I've just got back from a trip to the Netherlands by the Harwich to Hook of Holland ferry. There are now a couple of metro trains parked at the Hoek van Holland Haven station for the testing.

This is a link to a Google translation of an article about the testing at https://hoekselijn.mrdh.nl https://translate.googleusercontent...700205&usg=ALkJrhih3sL3AFognxdvfMt86-VJdMwjLQ

There are a mixture of tests at 40km/h, 80km/h and 100km/h. The current schedule is for it to start in the 4th quarter of 2018.

They have permission to extend the line towards the beach in the 1st half of 2021

 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

306024

Established Member
Joined
23 Jan 2013
Messages
3,940
Location
East Anglia
Thanks for the update. Permission to extend to the beach but do they have the finance in place too? The story was the beach bit was 'de-scoped' due to all the problems encountered so far.
 

bspahh

Established Member
Joined
5 Jan 2017
Messages
1,725
Thanks for the update. Permission to extend to the beach but do they have the finance in place too? The story was the beach bit was 'de-scoped' due to all the problems encountered so far.

The Google translation https://translate.googleusercontent...700205&usg=ALkJrhhI4h-PbBAg8gVzlTjMWgugpZ9PUg
of this letter https://www.rotterdam.nl/bestuur-or...DEF-Raadsbrief-DO-Verlenging-(eindversie).pdf says that it has been calculated to cost €74.6m and that they already have €59.5. They have applied to Provincial States for the extra funding.

Decision-making on this by the Provincial States is anticipated on 27 June 2018.
 

306024

Established Member
Joined
23 Jan 2013
Messages
3,940
Location
East Anglia
Thanks again. Hopefully the funding gap will be bridged. Most people pass through the Hook but it is worth spending a bit of time there. The lifeboat museum is interesting in itself.
 

Groningen

Established Member
Joined
14 Jan 2015
Messages
2,866
According to Wiki they should run from December 2018 (but you never know) to Hoek van Holland Haven. Hoek van Holland Strand in 2021.
 

chubs

Member
Joined
30 Oct 2012
Messages
656
You have to wonder if it was really worth all that money and time, the sprinter service seemed to work well enough all the way to the beach....
 

radamfi

Established Member
Joined
29 Oct 2009
Messages
9,267
You have to wonder if it was really worth all that money and time, the sprinter service seemed to work well enough all the way to the beach....

Hoek van Holland Strand NS station was a long way from the beach. If the Metro gets there, it will be right by the beach. The rail replacement bus service currently goes to the beach.
 

dutchflyer

Established Member
Joined
17 Oct 2013
Messages
1,237
Once, years ago, when BR ran ferries and shared this line with the Dutch Zeeland Steamship Comp, the trains- what is now the end- DID run as far as the then beach. I grew up very nearby there. and we often went there on dads bike.
However, after they extended the long piers to protect the canaf from sanding in, the beach was then also partly artficially extended with sand blown in and partly by natural ways as the currents brought more sand in. Thats why the beach got further and further away from the tracks.
When finally running it will run into Rotterdam centre (change for NS at Schiedam)-similar to the converted former oldest electric railline (and much neglected after) from Rotterdam to den Haag via Pijnacker.
 

Groningen

Established Member
Joined
14 Jan 2015
Messages
2,866
New estimation of running is January 2019. Just heard on the radio.
 

eastwestdivide

Established Member
Joined
17 Aug 2009
Messages
2,532
Location
S Yorks, usually
New estimation of running is January 2019. Just heard on the radio.
Also a longer story (in Dutch) here: https://www.ad.nl/rotterdam/hoekse-lijn-rijdt-op-zijn-vroegst-eind-januari~ae96a280/
De Hoekse Lijn gaat dit jaar definitief niet meer rijden. De nieuwe metroverbinding naar Hoek van Holland kan op zijn vroegst pas eind januari passagiers gaan vervoeren.
...
De software is de reden van de extra vertraging. Ondanks 'indringende gesprekken' van Visser met leverancier Bombardier, heeft dat bedrijf aangegeven dat het de programmatuur niet eerder kan leveren dan op 5 november. Daarna zijn er nog minimaal tien tot elf weken nodig voor het uitvoeren van het vergunningtraject en het testrijden met lege metro's
roughly summarised (Dutch speakers, feel free to correct!):
Software problems, new programming (software) delivered no earlier than 5 November, and a minimum of 11 weeks to do test runs.
 

Groningen

Established Member
Joined
14 Jan 2015
Messages
2,866
The railwaytrack is also open to freight till Maassluis. Hoek van Holland can also, but later or never.
 

superjohn

Member
Joined
11 Mar 2011
Messages
531
I have just watched a moving metro train from the deck of Stena Hollandica. The platform display at Hoek van Holland Haven was also showing trains due in three, six and nine minutes. It looks like they are simulating a full service so hopefully we won’t have to wait much longer. It won’t be a moment too soon, the bus replacement is a pain in the behind.

I’m curious if the beach extension is still expected to go ahead. The former through platforms have become a wasteland and the metro line terminates in a dead end platform alongside the ferry terminal. Restoring the connection to the beach will require considerable work as a result. Far more work than it would need if the current layout had been arranged to facilitate future extension.
 

AlexNL

Established Member
Joined
19 Dec 2014
Messages
1,682
Last week a new issue was uncovered, relating to the closing times of level crossings. There has been an incident where the barriers at a LC weren't fully lowered yet while a metro train passed. This has an impact on the service authorisation.

