Crossrail - Construction updates and progress towards opening (now expected 24 May 2022)

Status
Not open for further replies.

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
7,448
Location
London
That’s correct. It’s mathematically possible to reverse 24tph in that way but it is a performance risk.

Mathematically yes, but you'd probably have departure / arrival conflicts from the 2 running lines, so there would definitely be delays.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

306024

Established Member
Joined
23 Jan 2013
Messages
3,940
Location
East Anglia
Mathematically yes, but you'd probably have departure / arrival conflicts from the 2 running lines, so there would definitely be delays.

No reversing 24tph at Westbourne Park can be planned conflict free, but of course needs everything to run on time. Only one train in five is a conflict if you are using all five roads, everything else can be planned as parallel moves.
 

matt_world2004

Established Member
Joined
5 Nov 2014
Messages
4,504
The new entrance at Southall is open today a few fare dodgers looked rather sheepish when caught out by the new Gateline . does anyone know if they are planning on widening platform.4
They have the land and its very narrow
 

Non Multi

Member
Joined
11 Dec 2017
Messages
1,117
The new entrance at Southall is open today a few fare dodgers looked rather sheepish when caught out by the new Gateline . does anyone know if they are planning on widening platform.4
They have the land and its very narrow
Only platform lengthening is mentioned on the Southall page on the Crossrail website.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
6,025
Location
West Wiltshire
TfL Press Release regarding opening of Southall ticket hall for Elizabeth line

New spacious station building opens following major redevelopment by Network Rail with more room for customers to enter and leave the station

Southall station has been given a new lease of life by Network Rail with a new ticket hall and lifts opening for customers today (Thursday 26 August) as part of upgrades for the transformational Elizabeth line.

People using Southall station will benefit from a brighter, more spacious station entrance with a new ticket hall constructed from glass and steel, including a wider gateline for tickets and contactless payments. There are also three new lifts and a new footbridge, which provide step-free access to all four platforms at the station.

 

Geogregor

Member
Joined
16 Sep 2016
Messages
198
Location
London
TfL Press Release regarding opening of Southall ticket hall for Elizabeth line




And some of my shots:

20210826_170931
by Geogregor*, on Flickr


20210826_170942
by Geogregor*, on Flickr


20210826_171019
by Geogregor*, on Flickr


20210826_171103
by Geogregor*, on Flickr


20210826_171223
by Geogregor*, on Flickr


20210826_171308
by Geogregor*, on Flickr
 

Acton1991

Member
Joined
20 Jan 2019
Messages
354
I love that they have retained the Punjabi (?) signage - I was worried that was going to disappear once the station had been TfL'd.
I wonder whether they will retain it on the platform signage too - not sure where it would go on the roundel...
 

SynthD

Member
Joined
4 Apr 2020
Messages
1,137
Location
UK

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,215
I do like the retention of the Punjabi signage, and including it on the main entrance.
 

kevin_roche

Member
Joined
26 Feb 2019
Messages
930
Mark Wild's latest report to the London Assembly Transport Committee is now available on the TfL website.


It reports the failure of two transformers which is worrying. Are there more of these that will need to be replaced?

On 21 July and 3 August, failures occurred to two Voltage Transformers, which measure the voltage
on the 25kV line. Whilst no injuries were reported, the Office of Rail and Road have been informed of
these incidents. A formal investigation is underway to ascertain remedial action.

There is a plan to demonstrate that the system can cope with 24tph, but it has not been linked in the report to the rollout of the ELR100 software release.

The ELR100 software is the last major configuration before revenue service and is pivotal to the
programme advancing through to the next phase of the programme, known as Trial Operations.

In order to help demonstrate that the Elizabeth line can run at the necessary performance
levels for future service, we will be undertaking ‘testing’ 24tph train movements on the railway in the
autumn. This will be the service frequency in the central section when the full end-to-end Elizabeth
line is operational.

One other issue mentioned is the need to upgrade the Tunnel Ventilation System. Does anyone know what the issues with this are?

Once the software is ready to be commissioned a further blockade, planned for the autumn, will take place
to complete elements of outstanding works in the tunnels, including completion of the Tunnel
Ventilation System (TVS) upgrade works.
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,477
Location
Between Peterborough & Bedlington
TfL have published a new schedule of upcoming engineering work dated 1st September.

Covers TfL rail, overground and Underground and goes through to early March, so dates of upcoming work on TfL rail lines are on the link.

