• Our booking engine at tickets.railforums.co.uk (powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Eritrea 2018 - 14: Final Steam Morning (50 p.)

Status
Not open for further replies.

Roni

Member
Joined
19 Mar 2007
Messages
611
Location
Vienna, Austria
Hi,



To the previous part of the series:
Eritrea 2018 - 13: Levels (50 p.)
http://www.railroadforums.com/forum/index.php?threads/eritrea-2018-13-levels-50-p.14138


Video for this series:




October 27 2018

We started our second sunrise-attempt of the trip Saturday morning. We had learnt from our previous mistakes and departed Asmara earlier. Also, the tarpaulins stayed on the wagons and a few daredevils of the group sanded while our train steamed up the slippery grade.
Made it: we reached our spot on the other side of the summit with smaller Mallet 440.008 just as the sun appeared at 6:18 a.m.
eri1401.jpg




We sanded the moist rails, still the loco only made it into the frame in its second attempt.
eri1402.jpg




I only discovered it later, but at the station in the darkness I had made the rookie mistake to set the focus to manual and not back to autofocus afterwards. Luckily, the setting allowed photos to be sharp up to about 70 mm.
eri1403.jpg





eri1404.jpg





eri1405.jpg





eri1406.jpg





eri1407.jpg





eri1408.jpg





eri1409.jpg




I changed to the forest side after several run-pasts.
eri1410.jpg





eri1411.jpg





eri1412.jpg





eri1413.jpg




One final run past the huts.
eri1414.jpg




The others hiked uphill - I preferred this panoramic view, with yellow highlight of course. Antennas on the mountaintop and tour group erased.
eri1415.jpg




Subsequently, we moved to the forest-S-curve.
eri1416.jpg




I finally recognized the focussing error thanks to these flowers.
eri1417.jpg





eri1418.jpg




Next stop: The curve with bridge where we had met the wedding party on the first afternoon of the trip.
eri1419.jpg




I removed power lines from some images.
eri1420.jpg




View down the valley with main road and railway line. We know the mountain in the background to the right from the morning at Arbaroba.
eri1421.jpg





eri1422.jpg




A 4x1 portrait format panorama.
eri1423.jpg




The train reached my location in no time.
eri1424.jpg




I had to hurry for the second run-past...
eri1425.jpg





... to get this view of the valley.
The panoramic image in larger resolution can be found here:
http://raildata.info/eritrea18/eri1426gr.jpg

eri1426.jpg





eri1427.jpg





eri1428.jpg




The whole section in one picture.
eri1429.jpg




Shortly before 8:30 a.m., we arrived at the 4-arch viaduct as last stop.
eri1430.jpg




Train in the distance: donkeys posing nicely.
eri1431.jpg




Train nearby: donkeys can only just be managed in position.
Power lines removed from this 2x2 panorama.
eri1432.jpg





eri1433.jpg




Shortly afterwards, we were told to walk to the buses as the loco was short on water. It steamed back to Asmara, while we puffed up the path to the main road at 7500 ft altitude. You can spot the water lorry in the background with...
eri1434.jpg




... an old Mercedes truck, donkeys, yellow canisters...
eri1435.jpg




... and?
eri1436.jpg




Bike commuters to the capital!
eri1437.jpg





eri1438.jpg




I snapped shots from the bus of another Art Deco petrol station highlight: former Agip "laboratorio chimico".
eri1439.jpg




We took a short break at the hotel where I made sure the photos had turned out sharp. After lunch we returned to Shegerini.
eri1440.jpg




Who would have thought it after days of engine driver shortage and loco failures: the promised double header featuring 440.008 and - the supposedly faulty 442.56! All in all we encountered five engines under steam that trip. The train should have been two passenger carriages longer and should have departed from Arbaroba, but all in all I was pleasantly surprised.
eri1441.jpg





eri1442.jpg





eri1443.jpg




The local children also judged the situation partly happily, partly with scepticism.
eri1444.jpg





eri1445.jpg





eri1446.jpg




We rolled downhill to tunnel 23 for the first run-pasts.
eri1447.jpg





eri1448.jpg





eri1449.jpg




More double Mallet power next time! :)
eri1450.jpg
 
Status
Not open for further replies.

Top