i read with some dismay that the relief lines between newport and cardiff are not to be wired ,therefore reducing capacity and there would be no electric freight .
why is there some much appathy towards electric freight trains in this country .
also does this also mean that the loops at pilning and hullavington plus foxhall junc to didcot north will not be wired as well ,therefore stopping the reintroduction of the oxford to bristol service which is very much missed in these parts.
why is there some much appathy towards electric freight trains in this country .
also does this also mean that the loops at pilning and hullavington plus foxhall junc to didcot north will not be wired as well ,therefore stopping the reintroduction of the oxford to bristol service which is very much missed in these parts.