I've seen technical details of what is happening to the fleet, but no timetable for it?
Are the ex-460s already being worked on?
Presumably no current 458s will be taken out of service until the ex-460s are done- or at the very least, a pair is available. Ideally several pairs, to allow the 450HCs to go off to be restored to standard configuration
Are the ex-460s already being worked on?
Presumably no current 458s will be taken out of service until the ex-460s are done- or at the very least, a pair is available. Ideally several pairs, to allow the 450HCs to go off to be restored to standard configuration