I went passed OOC twice today and I saw both DRS 57's but no sign of the 345... is it inside the OOC Crossrail depot shed now?It was delivered into the OOC Crossrail depot yesterday. There are others to be delivered between now and Christmas
Thanks so much Nippy. Of course I'm away all day despite waiting for this thing since October.The latest date I've seen for first ECTS testing on the Heathrow Branch is overnight 24th November, with the unit being delivered to Maidenhead Monday 20th November.
the crossrail depot at old oak is so far away from the mainline its kind of hard to see whats really going on in thereI went passed OOC twice today and I saw both DRS 57's but no sign of the 345... is it inside the OOC Crossrail depot shed now?
Seems that they have 'peak' and 'off peak' modes. The former excludes 'Exit for...' information whereas the latter includes it. Also noticed on an external display that information changed as the train arrived the station - from 'Shenfield [next line] via Stratford' to 'Shenfield [next line] Next stop Maryland' (inattentively without the semicolon)315s substituting on 2W52 tonight...
Any news on the PIS update?
Seems that they have 'peak' and 'off peak' modes. The former excludes 'Exit for...' information whereas the latter includes it. Also noticed on an external display that information changed as the train arrived the station - from 'Shenfield [next line] via Stratford' to 'Shenfield [next line] Next stop Maryland' (inattentively without the semicolon)
Makes sense, similar to the "Tourist" mode on the 1973 stock.
There have been Saturday runs in the past, but there will not be for the remainder of 2017 due to engineering work closing off part of the line.I hope it's OK to post here and ask you guys for some help?
I have a train obsessed 4 year old who keeps refusing to go to nursery because he must travel on the Crossrail train. .. (We just went to Disney which was entirely eclipsed by the RER train for him!)
I'm very happy to have a trip to Shenfield and back but can't work out when we should go to Liverpool Street to catch one. I have read back through this thread a little, but don't have the expertise to work out if that information is already here. I'm thinking about Saturday.
Thank you so much for any advice you can offer me.
There isn't engineering work on every weekend for the remainder of 2017.There have been Saturday runs in the past, but there will not be for the remainder of 2017 due to engineering work closing off part of the line.
It's just something that I've read. I don't know whether it is still accurate but I haven't seen any.There isn't engineering work on every weekend for the remainder of 2017.
The 18:07 departure from Liverpool St (a class 345) apparently broke down between Seven Kings and Goodmayes today and had to shunted into the platform by a 315. They seem to be breaking down all too often.
Thanks both. That gives me a bit of a dilemma!
Perhaps I'll see if I can persuade him to wait until a weekday...
37601 & 608 hauling 345015 running as 6X77 approximately 67L being routed into Wembley Yard at 15:15, where I presume it will stay until post evening peak.
1020 Crewe to Ilford http://www.realtimetrains.co.uk/train/O43395/2017/11/13/advanced
There was also an Old Dalby to Wembley http://www.realtimetrains.co.uk/train/R10359/2017/11/13/advanced
Don't know what it is though!
Why not? Most of the deliveries from Old Dalby to Wembley have then moved themselves to Ilford.I'm presuming 002 will operate this tonight, with one or both of the ROG loco's arriving from Ilford to take it there (though it suggests it's under it's own power... surely not?): http://www.realtimetrains.co.uk/train/R10460/2017/11/13/advanced