WizCastro197
Established Member
Do you mind linking the site where you found such timetableThe provisional timetable looks exactly the same to me for LUMO
It would really help me in the future
Thanks
Do you mind linking the site where you found such timetableThe provisional timetable looks exactly the same to me for LUMO
Railway Data, they have regularly updated timetables for the GB network and the provisional December timetable has been available for some weeks now.Do you mind linking the site where you found such timetable
It would really help me in the future
Thanks
A full page on all the changes:
Timetable updates | Southeastern
www.southeasternrailway.co.uk
First Class is also going, although this isn't really a surprise given it's pretty much always empty.
Cut back, but extended 2tph to Paddock Wood so an improvement I'd say, will require a 4th unit to be out all day as well as more traincrew.
Under the December timetable most trains on the Medway Valley Line will terminate at Paddock Wood to reduce congestion at Tonbridge. This is part of a plan to reduce congestion at all junctions, which will improve punctuality and see fewer cancellations.
Any Indication to when Lumo timetable may be out? Apologies if it has already been talked about
Great, it only takes 5 trains to get from Medway to Gatwick!Southeastern curtailed the Medway Valley services to Paddock Wood
Not running the Medway Valley line through to Tonbridge is very poor decision with a limp excuse ofA full page on all the changes:
Timetable updates | Southeastern
www.southeasternrailway.co.uk
First Class is also going, although this isn't really a surprise given it's pretty much always empty.
The timetable is the same at school hours as it is the rest of the day so it either works or it doesn't. When will the railway get you need to provide connectivity if you are going to promote modal shift.Trains no longer run to Tonbridge except at school times and at the beginning and end of the day, to reduce congestion at Tonbridge. This is part of a plan to reduce congestion at all junctions, which will improve punctuality and see fewer cancellations. Change at Paddock Wood for trains to Tonbridge (8 & 13 minute interchange).
So you're saying that all the people I talk to who still work from home 2-3 days a week are lying? I say to you, stop pretending travel is ever going to return to pre-pandemic levels as far as commuting is concerned. Spoiler: It's not. EVER.You can’t keep using covid, people are going back to work, the “covid lifestyle” is over people, are travelling again, work from home is basically at its minimum at this point, let’s stop pretending we are in covid times.
Assuming you mean Gillingham/Chatham/Rochester, how many people seriously travel to Gatwick via Maidstone and Tonbridge? Either travel via Victoria or London Bridge - two trains in either case.Great, it only takes 5 trains to get from Medway to Gatwick!
So you're saying that all the people I talk to who still work from home 2-3 days a week are lying? I say to you, stop pretending travel is ever going to return to pre-pandemic levels as far as commuting is concerned. Spoiler: It's not. EVER.
Fundamentally must agree. The fact the trains do not go through, at least hourly, is a farce. When you consider that the number of trains on the main line will be no more than now (they haven’t introduced the extra 2tph on the Ashford route as fast trains that were planned, nor are the Hastings trains using those accelerated paths), they have no justification to my mind.Some interesting changes to Maidstone East services. The handful of recently introduced Blackfriars services go and are replaced with... an all-day service to Charing Cross.
Timings when they join the South Eastern Mainline at Chislehurst seems a little bit tight though - they're timed to pass through Chislehurst just 2½ minutes before a fast service from Sevenoaks - not helped by the re-timing of that service's departure from Sevenoaks being brought forward by 2 minutes compared to now! Thankfully on the return the Sevenoaks fast service departs before the Maidstone East service avoiding further reactionary delays should the Maidstone East service pick up a delay crossing the slow lines at Chislehurst on to the Reversible Chatham Loop.
It's disappointing to see the loss of through services, but an improvement to the frequency through to Paddock Wood is definitely an improvement over the last time Southeastern curtailed the Medway Valley services to Paddock Wood - at least now if connections go awry, you won't be waiting an hour for the next service.
The same justification has been given as before though (emphasis mine);
Given these services continue through to Tonbridge during the busier peak period, and the new junction conflicts/congestion introduced by the Maidstone East to Charing Cross services this seems like a somewhat weak justification!
It's not poor. Off Peak, there is far too much freight and seasonal traffic going through Tonbridge. The current timetable doesn't actually work and the only way to work is to take trains out of Tonbridge.Not running the Medway Valley line through to Tonbridge is very poor decision with a limp excuse of
The timetable is the same at school hours as it is the rest of the day so it either works or it doesn't. When will the railway get you need to provide connectivity if you are going to promote modal shift.
Just because you have seen trains a bit busier than April 2020, does not mean they are anywhere near the levels that were in 2019.I’m not calling anyone a liar, I’m going by what I see, When I’m travelling either from Westcombe Park or Blackheath trains are much busier than they have been in the peaks in the last two years, so I can only go by my observations, I think most of us have moved on from covid now.
Yes more people are going back to work so trains are busier than recently, but many companies have figured that it's a lot cheaper to have working from home permanently for at least a few days a week, so commuter numbers are down and the figures show this - I personally don't think the numbers will ever recover to 2019 levels which is what pre pandemic is since I don't see working from home ever going away.I’m not calling anyone a liar, I’m going by what I see, When I’m travelling either from Westcombe Park or Blackheath trains are much busier than they have been in the peaks in the last two years, so I can only go by my observations, I think most of us have moved on from covid now.