I can add that Sunday's work covers the GEML right up to Marks Tey & Billericay. IIRC this is track work east of Shenfield, and traction power upgrade works (IIRC the AT goes live between Pudding Mill Lane & Shenfield) which mean an all-day isolation of the eastern arm of TfL Rail.
 

hwl

Established Member
Joined
5 Feb 2012
Messages
7,354
Covid 19 related changes?
There have been design and installation "issues" and "problems" for years. (not enough parallel inter-dependencies from memory, e.g. too many single points of failure)
Ventilation system functionality is linked to the number trains that can run for fire safety reasons, you lose too many fans and the service levels need to drop immediately which is done via the signalling system.
 

stuu

Established Member
Joined
2 Sep 2011
Messages
2,729
There is also the possibility that the system doesn't work as well in practice as in theory, once the dynamic effects of moving trains are added. That is entirely speculation on my part though
 

Kay_M

Member
Joined
18 Apr 2019
Messages
93
The new entrance at Southall is open today a few fare dodgers looked rather sheepish when caught out by the new Gateline . does anyone know if they are planning on widening platform.4
They have the land and its very narrow
I wonder what will happen to the old Southall station entrance?
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
31,267
I wonder what will happen to the old Southall station entrance?
The planning application says it and the existing stairs and footbridge are retained for emergency escape. Same as at one of the others, Acton Mainline or West Ealing IIRC, we discussed it in another thread about the Western stations few months ago.
 

Class 170101

Established Member
Joined
1 Mar 2014
Messages
7,909
There have been design and installation "issues" and "problems" for years. (not enough parallel inter-dependencies from memory, e.g. too many single points of failure)
Ventilation system functionality is linked to the number trains that can run for fire safety reasons, you lose too many fans and the service levels need to drop immediately which is done via the signalling system.

Oh right. I thought it might have been covid related because the news over the last few weeks and months is suggesting that good ventilation is way to reduce the spread of covid.
 

matt_world2004

Established Member
Joined
5 Nov 2014
Messages
4,504
Anyone know if the second staircase has been descoped from Hayes and Harlington( the one by tescos) the handrail where it would go looks like a permanent edition

The new entrance has opened at Hayes. The wall on platform 5 without cladding appears to be a graffiti target and the roof in the new station building looks poor.with exposed cabling and no tiling where the lights are so don't know how.much work is going to be done.
 
Last edited:

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
7,448
Location
London
Anyone know if the second staircase has been descoped from Hayes and Harlington( the one by tescos) the handrail where it would go looks like a permanent edition

The new entrance has opened at Hayes. The wall on platform 5 without cladding appears to be a graffiti target and the roof in the new station building looks poor.with exposed cabling and no tiling where the lights are so don't know how.much work is going to be done.

The full press release is here: https://www.crossrail.co.uk/news/ar...-step-free-access-to-hayes-harlington-station

If it's anything like Ealing Broadway and Southall, there will still be plenty of 'snagging' work going on in the next few months.#

I did also like this slid in at the bottom
London will ultimately fund the majority of the cost of the Elizabeth line, and when the railway opens in the first half of 2022, it will operate as three separate railways. Customers from Hayes & Harlington will initially have to change at Paddington for services into the central section of the route.
 
Last edited:

kevin_roche

Member
Joined
26 Feb 2019
Messages
930
A new video today giving details of an exercise in how a situation of a broken rail might be handled.

 

iphone76

Member
Joined
6 Nov 2010
Messages
917
Location
South Essex
Today is the first day of testing the auto reverse system in Westbourne Park sidings / back to Paddington. The trials are running between around 0900 and 1530 so will be interesting to see how it all works.
 

kevin_roche

Member
Joined
26 Feb 2019
Messages
930
Today is the first day of testing the auto reverse system in Westbourne Park sidings / back to Paddington. The trials are running between around 0900 and 1530 so will be interesting to see how it all works.
Does it work? Everything seems to be running a bit later than planned.

autorev_2021_09_21.PNG
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
7,448
Location
London
Today is the first day of testing the auto reverse system in Westbourne Park sidings / back to Paddington. The trials are running between around 0900 and 1530 so will be interesting to see how it all works.

How does it work in practice then; driver leaves Paddington, gets out of the cab and moves to the other end whilst the train is on the move to Westbourne Park, and then drives off back to Paddington at the other end once its stationary at the sidings? That's what my understanding of it was.
 

matt_world2004

Established Member
Joined
5 Nov 2014
Messages
4,504
How does it work in practice then; driver leaves Paddington, gets out of the cab and moves to the other end whilst the train is on the move to Westbourne Park, and then drives off back to Paddington at the other end once its stationary at the sidings? That's what my understanding of it was.
I'm surprised this was signed off from a safety perspective. Westbourne Park sidings is above ground and is not exactly trespass proof
 