Class 701 'Aventra' trains for South Western Railway

Discussion in 'Traction & Rolling Stock' started by pompeyfan, 20 Jun 2017.

  1. swt_passenger

    swt_passenger Veteran Member

    Messages:
    21,458
    Joined:
    7 Apr 2010
    The original SWT blurb about the 707 did say 533 standing, but the franchise agreement is dated after the downward revision of DfT’s 707 capacity formula for the train to 3 per sq m. That doesn’t account for all the change, but it’s also possible the original figure was a crush load, rather than the expected 4 per sq m.
     
    Last edited: 2 Sep 2019
  2. Goldfish62

    Goldfish62 Established Member

    Messages:
    3,807
    Joined:
    14 Feb 2010
    The renders show a virtually identical internal layout to the 700s, albeit without the intrusive heater ducting. No longitudinal seats.

    GA had a long lead time on their units and were able to display mockups which influenced the final design. The finished interiors were not shown publicly until well after testing had started.

    SWR ordered the 701s immediately after the franchise agreement was signed and with the original timescales the interior layout was already locked down.
     
  3. Midmat

    Midmat Member

    Messages:
    30
    Joined:
    16 Sep 2015
    Seemed inevitable but confirmation now that first in service trains not due until mid-2020
    https://www.standard.co.uk/news/tra...900m-fleet-of-driveronly-trains-a4226831.html
     
  4. Bessie

    Bessie Member

    Messages:
    65
    Joined:
    30 Oct 2017
    Least surprising news of the day. At least I can enjoy the "luxury" of the 458/5 seats for a little longer!
     
  5. Mikey C

    Mikey C Established Member

    Messages:
    2,973
    Joined:
    11 Feb 2013
    And thankfully for you, unlike the Goblin users and their 172s, the current trains don't have an urgent date to be transferred elsewhere!
     
  6. samuelmorris

    samuelmorris Established Member

    Messages:
    4,210
    Joined:
    18 Jul 2013
    Location:
    Brentwood, Essex
  7. Goldfish62

    Goldfish62 Established Member

    Messages:
    3,807
    Joined:
    14 Feb 2010
    I don't think it was a secret, except to the ES. Mellors stated in Modern Railways that none would be in service until next year.
     
  8. samuelmorris

    samuelmorris Established Member

    Messages:
    4,210
    Joined:
    18 Jul 2013
    Location:
    Brentwood, Essex
    But not to the public they didn't, did they?
     
  9. hwl

    hwl Established Member

    Messages:
    4,907
    Joined:
    5 Feb 2012
    At least being honest/realistic about the amount of time between completion of first units (5 & 10 car) and testing before entry into service unlike many other current introductions.
     
  10. samuelmorris

    samuelmorris Established Member

    Messages:
    4,210
    Joined:
    18 Jul 2013
    Location:
    Brentwood, Essex
    I suppose so, but "Spring" to "middle of" is fairly ambiguous anyway, gives a lot of room for inevitable setbacks. The partially automated control on these units is probably going to take a while to get right.
     
  11. 387star

    387star On Moderation

    Messages:
    5,785
    Joined:
    16 Nov 2009
    I assume ironing boards won't be fitted <(
     
  12. Meerkat

    Meerkat Established Member

    Messages:
    2,209
    Joined:
    14 Jul 2018
    They want a fares freeze?! It’s not like the old stock is pacers, it’s brand new or relatively recently refurbished stuff!
    Don’t think they want to be linking fares rises with new stock anyway - that could go ugly for passengers....
     
  13. TEW

    TEW Established Member

    Messages:
    5,188
    Joined:
    16 May 2008
    The ABDO system is not planned to be operational from the day the units are introduced, but will come later.
     
  14. swt_passenger

    swt_passenger Veteran Member

    Messages:
    21,458
    Joined:
    7 Apr 2010
    Yes, quite a ridiculous statement to make for someone in his position, ie Passenger Focus...
     
  15. hwl

    hwl Established Member

    Messages:
    4,907
    Joined:
    5 Feb 2012
    Given 43% of the services in the 701 area will be seeing 10 car trains up from 8car next year that is still quite a service improvement.
     