A through service from Strood to Gatwick Airport would be great, the last thing people laden with luggage want is multiple changes and at the moment the only realistic option is to go via London.Great, it only takes 5 trains to get from Medway to Gatwick!
No we'll definitely never return to anything like 2019 commuting levels and working from home is only going to increase as technology advances.Yes more people are going back to work so trains are busier than recently, but many companies have figured that it's a lot cheaper to have working from home permanently for at least a few days a week, so commuter numbers are down and the figures show this - I personally don't think the numbers will ever recover to 2019 levels which is what pre pandemic is since I don't see working from home ever going away.
It’s also not realistic. Strood to Redhill perhaps, on an hourly basis, but that hinges on connections with the Ramsgate high-speed in both directions, and good quality connections at Tonbridge from East Kent (Hastings less important as they can go via Eastbourne).A through service from Strood to Gatwick Airport would be great, the last thing people laden with luggage want is multiple changes and the only realistic option is to go via London.
No just 2. Medway to London Bridge. And London Bridge to Gatwick.Great, it only takes 5 trains to get from Medway to Gatwick!
Unfortunately, previous attempts to run such services have shown that demand for a slow trundle on this route is practically inexistant even on through trains. Far more straightforward to go via London, particularly when Maidstone is linked to London Bridge (albeit more expensive).A through service from Strood to Gatwick Airport would be great, the last thing people laden with luggage want is multiple changes and the only realistic option is to go via London.
"Will ever recover".Yes more people are going back to work so trains are busier than recently, but many companies have figured that it's a lot cheaper to have working from home permanently for at least a few days a week, so commuter numbers are down and the figures show this - I personally don't think the numbers will ever recover to 2019 levels which is what pre pandemic is since I don't see working from home ever going away.
Most likely at a much higher cost.No just 2. Medway to London Bridge. And London Bridge to Gatwick.
While this is certainly a problem, at least the Medway Valley line being back to 2tph all day midweek means the connection time at Strood is decent in both directions; before it was over half an hour London bound, and of course if the HS service coming the other way was late enough, the resultant delay would be an hour rather than half an hour.I'm most surprised by the continued non reintroduction of the second high-speed service per hour from faversham to to London. Demand on the existing service is quite high even off peak and I am a regular user of the service when I'm in the south. After a couple of incidences of being left behind I've switched my business to elsewhere and this is clearly all too common as various southeastern booking offices have issued me a refund for the difference where applicable without so much as a raised eyebrow.
Exactly, I think people overestimated working from home, we will go back to 2019 levels eventually, that’s why I think SE are having a knee jerk reaction, trains may not be like they were in 2019 but it’s nearer to that point than it is to 2020-2021."Will ever recover".
A bold statement given how the population is still shooting up in London and SE and East London are the main areas of growth.
Take a look at ONS figures recently.
In 5-10 years we'll look back fondly at those who predicted things would never recover to 2019 levels.
Just because you have seen trains a bit busier than April 2020, does not mean they are anywhere near the levels that were in 2019.
Great, it only takes 5 trains to get from Medway to Gatwick!
No just 2. Medway to London Bridge. And London Bridge to Gatwick.
Most likely at a much higher cost.
A through service from Strood to Gatwick Airport would be great, the last thing people laden with luggage want is multiple changes and at the moment the only realistic option is to go via London.
I've created a new thread for this discussion here: https://www.railforums.co.uk/thread...n-kent-inc-medway-and-gatwick-airport.237704/Unfortunately, previous attempts to run such services have shown that demand for a slow trundle on this route is practically inexistant even on through trains. Far more straightforward to go via London, particularly when Maidstone is linked to London Bridge (albeit more expensive).
Exactly, I think people overestimated working from home, we will go back to 2019 levels eventually, that’s why I think SE are having a knee jerk reaction, trains may not be like they were in 2019 but it’s nearer to that point than it is to 2020-2021.
It's 2022 and in some areas rail passengers are about 90-93% of their pre-pandemic levels. I'm no mathematician, but the services we have right now are definitely not at 93% of what they used to be.
Sorry but I had to pull table 020 due to ongoing changes, only minor, but enough to warrant a full refresh. It will be re-issued at some point soon.Fab digital December timetables are all up already. Lumo trains have LD heading in...
https://timetables.fabdigital.uk/nrt/dec2022/020 London to Lincoln, Doncaster, Hull, Leeds, West Yorkshire, York, the North East, Newcastle, Edinburgh and Scotland.pdf
The rest of the timetables are at https://timetables.fabdigital.uk/nrt/dec2022/
Probably just to give it a bit more recovery time, it's about 51 minutes Strood to Tonbridge so very little slack if anything goes wrong.Not running the Medway Valley line through to Tonbridge is very poor decision with a limp excuse of
The timetable is the same at school hours as it is the rest of the day so it either works or it doesn't. When will the railway get you need to provide connectivity if you are going to promote modal shift.
But theoretically you don’t have to stop at all stations. You could lose a couple, such as having one miss Beltring and Yalding, and the other East Farleigh and Cuxton, and therefore drive down the journey time by another 4 minutes. Push that to the Strood ends and it’s a bit less wobbly.Probably just to give it a bit more recovery time, it's about 51 minutes Strood to Tonbridge so very little slack if anything goes wrong.