One of the possible areas for cost reduction is the signalling required to manage the planned number of trains per hour.
I wonder what signalling system is planned and how it would be reduced to save money?
I believe the current ORR rules say HS2 must use ETCS/ERTMS. What changes could make it cheaper?
One of the possible areas for cost reduction is the signalling required to manage the planned number of trains per hour.
I wonder what signalling system is planned and how it would be reduced to save money?
I believe the current ORR rules say HS2 must use ETCS/ERTMS. What changes could make it cheaper?