France
One also presumes that the new fully articulated trains will need the facility in the depot to lift the whole train at once. As up on the Other Railway at present this practice is under intense scrutiny following the cracking of jacking points in the new type 800 trains, is this really a wise development?

Just because the trains from one manufacturer have this issue, we have to rethink about articulated trains altogether ?
It’s hardly a new architecture…
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
24,792
Location
Nottingham
Just because the trains from one manufacturer have this issue, we have to rethink about articulated trains altogether ?
It’s hardly a new architecture…
I doubt the fatigue cracking of the jacking points relates in any way to how often they are used for jacking, so the need to jack the whole train when only one part needs attention won't have a significant impact. DLR may use a bogie drop instead anyway.
 

Recessio

Member
Joined
4 Aug 2019
Messages
628
The DLR is surely about to lose a good proportion of its traffic once Crossrail opens - passengers from Woolwich to Canary Wharf; from the Beckton line now changing at Custom House; Canary Wharf to the City, and other flows.
Canary Wharf are one of the people most upset about the delays to Crossrail because they need the extra capacity. Post-pandemic changes to working patterns notwithstanding, that doesnt sound like the DLR will exactly be short of customers...
 

hacman

Member
Joined
22 Jul 2011
Messages
332
One also presumes that the new fully articulated trains will need the facility in the depot to lift the whole train at once. As up on the Other Railway at present this practice is under intense scrutiny following the cracking of jacking points in the new type 800 trains, is this really a wise development?

This practice is perfectly fine, with other railways having worked this way for many years.

One of the earlier examples I can think of is the SA/SE class Copenhagen S-Tog trains have been maintained this way for over 20 years now, with no subsequent issues. Copenhagen Metro also lift entire sets, though I believe (at least for the new depots) this is done with a bogie lift rather than jacks.

The issue is entirely down to the vehicles rather than the practice, though we'll have to wait to find out if it is a design or a construction defect.
 

londonteacher

Member
Joined
10 Aug 2018
Messages
662
I do wonder which new housing is intended to be served by whatever additional service is to be provided by the trains funded by the Housing Infrastructure Fund, as the trains are about to arrive, no additional track infrastructure has even been authorised, and key stretches are fully occupied. It does look like it was just a handy government fund to raid.

The DLR is surely about to lose a good proportion of its traffic once Crossrail opens - passengers from Woolwich to Canary Wharf; from the Beckton line now changing at Custom House; Canary Wharf to the City, and other flows.

One also presumes that the new fully articulated trains will need the facility in the depot to lift the whole train at once. As up on the Other Railway at present this practice is under intense scrutiny following the cracking of jacking points in the new type 800 trains, is this really a wise development?
They are doing a lot of work around West Silvertown developing the area. So could be related?
 

stuu

Established Member
Joined
2 Sep 2011
Messages
2,726
One also presumes that the new fully articulated trains will need the facility in the depot to lift the whole train at once. As up on the Other Railway at present this practice is under intense scrutiny following the cracking of jacking points in the new type 800 trains, is this really a wise development?
Any source for this practice being under scrutiny?
 

100andthirty

Member
Joined
5 Mar 2012
Messages
542
Location
Milton Keynes
One also presumes that the new fully articulated trains will need the facility in the depot to lift the whole train at once. As up on the Other Railway at present this practice is under intense scrutiny following the cracking of jacking points in the new type 800 trains, is this really a wise development?
Just a note: The new trains are 5-car conventional bogie trains: think S stock with longer gangways.

Because of the complexity of the inter-car gangways and the amount of inter-car wiring, these days a whole train lift is usually seen as sensible even if the trains is formed of conventional vehicles. S stock has whole train lift as does the 12 car class 700 trains and such a facility has been used for Pendolinos for a long time.

I'd also make the point that all vehicles have jacking points of some kind. Apart from heritage operations, long gone are the days when one could position a jack under any convenient location on a steel solebar.
 
Last edited:

ScotGG

Established Member
Joined
3 Apr 2013
Messages
1,372
There's a huge number of new homes coming between King George V and Canning Town on the Woolwich branch. I wouldn't worry about it being empty in 5 years. 5000-10,000 homes are approved or in planning.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
6,021
Location
West Wiltshire
CAF (train builders of new DLR trains) have released a mock up video on you tube 12th July 2021. It is just over 5 minutes long

 

Nym

Established Member
Joined
2 Mar 2007
Messages
9,098
Location
Somewhere, not in London
Just a note: The new trains are 5-car conventional bogie trains: think S stock with longer gangways.

Because of the complexity of the inter-car gangways and the amount of inter-car wiring, these days a whole train lift is usually seen as sensible even if the trains is formed of conventional vehicles. S stock has whole train lift as does the 12 car class 700 trains and such a facility has been used for Pendolinos for a long time.

I'd also make the point that all vehicles have jacking points of some kind. Apart from heritage operations, long gone are the days when one could position a jack under any convenient location on a steel solebar.
Also, engineering fleets.
Most of NRs test trains don't have qualified jacking points.
 