I'll start a new thread as the old ones have now been closed.
Since the major work was completed and the line re-opened there have been several occasions when the line has been closed beyond Llanwrst North due flooding a little to the south but now, the line re-opens the next day as it has been no more than surface water. However TFW Journey Check is showing cancellations throughout on Sunday and Monday due to PREDICTED FLOODING
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

DelW

Established Member
Joined
15 Jan 2015
Messages
3,835
I'll start a new thread as the old ones have now been closed.
Since the major work was completed and the line re-opened there have been several occasions when the line has been closed beyond Llanwrst North due flooding a little to the south but now, the line re-opens the next day as it has been no more than surface water. However TFW Journey Check is showing cancellations throughout on Sunday and Monday due to PREDICTED FLOODING
Presumably the title should refer to 23 and 24 May?
 

Tomos y Tanc

Member
Joined
1 Jul 2019
Messages
640
I think occasional flooding on the Conwy valley line is pretty much inevitable. The question is always whether the infrastructure is intact when the waters recede.
 

DelW

Established Member
Joined
15 Jan 2015
Messages
3,835
Duly amended. Don't know what I was thinking of unless it was the February seasonal weather in May :oops::oops:
Certainly feels pretty much like February round here at the moment :'(
 

Parham Wood

Member
Joined
13 Jun 2011
Messages
329
Line is very prone to flooding in the rock cutting between the Llanrwst stations just from local rainfall and not the river flooding. Perhaps one day they will put in better drainage but it will probably be a difficult job.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
16,636
Yet again?

How much damage will be done this time.
 

PHILIPE

Veteran Member
Joined
14 Nov 2011
Messages
13,472
Location
Caerphilly
Yet again?

How much damage will be done this time.

Since the major work was done and the closure for months there has been nothing worse than you find in other parts. If it floods now it's down by the next day and not worth mentioning as a major event.
 

Parham Wood

Member
Joined
13 Jun 2011
Messages
329
Yet again?

How much damage will be done this time.
Given the weather patterns over the past few years the river will flood most years. Parts of the valley are really a flood plain but tinkering around with the river (not the rail works) has moved the flooding further upstream (I think). The embankment reinforcements with large stone blocks look very sturdy and should be enough to stop damage to the railway where these are placed unless they divert the problem to another part of the railway.
 

Kite159

Veteran Member
Joined
27 Jan 2014
Messages
19,157
Location
West of Andover
I was surprised to see it reopen on Saturday after it was closed on Friday due to flooding. Especially after how wet Friday was.

First train got cut back to North Llanrwst but the other 3 ran through (judging by RTT)
 