jamesontheroad
Established Member
- Joined
- 24 Jan 2009
- Messages
- 2,047
I had a very lucky escape from an operational meltdown on GA last night.
Boarded the 19:30 LST-NRW, but this was cancelled shortly before departure. Cue a stampede round to platform 12 for the equally busy 20:00 LST-NRW which was standing room only until north of Ipswich.
The stocking forming the 19:30 left ECS before we did, and we caught it up at Diss, where it was parked in the down platform. We came into the up platform where (after 15-20 minutes) the train was terminated due to a track defect. This was announced on Twitter just before 22:00, about 5 minutes before the crew announced it.
I was VERY lucky to be standing in the right place at the right time on the platform as local taxis were given the ok to start ferrying passengers to Norwich. There were only three cars available at first. GA Twitter said they were trying to source buses but I heard nothing more. I reckon 300-400 people queuing on the platform as we sped off.
From Twitter I understand the following trains to NRW were various cancelled at Ipswich or returned to London. I believe some may have transferred at Diss once the line re-opened.
Can anyone fill in the gaps?
Boarded the 19:30 LST-NRW, but this was cancelled shortly before departure. Cue a stampede round to platform 12 for the equally busy 20:00 LST-NRW which was standing room only until north of Ipswich.
The stocking forming the 19:30 left ECS before we did, and we caught it up at Diss, where it was parked in the down platform. We came into the up platform where (after 15-20 minutes) the train was terminated due to a track defect. This was announced on Twitter just before 22:00, about 5 minutes before the crew announced it.
I was VERY lucky to be standing in the right place at the right time on the platform as local taxis were given the ok to start ferrying passengers to Norwich. There were only three cars available at first. GA Twitter said they were trying to source buses but I heard nothing more. I reckon 300-400 people queuing on the platform as we sped off.
From Twitter I understand the following trains to NRW were various cancelled at Ipswich or returned to London. I believe some may have transferred at Diss once the line re-opened.
Can anyone fill in the gaps?