  16. Goldfish62

    Goldfish62 Established Member

    Messages:
    3,807
    Joined:
    14 Feb 2010
    What TOCs have ever easily admitted their trains would be late? I don't recall SWT trumpeting late deliveries, and it's not like they had no experience of that.
     
  17. hwl

    hwl Established Member

    Messages:
    4,907
    Joined:
    5 Feb 2012
    Very sensible, it really only makes sense to introduce when all the old stock as been swapped out and everyone is used to driver open etc. already.
     
  18. hwl

    hwl Established Member

    Messages:
    4,907
    Joined:
    5 Feb 2012
    Indeed the 701 will be less delayed than anything SWT did this decade...
    (The only one I can't remember precisely is the 450s in the previous decade)
     
  19. swt_passenger

    swt_passenger Veteran Member

    Messages:
    21,458
    Joined:
    7 Apr 2010
    IIRC the extra 17 x 450s was done with no announcement? If there was one it went under the radar. Perhaps that’s a good way of limiting expectations...
     
  20. hwl

    hwl Established Member

    Messages:
    4,907
    Joined:
    5 Feb 2012
    Everything was information lite back then!
     
  21. Goldfish62

    Goldfish62 Established Member

    Messages:
    3,807
    Joined:
    14 Feb 2010
    I think they were about 5-6 months late, which was an improvement over the 18 months late for the 458s.
     
  22. hwl

    hwl Established Member

    Messages:
    4,907
    Joined:
    5 Feb 2012
    707s also a good 8 months late for the 1st unit then got worse!
    455 retraction etc also over a year late.
    Given Derby build rates they should all be completed by the end of next year may be Jan 2021 but there will be a lot of units completed by the time the first is in service with easily 5 in daily testing and 3/4 for daily driver training.
     
  23. hwl

    hwl Established Member

    Messages:
    4,907
    Joined:
    5 Feb 2012
    The fun bit will be finding enough 3rd rail network to test and do driver training on.
     
  24. RealTrains07

    RealTrains07 On Moderation

    Messages:
    1,383
    Joined:
    28 Feb 2019
    Funny how the first unit is near completion but wont be delivered until early next year? Doesn’t sound very complete to me :lol:

    Not sure about the 701s being driver operation only. Creates more fair dodgers if you ask me
     
  25. Goldfish62

    Goldfish62 Established Member

    Messages:
    3,807
    Joined:
    14 Feb 2010
    Class 458/5 rebuild 15 months late, Class 456 refurbishment a year list, to add to the list.
     
  26. theking

    theking Member

    Messages:
    394
    Joined:
    30 Sep 2011
    They won't be handed over to SWR until they are nearly/ready for passenger service so driver training can commence.

    The 710's were not handed over to ARL until the last minute and the units were signed off enough so driver training could commence all the testing was done by Bombardier.
     
  27. hwl

    hwl Established Member

    Messages:
    4,907
    Joined:
    5 Feb 2012
    It is called proper testing and de bugging. Realistically SWR will want about 15 fully working units before the first goes into service and have lots of driver training done before hand otherwise the logistics then get very messy. On the SWR Metro network there need to be lots of driver training in advance to make entry into service smooth. GTR pulled the plug on Siemens try to do otherwise with the 700s eventually as you need a decent float of debugged units till fairly far in to the roll out. CAF roll out at Northern has been shambles
     
  28. Bigfoot

    Bigfoot Member

    Messages:
    731
    Joined:
    2 Dec 2013
    Gbrf will be undertaking the majority of the testing according to company council.
     
  29. Goldfish62

    Goldfish62 Established Member

    Messages:
    3,807
    Joined:
    14 Feb 2010
    Testing at Old Dalby will take several months so it's wholly feasible that the first unit is almost ready.
     
  30. samuelmorris

    samuelmorris Established Member

    Messages:
    4,210
    Joined:
    18 Jul 2013
    Location:
    Brentwood, Essex
    Yes they will.
    Fair enough, I did think that seemed a bit ambitious.
     