    Nice contrast of items on NRE at the moment:
    but also ...
    The problems seem to have started near Slough, but most of the delays are now occurring around Hayes/Southall.
    Some Heathrow Express services have been cancelled, RTT citing "points failure".
    It's not clear if the problems are the result of the Easter work or not.
     
  2. VisualAcid

    VisualAcid Member

    Messages:
    142
    Joined:
    17 Oct 2013
    It wouldn't be a week day without signalling problems between Reading and Padd.
     
  3. Stompehh

    Stompehh Member

    Messages:
    127
    Joined:
    5 Apr 2013
    On top of problems earlier on "near Didcot Parkway".

    I was on the 1428 to Weston Super Mare, which was announced as diverting via Westbury when we left Pad (not calling at Didcot/Chippenham/Swindon), but ended up going the normal route and was on time at every stop.
     
  4. VisualAcid

    VisualAcid Member

    Messages:
    142
    Joined:
    17 Oct 2013
    Delays increasing, good thing I stayed at home an extra day!
     
  5. jj1314

    jj1314 Member

    Messages:
    36
    Joined:
    15 Feb 2011
    Just saw an FGW HST trundle through Bath Spa, in a westerly direction, without any lights on in the carriages. Any connection to the above?
     
  6. VisualAcid

    VisualAcid Member

    Messages:
    142
    Joined:
    17 Oct 2013
    Think that's a regular occurrence.
     
  7. mr_moo

    mr_moo Member

    Messages:
    221
    Joined:
    7 Sep 2009
    Location:
    Swindon
    There was huge works to the route over Easter so I hope these are just teething problems.

    Slough PSB was closed with control of all signalling between Airport Junction and Twyford moving to TVSC in Didcot.

    Also, Moreton cutting Jn East end ladder was completely re-laid, as well as a variety of other works.

    So: The signalling problems are probably due to some last glitches in the system left from the transfer as the equipment beds in and the Didcot issues may have been one of the new sets of points not quite working correctly.

    Today there also seems to be problems, with NRE posting this at 09:32:
    Does anyone know what said 'operating incident' may be?
     
  8. samogers

    samogers Member

    Messages:
    163
    Joined:
    20 Feb 2014
    Location:
    Swansea
  9. VisualAcid

    VisualAcid Member

    Messages:
    142
    Joined:
    17 Oct 2013
    Has there been signalling problems everyday since Easter? Some commuters must be on thin ice being delayed almost every single day.
     
  10. PHILIPE

    PHILIPE Established Member

    Messages:
    7,164
    Joined:
    14 Nov 2011
    Location:
    Caerphilly
    Almost continuous problems !!!
     
  11. TheNewNo2

    TheNewNo2 Member

    Messages:
    904
    Joined:
    31 Mar 2015
    Location:
    Canary Wharf
    I was on a train from Bristol to London during those delays. Unfortunately it only came in 53mins late so I can't claim compensation. It did leave me time to read a book and admire the electrification progress though.
     
  12. LexyBoy

    LexyBoy Established Member Fares Advisor

    Messages:
    4,458
    Joined:
    23 Jan 2009
    Location:
    North of the rivers
    Thought NR were a bit hasty issuing press releases after the Easter works - "travellers in the Thames Valley will benefit from faster journeys through Reading IMMEDIATELY". Er, except for the fact that the reliefs are closed between Reading and Cholsey and there's a reduced service and trains getting stuck behind stoppers for the next week...
     
  13. WelshBluebird

    WelshBluebird Established Member

    Messages:
    2,076
    Joined:
    14 Jan 2010
    Same except mine was exactly 60 mins late so yay compensation. We were sat outside Paddington for about 8 mins and I was counting down pretty much every second haha.
     
  14. mr_moo

    mr_moo Member

    Messages:
    221
    Joined:
    7 Sep 2009
    Location:
    Swindon
    After Easter we've had, that I'm aware of:
    Tuesday: Points failure at Southall - Lost detection.
    Wednesday: Ditto.
    Thursday: One of the new axle counters failed near Twyord.
    Friday: Air con failure in a relay room, with the signalling equiment inside shutting down.
    Saturday: Ok, as far as I know!
    Sunday: Problem with a datalink between TVSC and Hayes, with the associated local interlocking thus putting all signals to red.
    Monday: Failed train at Slough West.
    Tuesday: Points failure at Acton West - Exact reason for failure under investigaion.
    Today: 'Signalling problems' (I know no more) this morning near Hayes.
    Tomorrow: Place your bets now please...
     
  15. Class 172 Fan

    Class 172 Fan Member

    Messages:
    414
    Joined:
    18 May 2014
    Tomorrow? Wrong kind of Sun?
     
  16. louis97

    louis97 Established Member

    Messages:
    1,185
    Joined:
    14 May 2008
    Location:
    Derby
    This morning was the failure of 13 axle counters I think I heard, resulting in the closure of the DM between West Drayton and Slough. There was some issues with resetting them in the usual way.
     
  17. carriageline

    carriageline Established Member

    Messages:
    1,698
    Joined:
    11 Jan 2012
    Wonder what brand of axle counter they use, as there is a nationwide problem with a certain brand...
     
Thread Status:
Not open for further replies.

Share This Page