The extension to the beach is still planned, but because the whole project is delayed this extension has been pushed back as well. Service to the beach are now expected to start operating in 2021 (this was planned for 2019).
 

sprunt

Member
Joined
22 Jul 2017
Messages
1,156
How will the conversion to metro affect Rail Sail tickets? When I did the Harwich->Hoek trip a few years ago, I was given two NS day passes (which was an unexpected bonus as I was staying in Rotterdam but doing some other travel around the Netherlands while I was there - I bought a ticket from Hoek->Rotterdam and kept the day passes for future use). Will this still be the case, and the NS day tickets will now be valid on the Rotterdam metro?
 

radamfi

Established Member
Joined
29 Oct 2009
Messages
9,267
How will the conversion to metro affect Rail Sail tickets? When I did the Harwich->Hoek trip a few years ago, I was given two NS day passes (which was an unexpected bonus as I was staying in Rotterdam but doing some other travel around the Netherlands while I was there - I bought a ticket from Hoek->Rotterdam and kept the day passes for future use). Will this still be the case, and the NS day tickets will now be valid on the Rotterdam metro?

You now get a combined NS/RET ticket. See this for a picture of the ticket:

https://travel.stackexchange.com/qu...e-lijn-to-metrolijn-b-affect -rail-sail-tickets

It is valid on the whole RET network, not just for connection to the railway.
 

AlexNL

Established Member
Joined
19 Dec 2014
Messages
1,682
The latest update: it's uncertain if the metro trains will run when the beach season starts (May 2019). This is due to the earlier mentioned LC issue, but also because of frequent train-track communication issues, which brings trains to a standstill.
 

chubs

Member
Joined
30 Oct 2012
Messages
656
What's going to happen to all the other platforms at Hook van Holland Haven?

I believe there were 6 at one point, but only 3 in use towards the end of rail operation? If they're now down to 1 the place is going to look a bit derelict.
 

30907

Veteran Member
Joined
30 Sep 2012
Messages
17,864
Location
Airedale
What's going to happen to all the other platforms at Hook van Holland Haven?

I believe there were 6 at one point, but only 3 in use towards the end of rail operation? If they're now down to 1 the place is going to look a bit derelict.
The old station area is already derelict. There are 2 new platforms, pretty basic stuff.
 

superjohn

Member
Joined
11 Mar 2011
Messages
531
One is essentially the former terminating spoor 3, directly alongside the ferry terminal building, albeit shortened. The other platform is offset from the end of it, in much the same way as platforms 1&2 at Clapham Junction are set up, if you’re familiar with that.

I’ve just checked Google Earth and their current satellite image shows the final layout pretty well. There is now no trace of the former international terminating platforms or the old through platforms 1&2. The old beach line has been severed at the level crossing but seems intact beyond there.
 

chubs

Member
Joined
30 Oct 2012
Messages
656
Thanks.

Seems an odd way to do things if they do intend to carry on to the beach!
 

AlexNL

Established Member
Joined
19 Dec 2014
Messages
1,682
Thanks.

Seems an odd way to do things if they do intend to carry on to the beach!
The beach extension isn't part of the initial project as it wasn't part of the funding package.

It's a relatively big project, as it involves moving Hoek van Holland Strand station from its current location (where the beach once was) to a new location at the start of the beach. This means building 1km of new tracks, building a new station, and dealing with people living close to the railway.
 

Groningen

Established Member
Joined
14 Jan 2015
Messages
2,866
Some people are getting desperate about the Hoekse Lijn. On the website of Rijnmond.nl (Rijnmond is roughly the area from Rotterdam west to the Northsea). If you search for Sandy Struijs on that website you hear her complaints about the line. The melody is taken from In the navy by The Village People. It seems to be still a positive song.
 

37201xoIM

Member
Joined
29 Apr 2016
Messages
334
So I take it there's still no word of an opening date? I've been avoiding the Hoek ferry until I can be confident of not having to get a bus either from Rotterdam or indeed at Harwich (I presume they did finally sort that ridiculous farce with the boarding arrangements at HPQ?).
 

bspahh

Established Member
Joined
5 Jan 2017
Messages
1,725
So I take it there's still no word of an opening date? I've been avoiding the Hoek ferry until I can be confident of not having to get a bus either from Rotterdam or indeed at Harwich (I presume they did finally sort that ridiculous farce with the boarding arrangements at HPQ?).

I don't think you need to board at Harwich on a bus anymore. Certainly not the last time I used the ferry in May last year.
 

306024

Established Member
Joined
23 Jan 2013
Messages
3,940
Location
East Anglia
The linkspan at Harwich was finally repaired at the second attempt a while back now.

The bus service to Schiedam on the Dutch side is not really a problem unless you get travel sick on buses. The fast bus runs non-stop. Quite why people see a bus as the Devil’s transport is a bit of a mystery, certainly not worth avoiding the ferry for. More inconvenient for the locals that live there though, who must be fed up of the saga of trying to extend the Rotterdam metro.
 
Last edited:

37201xoIM

Member
Joined
29 Apr 2016
Messages
334
For me the issue (Harwich problems aside) has been more the poor interchange arrangements and info at the Schiedam end, especially if one is on an international ticket, in particular in light of the paucity / absence of staff (RET or NS) and the need to get through those ghastly barriers. The first time I did it towards Hoek, it was pure chance that I found the (very inconveniently located) bus stop, after having "tailgated" somebody through the barrier.
 
Status
Not open for further replies.

Top