DarloRich
Veteran Member
Without knowing the detail of what is happening at this time, there is an overview of works required at the Flyover in powerpoint form by Andy Free, Alliance Head of Engineering Assurance. Originally presented to The Institution of Civil Engineers, Herts and Beds Section, 15th March 2018.
Bletchley Flyover from slide 48 on:
https://www.ice.org.uk/getattachmen.../East-West-Rail-Programme-slides-(1).pdf.aspx
Edited to add:
The final line of the presentation at slide 64 is:
thanks - that is very interesting. I was unaware an online copy of this presentation was available.