    They currently do.
    I suspect it may be some time before KNUCLE needs more than two units and there will be 196s in the equation by then.
     
  2. XCTurbostar

    XCTurbostar Member

    Messages:
    863
    Joined:
    13 Sep 2014
    Agreed. However, like I've said may times in this thread, I think the expectation that 196s will eventually be used on this route is off the mark.
     
  3. HLE

    HLE Established Member

    Messages:
    1,098
    Joined:
    27 Dec 2013
    The 153's would do it in those timings but only just.

    I quite like the look of the timings, it'll be interesting to see how the 25 minute break at Nuneaton each hour goes down with crew and passengers. Asda will do a roaring trade. It's a pity the nuneaton service leaves Leamington on the hour though.

    It's going to cause uproar with the Leicester commuters. As of May there is one train from Leicester that gives connection time at Nuneaton to get into Coventry before 8. At the moment there is 3.

    The 7:10 arrival at Nuneaton from Leicester is retimed to arrive at the same time as the 7:15 leaves for Leamington. So passengers off that train have to wait an hour for a connection to Coventry, along with the passengers off the 7:30 arrival from Cambridge and 7:50 from Leicester. That 8:15 service to Leamington will be rammed.

    The Leicester to Coventry commuters really have been shafted on this one. Those needing to be in Coventry before 8:35 will have to leave Leicester at 6:18 rather than 7:10!
     
  4. HLE

    HLE Established Member

    Messages:
    1,098
    Joined:
    27 Dec 2013
    Steady, the 172's are finally happening on the branch, been rumoured for years!
    Always hoped the electric spine would have got off the ground, using 323's on the route would be interesting
     
  5. HLE

    HLE Established Member

    Messages:
    1,098
    Joined:
    27 Dec 2013
    Interesting that the shunt at Leamington during the evening is still in the timetable.
     
  6. XCTurbostar

    XCTurbostar Member

    Messages:
    863
    Joined:
    13 Sep 2014
    Also interesting that according to RTT (Which I know is not the definitive resource) theyre timed at 100MPH with First and Standard Class? :s
     
  7. Bletchleyite

    Bletchleyite Veteran Member

    Messages:
    34,703
    Joined:
    20 Oct 2014
    Location:
    Up and down the south WCML (mostly)
    They are 100mph units, but the First Class bit is probably a mistake.
     
  8. XCTurbostar

    XCTurbostar Member

    Messages:
    863
    Joined:
    13 Sep 2014
    Unless they're talking about the shiny new bog :D
     
  9. sufian123

    sufian123 Member

    Messages:
    603
    Joined:
    1 May 2017
    Location:
    Birmingham
    First class surely mistake.
     
  10. Spirit555

    Spirit555 Member

    Messages:
    138
    Joined:
    8 Oct 2017
    172002 was having a run up and down the sidings at Tyseley yesterday. Still in Overground livery. It definitely has a toilet fitted from what I saw

    Mark
     
  11. Old Hill Bank

    Old Hill Bank Member

    Messages:
    931
    Joined:
    6 Mar 2010
    Location:
    Kidderminster
    Thanks for the update, shame 006 appears to be stuck at Ilford.
     
  12. Old Hill Bank

    Old Hill Bank Member

    Messages:
    931
    Joined:
    6 Mar 2010
    Location:
    Kidderminster
    It seems 006 has made it as far as Rugby. There is a path for another to move from Willesden to Ilford tomorrow.
     
  13. 87015

    87015 Established Member

    Messages:
    4,171
    Joined:
    3 Mar 2006
    Location:
    GEML/WCML/SR
    003 now also finished its sub-lease back to LO. Dossed on WN until the GEML block lifts for it to trundle to Ilford for looking at.
     
  14. Old Hill Bank

    Old Hill Bank Member

    Messages:
    931
    Joined:
    6 Mar 2010
    Location:
    Kidderminster
    006 now at Tyseley
     
  15. XCTurbostar

    XCTurbostar Member

    Messages:
    863
    Joined:
    13 Sep 2014
    Since things are getting a little complex now. Heres a list (because I know you all like them)

    All units are owned by Angel Trains. Built in 2010.

    172001 Leased to West Midlands Trains, Sub-leased to Arriva Rail London (LO) In service London Overground Livery
    172002 Leased to West Midlands Trains At Tyseley for testing Unbranded London Overground Livery
    172003 Leased to West Midlands Trains At Ilford for fitting of Toilet Unbranded London Overground Livery
    172004 Leased to West Midlands Trains, Sub-leased to Arriva Rail London (LO) In service London Overground Livery
    172005 Leased to West Midlands Trains, Sub-leased to Arriva Rail London (LO) In service London Overground Livery
    172006 Leased to West Midlands Trains At Tyseley for testing Unbranded London Overground Livery
    172007 Leased to West Midlands Trains, Sub-leased to Arriva Rail London (LO) In service London Overground Livery
    172008 Leased to West Midlands Trains, Sub-leased to Arriva Rail London (LO) In service London Overground Livery

    All 172/0s are to be released from London Overground by March.
     
