DenmarkRail
Member
- Joined
- 13 Jun 2016
- Messages
- 665
Again, I’m sure we’ll learn more about whether or not it’s all on schedule on the open days this weekend.
Again, I’m sure we’ll learn more about whether or not it’s all on schedule on the open days this weekend.
I’ve missed the previous open days, but it would be great to have a look at the stations - I couldn’t find any reference to open days this weekend though! Are there likely to be any more before the service starts?
No-one remembers the Jubilee Line Extension opening late these days. Or the fact that it opened in stages with Stratford - North Greenwich being the first stage and Westminster Station not opening until some time later, with trains running through non-stop, if I remember correctly.
It will be a bit embarrassing if Crossrail doesn't open on time but in a year or two all will be forgotten.
You started this thread with the best intentions, but there is yet another new Crossrail discussion in ‘allocations and timetables’ about the paths now appearing in RTT.Does the service shown here represent the start of dynamic testing from the western portal at Royal Oak all the way through the core to Customs House?
http://www.realtimetrains.co.uk/train/G30021/2018/07/29/advanced
I spotted 031 and 032 sitting just outside the western portal this morning. Are they running testing through the core now?
The sort of thing which usually gets mentioned in the 345 rolling stock forum thread of course. The OP of this thread requested it be specifically to discuss systems testing in the core, which is why the thread is practically unused.I've seen late night runs ECS moves of the class 345 go between maidenhead and Paddington . I also saw a class 345 broken down (Well not moving for a long time ) at the Heathrow junction ramp. And there have been class 345s stabled tunnel side at Westbourne park