• Our booking engine at tickets.railforums.co.uk (powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Eritrea 2018 - 2: Dusk till Dawn (50 p.)

Status
Not open for further replies.

Roni

Member
Joined
19 Mar 2007
Messages
611
Location
Vienna, Austria
Hi,



To the previous part of the series:
By Double Bod to Double Rod - 1 (50 p.)
http://www.railroadforums.com/forum/index.php?threads/by-double-bod-to-double-rod-1-50-p.13924


Video for this series:




October 21 2018

We start with a wide-angle view of the 4-arch viaduct, only to return here at the end of this part.
eri0201.jpg




The landscape had gone through massive changes the past century. The terraces you see originate from plantations during Italian colonial times. Nowadays, almost nothing is grown on the mountainsides. Most of the trees had been cut down during the 1970s and 80s war, that's why felling of trees is strictly forbidden today.
eri0202.jpg




Observed by the ubiquitous group of children, we boarded a covered goods wagon. We sat on some benches standing on quite dubious floor planks.
eri0203.jpg




Next stop: the wedding society we already had spotted upon arrival.
eri0204.jpg





eri0205.jpg




Bride-rail-photography.
eri0206.jpg




The train had to return to Devil's Gate to quickly take water, then a donkey was pushed out of the way.
eri0207.jpg




Spotlight thanks to donkey-delay.
eri0208.jpg




We steamed uphill to the next spot with a view.
eri0209.jpg





eri0210.jpg




...
eri0211.jpg




A second run-past at one of the few forested places along the mountain line.
eri0212.jpg





eri0213.jpg




Mountain and cloud backdrop had to fit into the picture, so this became a 3x2 panorama.
eri0214.jpg




The class 440 climbed over the summit. At 5:20 p.m., we had reached the kilometre 115 crossing above Asmara which also served as base for the sunset run-pasts.
eri0215.jpg





eri0216.jpg





eri0217.jpg




We waited for the sunset around 6 o'clock, it already was windy and cool.
eri0218.jpg




Bovine meeting.
eri0219.jpg




Rain showers could be seen in the distance - luckily, we did not feel a drop the whole trip. From Tuesday, the weather forecast would be better.
eri0220.jpg





eri0221.jpg




Pan shot - with long shutter time for this high-speed train.
eri0222.jpg




Finally, at 5:55 p.m., the sunlight lit the cloud layer from below.
eri0223.jpg





eri0224.jpg





eri0225.jpg




Seven minutes and several express-runs later the spectacle had come to an end.
eri0226.jpg





We boarded the busses at dark Asmara station and drove to our Savanna International Hotel. I still had to check into my room, then an international buffet followed as dinner in the dining hall.



October 22 2018

I went to bed early, departure next morning was at 5:30 a.m. The same composition as the day before stood ready at the platform.
eri0227.jpg




Our train left the station shortly before six o'clock.
eri0228.jpg




The loco ran around the wagons at the already known crossing station. But what was that light? Had the engine crew found a switch for a previously hidden end-of-train device?
eri0229.jpg




No!
eri0230.jpg





eri0231.jpg




Shunting was quick, but out of some reasons the tarpaulins on the flat cars had been removed overnight - it was going to take a while to put them up again.
eri0232.jpg





eri0233.jpg




Across the summit, we immediately stopped at the sunrise spot. Quickly up the hill, the sun was just shining through the cloud layers!
eri0234.jpg




The first run-past, and the sun had risen behind the upper layer.
eri0235.jpg




The engine did not get far on these steep, slippery rails. By the end of the week we had learned to sand the rails ourselves, nobody from the railway staff moved a finger to do it.
eri0236.jpg




Train between the clouds.
eri0237.jpg





eri0238.jpg




From the opposite side.
eri0239.jpg





eri0240.jpg





eri0241.jpg




Until now, no run-past had been completed. The train manager himself spurred on the crew trackside.
eri0242.jpg




It still did not work.
eri0243.jpg




A short discussion.
eri0244.jpg




Yeah, finally made it!
The tries on video:

As the timing had not been perfect, we would go for the sunrise again by the end of the week.
eri0245.jpg




We rolled downhill to the 4-arch viaduct. Electric lines to the mountainside hamlets had been installed five years ago, water still must be carried by donkey. This would be an ideal regular job for the railway...
eri0246.jpg




Meeting of donkey caravans.
eri0247.jpg




What starts with a "K", and you can wear it over your shoulder?
eri0248.jpg




View into the mountains, weather unknown. We would continue downhill past Arbaroba in the afternoon.
eri0249.jpg




A first run-past across the viaduct, some photographer colleagues have been replaced by donkeys... ;)
eri0250.jpg



Next time: more donkey-viaduct-images, after the morning session we will visit Asmara depot.
 
Status
Not open for further replies.

Top