  16. Old Hill Bank

    Old Hill Bank Member

    Messages:
    931
    Joined:
    6 Mar 2010
    Location:
    Kidderminster
    Two more came off lease yesterday and should move to Ilford tomorrow, I think 003 is still there.
    There are Tyseley-Stratford return paths in the system starting tomorrow for staff training, lets see if they get used.
    Remaining three should finish with LO on 15th March.
     
  17. nuneatonmark

    nuneatonmark Member

    Messages:
    399
    Joined:
    5 Aug 2014
    The time for more than 2 units being required will be the bay platform is completed at Coventry. The latest promised date was sometime later this year but god knows when it will actually happen. Having 2 trains per hour will be a huge improvement and would alleviate the connection issues from Leicester that are unfortunately caused by the new timetable, although it’s Crosscountry who are mostly causing the problem.
     
  18. HLE

    HLE Established Member

    Messages:
    1,098
    Joined:
    27 Dec 2013
    I expect the first few days to be cancelled. Unless another depot is being trained on them at the minute
     
  19. XCTurbostar

    XCTurbostar Member

    Messages:
    863
    Joined:
    13 Sep 2014
    The Bay platform will not be built this year. The Design hasn't entered GRIP 5 yet.. The extra 172/0s will most likely help support the 172/2s whilst they are being re-stickered and refreshed. They will also help remove the 153s.
     
  20. HLE

    HLE Established Member

    Messages:
    1,098
    Joined:
    27 Dec 2013
    It's been December 2019 for a while now. Rumours were abound a month ago internally that 2 an hour from May was happening. Unless they chuck it in the timetable at the last minute I can't see it happening.

    More than 2 units are needed. For other parts of the network to release the 153's.
     
  21. Old Hill Bank

    Old Hill Bank Member

    Messages:
    931
    Joined:
    6 Mar 2010
    Location:
    Kidderminster
    With Chase Line going mostly electric and 230s doing Marston Vale I would expect the 150s and the 153s to go. We might even get an additional seat or two on Snow Hill services!
     
  22. sufian123

    sufian123 Member

    Messages:
    603
    Joined:
    1 May 2017
    Location:
    Birmingham
    150s still used on bhm-Hereford route. M-F only one is booked. Hard to says
     
  23. HLE

    HLE Established Member

    Messages:
    1,098
    Joined:
    27 Dec 2013
    All has gone quiet on the supposed cascade of 153's to EMT.

    Wonder if WMT will do a 153/150 farewell tour. Leam-Nun, back to Cov, up to Birmingham, down to Great Malvern then back and across to Rugeley.

    They've been working the local lines round here since new
     
  24. Class 170101

    Class 170101 Established Member

    Messages:
    4,629
    Joined:
    1 Mar 2014
    Surely cascading the 153s is pointless? They don't meet PRM regulations so have to be scrapped so why send them to EMT?
     
  25. The Planner

    The Planner Established Member

    Messages:
    8,744
    Joined:
    15 Apr 2008
    Won't be the start of May 20 either. Why are XC causing an issue?
     
  26. Old Hill Bank

    Old Hill Bank Member

    Messages:
    931
    Joined:
    6 Mar 2010
    Location:
    Kidderminster
    What will not start on 20th May?
     
  27. Bletchleyite

    Bletchleyite Veteran Member

    Messages:
    34,703
    Joined:
    20 Oct 2014
    Location:
    Up and down the south WCML (mostly)
    They don't "have to be scrapped". The compliance work would be relatively cheap if the toilet was removed rather than converted (other work is nowhere near as expensive or complex). They can then be used to extend other toilet-fitted trains.
     
  28. The Planner

    The Planner Established Member

    Messages:
    8,744
    Joined:
    15 Apr 2008
    I meant that the 2tph Cov Nuneaton service won't start until after the May 2020 timetable starts as the bay and the changes to the sidings won't be done.
     
  29. anamyd

    anamyd Member

    Messages:
    720
    Joined:
    17 Aug 2018
    Such as...?
     
  30. Kite159

    Kite159 Veteran Member

    Messages:
    12,154
    Joined:
    27 Jan 2014
    Location:
    West of Andover
    I guess that service on the Snow Hill Lines which is a 170+153 [i.e. 1804 Dorridge to Stourbridge Junction] will be an easy one to convert to a pair of 172/0s which frees up a 170 & a 153.
     